Presentation is loading. Please wait.

Presentation is loading. Please wait.

~40 meters Upstream ~20 meters Downstream Progress Report, March 12, ‘04.

Similar presentations


Presentation on theme: "~40 meters Upstream ~20 meters Downstream Progress Report, March 12, ‘04."— Presentation transcript:

1 ~40 meters Upstream ~20 meters Downstream Progress Report, March 12, ‘04

2 Don’t panic! Each colored tile has it’s own PDF file. (and the downstream side is much simpler)

3

4

5 I can’t quite reconcile the physical location in space of the chambers with the known HEB beam centers. So- until I learn more, the HEB is simply centered in the chamber outboard of the transition.

6 The spreadsheet is named: PEPII_IR_Vac_Ref_HER.xls

7 Shaded area shows Z locations at which I have centered the HEB in the chamber on the upstream layout. (Mike and I are happy with the downstream side)

8

9 Section View Name (A-A) corresponds to the alphabetical name in the PDF files.

10

11

12 U:\c\clcarr\MDBackup\DriveC\AutoBackup\DrawingFiles \Odd Jobs\IR_Vac_Layout\Sections\

13

14 Hopefully these will be friendly to deal with. If there are difficulties or questions about the graphics, please call me at X2168 or e-mail me: clcarr@slac.stanford.edu

15 Try to figure out where my modeling problem is Wait to see how useful this information is and fill requests for more sections as they come


Download ppt "~40 meters Upstream ~20 meters Downstream Progress Report, March 12, ‘04."

Similar presentations


Ads by Google