Presentation is loading. Please wait.

Presentation is loading. Please wait.

Scenes from Parsons Hall Renovation 2009 - 2013.

Similar presentations


Presentation on theme: "Scenes from Parsons Hall Renovation 2009 - 2013."— Presentation transcript:

1 Scenes from Parsons Hall Renovation 2009 - 2013

2

3 Parsons Hall Layout

4 Iddles Wing Renovation was completed in the summer of 2010 Can you decipher this new version of the Periodic Table?

5 Other views of Iddles Renovation

6 New lights, same old periodic table!

7

8 The Chemistry Library has a New Entrance and Conference Room

9 Back parking lot and a new entrance: The “Southwest Knuckle”

10

11 The courtyard granite sculpture was destroyed last year by a falling branch during a thunderstorm!

12 The west wing (nearest to Kingsbury) is under construction

13 West wing 1 st floor in February 2011. The analytical labs were originally at right.

14 West wing 2 nd floor in February 2011. P Chem labs (far end on right) are gone!.

15 West wing 2 nd floor from the other end. February 2011

16 The stockroom is temporarily in the Southwest (G) wing. February 2011

17 February 2011 A temporary walkway across the courtyard.

18 The Southwest (G) wing in February 2011

19 Professor Zercher meets with the architects to refine plans.

20 Signs everywhere …

21 March 2011 Amy Lindsay gets a special hat…

22 April 2011 Walls go up in the West Wing

23 April 2011 A new lab goes up!

24 To be continued…. Stay tuned for scenes from the “Summer Slammer”, an accelerated renovation of our teaching labs (Southeast Wing) in summer 2011.

25 The “summer slammer” begins May 2011. This is what the organic teaching labs look like now!


Download ppt "Scenes from Parsons Hall Renovation 2009 - 2013."

Similar presentations


Ads by Google