Presentation is loading. Please wait.

Presentation is loading. Please wait.

April, 2005 EPICS Collaboration Controls Group EDM at Jefferson Lab B. Bevins, T. Carlino, J. Sage.

Similar presentations


Presentation on theme: "April, 2005 EPICS Collaboration Controls Group EDM at Jefferson Lab B. Bevins, T. Carlino, J. Sage."— Presentation transcript:

1 April, 2005 EPICS Collaboration Controls Group EDM at Jefferson Lab B. Bevins, T. Carlino, J. Sage

2 Controls Group April, 2005 EPICS Collaboration MEDM EDM Converter  Working well  Routinely used for mass conversions of several thousand screens  Can be used to convert on the fly from within EDM  Lead developer retired in December  No new development since then

3 Controls Group April, 2005 EPICS Collaboration EDM Screen Generation  Currently we generate many MEDM screens with small C programs using a library.  Screens are then converted to EDM.  We plan to update this library to generate EDM screens directly without rewriting the screen generation programs.  Status:  Being developed by an accelerator operator  Prototype expected this summer


Download ppt "April, 2005 EPICS Collaboration Controls Group EDM at Jefferson Lab B. Bevins, T. Carlino, J. Sage."

Similar presentations


Ads by Google