Download presentation
Presentation is loading. Please wait.
1
Modeling Ecological Performance Indicators for the Lake Ontario/St. Lawrence River Water Levels Study
2
April 9, 2002 Project Objectives – Phase 1 Form a modeling team to build an ecological response model for analysis of potential flow regulation plans in the Lake Ontario-St. Lawrence River system Develop Conceptual Framework for the LOSL Ecosystem Model Develop and vet a simple prototype LOSL Ecosystem Model Prepare a Plan for LOSL Ecosystem Model development and application
3
April 9, 2002 Tasks for Phase 1 1.Form LOSL ecosystem modeling team LTI, IWR, ETWG chair, selected experts 2.Modeling team will develop a draft conceptual model Conceptual Model will include: Select Performance Indicators to include in model framework; Define Measure/s of each Performance Indicator (e.g., population dynamics and growth of smallmouth bass); Determine stressors and processes affecting each Measure of each Performance Indicator; Develop kinetic structure of conceptual model (i.e., box- and-arrow diagram). This task will utilize: Literature review Site-specific research Expertise of modeling team
4
April 9, 2002 Tasks for Phase 1 (con’t) 3. Develop a simple prototype (mock) model to demonstrate the utility of the full conceptual model. 4. Vet the prototype model to key members of the ETWG Acquire additional knowledge base Revise prototype model
5
April 9, 2002 Tasks for Phase 1 (con’t) 5. Develop Design Criteria for LOSL Ecological Model Consider linkages with H&H and coastal models and Shared Vision Model Consider model flexibility and ease of refinement Consider visualization capabilities Develop configuration of model to the LOSL system, including selection of temporal and spatial resolution and representation of wetlands and other key habitats in the model Other design criteria in consultation with EWTG and Study Group
6
April 9, 2002 Tasks for Phase 1 (con’t) 6. Hold workshop to demonstrate conceptual model, prototype model and design criteria to ETWG, Study Group, and other key stakeholders. Workshop in early September Get feedback during workshop and incorporate into conceptual model and design criteria
7
April 9, 2002 Tasks for Phase 1 (con’t) 7. Prepare Ecosystem Model development and application plan. Include: Conceptualization and assumptions Code language and structure Input/output design Calibration strategy Application approach and linkage with Shared Vision Model
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.