IBL and SLHC activities at LPNHE Paris 2011 - 2012 – 2013 Réunion Atlas France - 10 octobre 2012
2
IBL activities D. Laporte (IE) 90% P. Ghislain (AI) 10% B. Grosjean (student) 2 months
3
IBL parts End ring (x5), Al Central ring (x3), Al and PEEK X0 optimization
4
IBL Mockup Dummy staves (x14) Titanium screws Peek sliding parts Carbon fiber tube
5
Fitting at PP1 with LAPP
6
Fitting tools
7
SLHC activities D. Laporte (IE) 90% F. De Matos (IR) 50% P. Ghislain (AI) 10% Y. Orain (AI) 50 % B. Grosjean (student) 2 months S. Bouaziz (student) 6 months
8
Activities Cartigny design with CPPM Xo evaluation for differents group – UNIGENE : super modules – LBNL : Ibeam solution – Cartigny – Alpine stave – Barrel & Endcap calorimeter (response) FEA simulations – Cartigny Mechanical support for silicium R&D.
9
Cartigny design with CPPM
10
Thermal simulations
11
Thermomecanics FEA
12
X0 development Mode batch Fichier Paramètres Contrôle répertoire Message fin Non Oui Test mémoir e Macro catia Non Oui Catia Ecriture données Angle + pas Limite angle Non Oui Non Oui Macro IBM Developments by LPNHE Team, and IAO team (CCIN2P3) Additional layers have been developed, to cope with : CATIA memory management limitations Traceability of design analyses Huge output : scan on 0.1 by 0.1 grid 1.5 Gb file
13
X0 examples : Ibeam DistanceXo En bleu clair, mousse (X0=2130 mm) En cyan, structural beam en forme de I (X0=224 mm) En vert, Face sheet (X0=224 mm) En rouge, cooling pipe (Alu, X0=88.97 mm) En noir, cooling fluid (C3F8, X0=215.25 mm)
14
X0 examples : Alpine layer 3 Endblock Sensors Foam Face plate Omega tube X0 eta Epaisseur (mm)
15
Total cost : IBL Parts – Ti screws2,2K€ IBL mockup – Composite tube 1 K€ – Dummy pipe (steel)0,2 K€ – Sliding parts (PEEK)0,5 K€ – Dummy staves0,5 K€ IBL fitting – Tools0,2 K€ Total ---------- 4,6 k€ SLHC (prevision for 2013) – X0 software adaptation2 K€ – Purchase of materials for prototyping/testing2 K€
16
Perspectives IBL – LPNHE commitments delivered – Participation to installation 4 k€ travels in 2013 SLHC – X0 software adaptation2 K€ – Purchase of materials for prototyping/testing2 K€