Presentation is loading. Please wait.

Presentation is loading. Please wait.

SPS 200 MHz RF Upgrade Eric Montesinos LIU-SPS coordination meeting 18 December 2013.

Similar presentations


Presentation on theme: "SPS 200 MHz RF Upgrade Eric Montesinos LIU-SPS coordination meeting 18 December 2013."— Presentation transcript:

1 SPS 200 MHz RF Upgrade Eric Montesinos LIU-SPS coordination meeting 18 December 2013

2 Intervenants 18 December 20132LIU SPS RF Dep-GroupPersons BE-RF Eric Montesinos, Charles Julie, SPS power team, Thomas Bohl, Wolfgang Höfle, Urs Wehrle, Elena Shaposhnikova, Philippe Baudrenghien BE-ABPGhislain Roy (BE space manager), Patrick Bestmann, Yannis Papaphilippou BE-ASREmmanuel Paulat BE-BIChristian Boccard, Patrick Odier DGS-SEEGuillaume Fontana, Cécile Pinto EN-CVMauro Nonis, Glen Mason EN-ELGuillaume Gros, Jean-Pierre Sferruzza, Christophe Crombez EN-HE Caterina Bertone, Pascal Brunero, Serge Pelletier, Yann Seraphin EN-MEFFrédéric Galleazzi, Yvon Muttoni, David McFarlane, Antoine Kosmicki GS-SELuz-Anastasia Lopez-Hernandez TE-VSCPaolo Chiggiato, Antonio Mongelluzzo TE-MSCJérémie Bauche

3 A single Budget Code : 69041 Please, make all your requests with a detailed description in the titles Budget 18 December 20133LIU SPS RF

4 THANK YOU FOR YOUR ATTENTION!


Download ppt "SPS 200 MHz RF Upgrade Eric Montesinos LIU-SPS coordination meeting 18 December 2013."

Similar presentations


Ads by Google