Download presentation
Presentation is loading. Please wait.
Published byMoses Terry Modified over 9 years ago
1
Muon Meeting 11/11/2009: Introduction G. Passaleva
2
29/11/2006 Muon Meeting Status Muon system is in good shape Muon L0 Ok Noise: a few noisy channels to “understand” – Set up the final thresholds and HV settings Timing: generally OK; a few subtle “bugs” are being corrected; reference timing will be determined with the latest cosmic runs Hardware: all the logical channels OK (except for a few units (<0.1%) HV, a few sparking gaps disconnected
3
29/11/2006 Muon Meeting Organization DPG: Alessia, Roberta, Bombepo: noise, timing, efficiency, hardware performance studies Giulia, Rolf, Walter: noise, timing, optimization Giacomo, GP: timing, monitoring, efficiency Stefania, Silvia, Patrizia,Giulia: alignment, efficiency Burkhard, Lukas: noise, threshold settings Sandro, Caterina, Davide: ECS, timing, thresholds Gaia, Alessio, Matteo muon ID Other items ?, other names ?
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.