Download presentation
Presentation is loading. Please wait.
Published byLetitia Riley Modified over 9 years ago
1
Very Forward Detectors Workshop on beam position monitoring and detector alignment
2
19 Apr 2007 Detlef Swoboda intro to FP420 BPM workshop2 FP420 BPM workshop Scope Scope: assess adequate technology for FP420 requirements Criteria: accuracy, resolution, acquisition speed (b-b) Concept of alignment monitoring and detector positioning Development time/cost Resources: i.e. available experts for mechanical layout, integration, electronics
3
19 Apr 2007 Detlef Swoboda intro to FP420 BPM workshop3 Workshop structure FP 420 Requirements Alignment requirements detector Alignment moving beam pipe Alignment strategies of other movable LHC detectors FP 220 Alignment requirements TOTEM Alignment LHCb-VELO Beam Position Monitors BPM design Signal Processing for BPMs DESY experience with BPMs and moving beampipes Discussion and conclusions
4
19 Apr 2007 Detlef Swoboda intro to FP420 BPM workshop4 FP420 locations
5
19 Apr 2007 Detlef Swoboda intro to FP420 BPM workshop5 Pre-design Version #3
6
19 Apr 2007 Detlef Swoboda intro to FP420 BPM workshop6 Detector and moving pipe
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.