Presentation is loading. Please wait.

Presentation is loading. Please wait.

Giovanni Polese 1 HV cabling multiconductor connettorization (600 ch) : pretest and fixing: 1 month * 2 people connectorization: 2 months * 2 people HV.

Similar presentations


Presentation on theme: "Giovanni Polese 1 HV cabling multiconductor connettorization (600 ch) : pretest and fixing: 1 month * 2 people connectorization: 2 months * 2 people HV."— Presentation transcript:

1 Giovanni Polese 1 HV cabling multiconductor connettorization (600 ch) : pretest and fixing: 1 month * 2 people connectorization: 2 months * 2 people HV cable-distrib: 1 month * 2 people people involved up to now: G. Passeggio, F. Cassese, A. Vanzanella A. Cimmino and P. Noli HV Patch Panel connection: 2 weeks * 2 people

2 Giovanni Polese 2 Power system Status New CAEN firmware 2.4. Is sync now OK ?? test in Napoli is OK ?? No offset change test at CERN next week !!! No news on the thermal drift !! LV tower cable installed (W+1+2-1-2) 1 more LV board + 3 HV boards broken 2 HV crates in CR (W+2 and W+1) have been connectorized and are under test (A. Cimmino) 3 more HV crates will be worked by CPE ??

3 Giovanni Polese 3

4 4

5 5

6 6 LV cabling tower and tower-tower cabling installation: (1 week * 2 people)/wh  5 weeks LV test: (1 week * 2 people)/tw  10 weeks temp test: (1 week * 2 people)/wh.  5 weeks Infrastructure cabling and test (1 week * 2 people)/wheel  5 weeks

7 Giovanni Polese 7 HV & LV components status Log scale

8 Giovanni Polese 8 Components - numbers modelloordinaticonsegnatimancanti SY1525220 A3485 - MACISTE312 A3512N - HV804733 BC A1676770 A3000 - CRATE34 0 A3000FB - FAN14 0 A3486S - MAO505 A3009 - LV60573 To modify Late delivery


Download ppt "Giovanni Polese 1 HV cabling multiconductor connettorization (600 ch) : pretest and fixing: 1 month * 2 people connectorization: 2 months * 2 people HV."

Similar presentations


Ads by Google