B.P. BIS Commissioning in point 8: follow-up 1 of 16 BIS Commissioning in Point 8 on week#17 (21st-> 25th April 08) 2 Controllers for LHC-ring BIS: 26.

Similar presentations


Presentation on theme: "B.P. BIS Commissioning in point 8: follow-up 1 of 16 BIS Commissioning in Point 8 on week#17 (21st-> 25th April 08) 2 Controllers for LHC-ring BIS: 26."— Presentation transcript:

1 B.P. BIS Commissioning in point 8: follow-up 1 of 16 BIS Commissioning in Point 8 on week#17 (21st-> 25th April 08) 2 Controllers for LHC-ring BIS: 26 links in total 1 Controller for LHC-ring BIS: 7 available links

2 B.P. BIS Commissioning in point 8: follow-up 2 of 16 Commissioning Procedure

3 B.P. BIS Commissioning in point 8: follow-up 3 of 16 CIBU Documentation

4 B.P. BIS Commissioning in point 8: follow-up 4 of 16 Input current limits

5 B.P. BIS Commissioning in point 8: follow-up 5 of 16 CIBU Input Specifications

6 B.P. BIS Commissioning in point 8: follow-up 6 of 16 EMC Compliance of interconnection

7 B.P. BIS Commissioning in point 8: follow-up 7 of 16 Electrical Architecture CIBU User System In USER rackIn INTERLOCK rackCable

8 B.P. BIS Commissioning in point 8: follow-up 8 of 16 Testing with ‘A’ and ‘B’

9 B.P. BIS Commissioning in point 8: follow-up 9 of 16 Testing with ‘A’ and ‘B’

10 B.P. BIS Commissioning in point 8: follow-up 10 of 16 Testing with ‘A’ and ‘B’ User System to User Interface TEST in the same way

11 B.P. BIS Commissioning in point 8: follow-up 11 of 16 BIS Commissioning: MTF steps (summary) 1. System (controller level) has completed IST 2-1. Reception of USER SYSTEM Inputs: Beam 1 (IST) 2-2. Reception of USER SYSTEM Inputs: Beam 2 (IST) 3-1. Verification of USER_PERMIT and CIBU functional response: Beam 1 3-2. Verification of USER_PERMIT and CIBU functional response: Beam 2 4-1. BIC BEAM_PERMIT (BP) response to USER_PERMITs (UPs): Beam 1 4-2. BIC BEAM_PERMIT (BP) response to USER_PERMITs (UPs): Beam 2 5-1. Transmission of BEAM_PERMIT_INFO(BPI) to User System: Beam 1 5-2. Transmission of BEAM_PERMIT_INFO(BPI) to User System: Beam 2

12 B.P. BIS Commissioning in point 8: follow-up 12 of 16 BIS Commissioning: MTF steps 3 & 4 (details) Step Value Units Comments CIBU_V for A: A=T & B=F 4>x <30 V Verify cable voltage at input-A (CIBU): USER_PERMIT_A = TRUE & USER_PERMIT_B = FALSE CIBU_I for A: A=T & B=F >9 mA Verify current at input-A (CIBU): USER_PERMIT_A = TRUE & USER_PERMIT_B = FALSE CIBU_V for B: A=T & B=F <1 V Verify cable voltage at input-B (CIBU): USER_PERMIT_A = TRUE & USER_PERMIT_B = FALSE CIBU_I for B: A=T & B=F <1 mA Verify current at input-B (CIBU): USER_PERMIT_A = TRUE & USER_PERMIT_B = FALSE Glitch Counter: A=T & B=F OK/Not OKVerify Glitch Counter for both input-A & input-B: USER_PERMIT_A = TRUE & USER_PERMIT_B = FALSE BIC response: A=T & B=F OK/Not OKVerify BIC response for both input-A & input-B: USER_PERMIT_A = TRUE & USER_PERMIT_B = FALSE History Buffer: A=T & B=F OK/Not OKVerify History buffer should show a trouble-free transition: USER_PERMIT_A = TRUE & USER_PERMIT_B = FALSE Re-do the above sequence with USER_PERMIT_A = FALSE & USER_PERMIT_B = TRUE

13 B.P. BIS Commissioning in point 8: follow-up 13 of 16 Verification in the BIC’s History buffer occurrence time

14 B.P. BIS Commissioning in point 8: follow-up 14 of 16 Measured values for A Input (when A=True) CIBUS.UA83.L8WIC23.60 Volts13.95 mA CIBUS.UA83.L8Vacuum b1b223.3313.70 CIBUS.UA87.R8Vacuum b1b223.3013.96 CIBUS.UA87.R8LHCb_DET4.2011.00 CIBUS.UA87.R8LHCb_Mov23.9014.23 CIBUS.UA87.R8LHCb_Mag3.1710.00 CIBUS.UA83.L8PICL_MSK10.9111.86 CIBUS.UA83.L8PICL_UNM10.8211.86 CIBUS.UA87.R8PICR_MSK10.8111.85 CIBUS.UA87.R8PICR_UNM10.8411.85 CIBUS.UA83.L8BLM_MSK4.1510.39 CIBUS.UA83.L8BLM_UNM4.1510.48 CIBUD.UA87.R8BTV-b24.6610.97 CIBUS.SR8.INJ2COLL_MOT-b222.8413.46 CIBUS.SR8.INJ2COLL_ENV-b223.8013.94 CIBUS.SR8.INJ2Vacuum b223.6014.17 CIBUS.SR8.INJ2LHCb Injection Inhibit4.2010.95 CIBUS.SR8.INJ2MKI823.6810.15 CIB.UA83.L8.B1.B2COLL_MOT-b1-b223.0913.45 CIB.UA87.R8.B1.B2COLL_MOT-b1-b223.0013.40 CIB.UA83.L8.B1.B2COLL_ENV-b1-b223.9013.85 CIB.UA87.R8.B1.B2COLL_ENV-b1-b223.8013.95 CIB.UA83.L8.B1.B2Vacuum b1-b223.3213.60 CIB.UA87.R8.B1.B2Vacuum b1-b223.8014.09

15 B.P. BIS Commissioning in point 8: follow-up 15 of 16 summing up ●Fruitful collaboration BIS  User Systems ●Most of the links (LHC-ring BIS) have been validated – LHCb Detector & Velo: both OK – LHCb Magnet signal out of limits => test postponed ●Links for Injection Inhibit partially done: – CIBU for Beam-2 Inhibit: input signals OK – CIBF for Beam-1 Inhibit: input signals OK – Tests are going to continued when cable and F.O. will be in place.