Presentation is loading. Please wait.

Presentation is loading. Please wait.

MUHAMMAD AIZUDDIN B. RAMLY AE09018 NORAISYAH BINTI NASHARUDDIN AE09040 SITI MARINI BINTI SAAT AE09012.

Similar presentations


Presentation on theme: "MUHAMMAD AIZUDDIN B. RAMLY AE09018 NORAISYAH BINTI NASHARUDDIN AE09040 SITI MARINI BINTI SAAT AE09012."— Presentation transcript:

1 MUHAMMAD AIZUDDIN B. RAMLY AE09018 NORAISYAH BINTI NASHARUDDIN AE09040 SITI MARINI BINTI SAAT AE09012

2 INTRODUCTION Construction waste consists of unwanted material produced directly or incidentally by the construction. T here are many factors and solution to overcome construction waste. Objectives 1. Investigate the factors cause the construction waste 2. Determine the best way to overcome the waste problem

3 Research question 1. What are the factors that cause the construction waste? 2.What are the best way to overcome the construction waste problem?

4 Research Methodology UMP student(2 nd year only) 30 respondent 30 questionnaire

5 Result and Analysis Faniran and Caban, (1993) the five most significant sources of construction waste : design changes leftover material scraps wastes from packaging and non-reclaimable consumables, design/detailing errors poor weather.

6 Teo and Loosemore (2001) recommended that people’s behavior and attitudes plays important role in managing construction waste.

7 Zhao, Leeftink and Rotter (2009) recycle construction waste can contribute to a lot of benefits.

8 Conclusion The factor cause construction waste I. leftover material scraps II. human behavior The best way to overcome 1. Recycle

9


Download ppt "MUHAMMAD AIZUDDIN B. RAMLY AE09018 NORAISYAH BINTI NASHARUDDIN AE09040 SITI MARINI BINTI SAAT AE09012."

Similar presentations


Ads by Google