1 Apparatus and Method To Test Drilling Fluid Stability “Sag Tester™”
Associate Prof. Shteryo Lyomov, Ph.D. Mining and Geology University Department Of Drilling and Oil and Gas Production 1700 Sofia BULGARIA

2 Project Background Field problems associated with drilling mud stability leading to barite sagging/hole cleaning still exist. Lack of relevant/suitable equipment for direct testing of drilling mud stability at the rig site and laboratories with respect to stability (barite sagging). Gained experience in barite sag investigation.

3 Project Goals Pre – project. Project.
Development of equipment - hardware and software; Tuning the equipment (sensitivity, accuracy, reliability and software debugging) at lab conditions and setting of initial criteria for drilling mud evaluation. Project. Development and production of industrial Sag Tester™; Conducting of training seminars for the sponsors; Field testing and implementation; Field debugging of the firmware and software; Verify mechanical/software reliability; Determining best operation practice; Commercial promotion.

4 Description The barite Sag Tester™ uses pressure measurements in order to evaluate drilling mud stability. The main idea is based on the Boycott effect and is a further development of the work published by P. Skalle, K. R. Backe, S. K. Lyomov et. al.* *P. Skalle, K.R. Backe, S.K. Lyomov et. al. “Barite Segregation in Inclined Boreholes” JCPT, special Vol. I, paper Pressure measurements are used because the process of barite/particle settling influences strongly/mostly the drilling mud density.

5 Description, (continued)
Barite Sag Tester™* Components. V – pipe; Z – pipe;  – well bore inclination; Bypass valve; Pressure sensors; Temperature sensor; D/A and control system. * Patent Pending Reg. No /BGR patent office.

6 Description, (continued)
Drilling mud is poured into the barite Sag Tester™, while the valve is opened. This assures equal height of the mud columns in the V - pipe and Z - pipe. Then the valve is closed, pressure and temperature measurements are taken in an interval of sec/min for a period of h. The difference between the pressures measured in the bottom of V - pipe and Z-pipe after a ? h time interval is a direct indication for drilling mud stability. The results from a testing two drilling mud are shown on the next 2 slides.

7 Description, (continued)

8 Description, (continued)

9 Mud Stability Evaluation Criteria
Pressure reduction in the V – pipe dP1; Pressure reduction in the Z – pipe, dPz2; Bottom hole T and P; Borehole inclination – .

10 Sag Tester™ Features Simple principle of measurement;
Quartz pressure sensors with high accuracy; Temperature measurement; PC based D/A and control system allows real time measurement of the drilling mud behavior; The Sag Soft™ software accounts for the influence of the borehole P, T as well as inclination – ; Simple to use at laboratory and at the rig site.

11 Competitive Analysis Competitors. Strengths. Limitations.
sag index, sag number and sag register; software (HYDRAUL™, MUDMAN™); controlled stress and low shear rate/gel measurements. Strengths. Equipment/software exists on the market. Limitations. track the barite sag, not predict (sag index/register), impractical to use (sag number) ; not direct measurements; flow conditions in wellbore differ from these in the viscometer.

12 Competitive Analysis, (continued)
Sag Tester™. Strengths. Uses simple principle; Direct measurement of the mud parameter related to the barite sagging - density/pressure; Easy to operate and analyze - PC/Sag Soft™ software. Limitations. New unknown equipment; Lack of field experience/data; Needs market promotion.

13 JIP Team/Resources Team working on the project.
Project leader – Ass. Prof. Sht. Lyomov, Ph.D. Experimental work leader- Ass. Prof. L. Gerov, Ph.D. Design work leader - Prof. N. Nenkov, Ph.D. Electronics - Rhoe BG electronics Ltd. Manufacturing - University workshop, ZMM - Sofia.

14 JIP Team/Resources, (continued)
Project resources. Pre - project 64,000 $ (4 participants $ each) Project 175,000 $ (5 participants $ each) Location. Mining and Geology University, Department Of Drilling and Oil & Gas Production, 1700 Sofia, BULGARIA.

15 Schedule Pre - project 12 months. Design 2 months Project 12 months.
Building the Sag Tester set up 3 months Laboratory testing 7 months Project months. Design/production industrial prototype 2 months Testing of industrial prototype 9 months Field implementation and testing 9 months Data analysis and final reporting 6 months

16 Expected Results Development of apparatus and method to test drilling mud stability with respect to barite sag – The Sag Tester™. Set and field prove of criteria for drilling mud evaluation. Development of software Sag Soft™ to predict mud behavior based on measurement with the Sag Tester™. Market promotion of new equipment and technology, that reduces lost time for mud conditioning/circulation and extra expenses.

17 Thank you for your attention!