Innovation within Continuity
Classic and New VD4
2
Contents Introduction / General Low/mid duty – high duty
Classic and New VD4 Contents Introduction / General Low/mid duty – high duty Ratings / Standard Design / Dimensions Operating mechanism Maintenance Accessories / Standard and on request Other / Special Marketing tools Confirm overall economic outlook. Discuss how they measure productivity at the business level? Value-added per Employee Other?
3
Introduction / General
Classic and New VD4 Introduction / General The product name VD4 does not change VD4 as a brand-name for a high quality VCB is well-accepted The actual VD4 name is now defined to “classic VD4” Availability of “new VD4” Production started in February 2003 Market introduction almost completed according to marketing plan “One CB factory: The advantage of EoS in VCBs DECMS: Excellence in vacuum, casting and embedding technology ITNIE: Excellence in AT & Logistics and production engineering Confirm overall economic outlook. Discuss how they measure productivity at the business level? Value-added per Employee Other?
4
Introduction / General
Classic and New VD4 Introduction / General An innovative concept for the maintenance new VD4 has an actuator with a plug-in snapping-unit just replacing the snapping-unit the c.breaker is basically a new c.breaker new VD4 is the first MV circuit-breaker offering this feature removal and mounting of the snapping-unit requires only 20 min. the replacement operation is more reliable then any maintenance operating life of the snapping unit up to 31.5 kA 17.5 kV (25 kA 24 kV) : today: 10,000 operations already certified today: 20,000 operations satisfactory carried-out within 4Q 2003: 30,000 operations Confirm overall economic outlook. Discuss how they measure productivity at the business level? Value-added per Employee Other?
5
Low/mid duty – high duty
Medium Voltage Products Low/mid duty – high duty new VD4 classic VD4 12kV > 2500A kA 12kV A kA 17.5kV > 2500A kA 17.5kV A kA 36kV A kA 40.5kV A kA 12kV A kA 17.5kV A kA 24kV A kA VD4 Confirm overall economic outlook. Discuss how they measure productivity at the business level? Value-added per Employee Other? low/mid duty high duty and ANSI ratings for ADVAC
6
Ratings / Standard new VD4 vacuum circuit breaker :
Classic and New VD4 Ratings / Standard new VD4 vacuum circuit breaker : only embedded poles fixed and withdrawable versions compliance to IEC ( ) STDs low/mid duty: 12 kV, A, kA 17,5 kV, A, kA 24 kV, A, kA ( up to 40/50 kA within 4Q 2003 ) Confirm overall economic outlook. Discuss how they measure productivity at the business level? Value-added per Employee Other?
7
Design / View classic VD4 new VD4 Classic and New VD4 e.g.
VD p=150mm new VD4 VD p=150mm Confirm overall economic outlook. Discuss how they measure productivity at the business level? Value-added per Employee Other?
8
Design / Dimensions Classic and New VD4 Design Classic New Remark
common look & feel according to PTMV strategy No Yes geometry and colour of front plate alignment of ON/OFF push buttons vertical horizontal different positions operating cycle counter, position indicator, charging condition indicator yes servicing of manual spring charging external lever built-in lever different position Dimensions Classic New Remark available versions of fixed construction concerning housing width a [mm] 450 570 610 700 750 *) **) e.g P=150mm Confirm overall economic outlook. Discuss how they measure productivity at the business level? Value-added per Employee Other? (*) mm standardized with 570 mm (no changes in the pole distance) (**) 750 mm standardized with 700 mm (no changes in the pole distance)
9
Design / Dimensions Different position of ON / OFF buttons Classic VD4
and New VD4 Design / Dimensions Different position of ON / OFF buttons Confirm overall economic outlook. Discuss how they measure productivity at the business level? Value-added per Employee Other? Classic VD4 fixed version , P150 New VD4 fixed version , P=150
10
Design / Dimension of front plate
Classic and New VD4 Design / Dimension of front plate Confirm overall economic outlook. Discuss how they measure productivity at the business level? Value-added per Employee Other? New VD4
11
Design / External dimensions
Classic and New VD4 Design / External dimensions Classic VD4 fixed version P1 P4 P2 P5 12 kV, A, kA 17.5 kV, A, kA p H a b c d e mm mm mm mm mm mm mm 24 kV, A, ,kA ) ) 12 kV, A, kA 17.5 kV, A, kA p H a b c d e mm mm mm mm mm mm mm ) ) 24,kV, A, ,kA ) 1) measuring point pole part 2) pole with heat-sink 616 mm 3) pole with heat-sink 661 mm E
12
Design / External dimensions
Classic and New VD4 Design / External dimensions New VD4 fixed version P1 P4 P2 P5 12 kV, A, kA 17.5 kV, A, kA p H a b c d e mm mm mm mm mm mm mm (A) (B) 24 kV, A, ,kA ) (B) ) (C) 12 kV, A, ,5 kA 17.5 kV, A, kA p H a b c d e mm mm mm mm mm mm mm ) (B) ) (C) 24,kV, A, ,kA ) 1) measuring point pole part 2) pole with heat-sink 616 mm 3) pole with heat-sink 661 mm (A) fully interchangeability with classic VD4 by fixing points 345 x 400 (B) fully interchangeability with classic VD4 by fixing points 345 x 520 (C) fully interchangeability with classic VD4 by fixing points 345 x 650
13
Classic and New VD4 Dimension / Design Withdrawable circuit breaker (available for the time being) Panel / Frame Rating Classic New p ZS1, PowerBloc, Mounting frame 12 / 17,5 / 24 kV 31,5 / 31,5 / 25 kA A Yes Yes (1) 12 / 17,5 kV: 150, 210 mm 24 kV: 210, 275 mm A UniGear type ZS1 31,5 / 31,5 / 25 kA ZS8.4 with and without tee-off partioning 25 / 20 / 25 kA Yes (2) CBE - CBF 1250 …2500 A (3) 12/17,5 kV:150, 210, 275mm 24 kV:210, 275 mm PowerBox Confirm overall economic outlook. Discuss how they measure productivity at the business level? Value-added per Employee Other? OK at kV; Under development at 24 kV with distance between terminals 380 mm Under development Yes with assembled pole; NO with embedded poles
14
Operating mechanism (type EL / new VD4)
Classic and New VD4 Operating mechanism (type EL / new VD4) A Open/closed auxiliary contacts B Auxiliary circuits terminal box C Charged/discharged closing springs mechanical indicator D Closing push button E Opening push button F Auxiliary releases (opening / closing / undervoltage) G Electrical accessories plug-socket connectors H Closing spring motor geared I Circuit-breaker open/closed mechanical indicator L Built-in closing spring charging lever M Mechanical operation counter N Opening spring O Damper (opening) A B C D E F G H I L M O N
15
Operating mechanism / Characteristics
Classic and New VD4 Operating mechanism / Characteristics Mechanism Classic New Remark plug-in actuator module No Yes spring charging lever external lever built-in lever manual operated closing spring spiral spring helicoidal spring spring recharging time s 4 - 5 s by motor opening time ~ 45 ms arcing time ~ 15 ms total breaking time ~ 60 ms closing time antipumping function by electromechanical release mechanical built-in function operating sequence O-0.3s-CO-3min-CO O-0.3s-CO-15s-CO (*) suitable for auto-reclosing cycle auxiliary accessories full range overcurrent release Y7 under development on new VD4 (**) ON / OFF tripping releases not suitable for continuous service suitable for continuous service plug-in ON / OFF/ UVR tripping releases and motor UVR = undervoltage release Confirm overall economic outlook. Discuss how they measure productivity at the business level? Value-added per Employee Other? (*) all new VD4 are Pehla certified O-0.3s-CO-3min-CO; VD and VD are already certified O-0.3s-CO-15s-CO (it is on going the activity for the certification of all new VD4 with the operation sequence O-0.3s-CO-15s-CO) (**) alternative solution with PR 521 and – MO3 already available
16
Maintenance Classic and New VD4 Maintenance Classic New Remark
typical life-expectancy 30,000 cycles 1) operating life of vacuum interrupters up to 30,000 operations depending on the vacuum interrupter type operating life of actuator up to 30,000 operations with maintenance up to 30,000 operations with maintenance 2) New VD4 is M2 class interval of inspection 4 years or after 5,000 operating cycles maintenance of actuator and transmission system after 10,000 or 20,000 operations replacement 3) of single actuator components 4) after 10,000 operations replacement 3) of the actuator unit 5) replacement of the actuator unit is easier and faster respect to the replacement of single components 1) cycles under normal operating conditions, depending on breaker type, given regularly and conscientiously performed maintenance replacement may be carried out only by ABB personnel or trained and qualified customer personnel M2 class means 10,000 operations without maintenance; the activity is on going for 30,000 operations without maintenance; 30,000 operations without maintenance will be available within 4Q 2003 replacement after 10,000 operations (depending on circuit breaker type) : blocking lever, half shaft, crank; replacement after 20,000 operations (depending on circuit breaker type) : latch, complete supporting crank, spring, shaft, cam disk, return rotation blocking replacement after 10,000 operations: actuator unit (snapping unit only; see next slide; snapping unit for 30,000 operations without maintenance will be available within 4Q 2003) replacement after 15,000 operations: shock absorber (the damper “shock absorber” for 30,000 operations will be available within 4Q 2003) Confirm overall economic outlook. Discuss how they measure productivity at the business level? Value-added per Employee Other?
17
Maintenance / Mechanical actuator
Classic and New VD4 Maintenance / Mechanical actuator New VD4 – actuator unit replacement: removal sequence 1) 1 Fixing screws 2 Fixing screws 3 Fixing screws 4 Fixing 5 Bearings 6 Kinematic linkage 7 Same operations in reverse order for mounting removal and mounting require approx. 20 min; the replacement is easier and faster respect to the replacement of single components in the classic c.breaker
18
Accessories / Standard
Classic and New VD4 Accessories / Standard Classic New Remark mech. ON/OFF push buttons Yes fixed & draw-out mech. position indicator „ charging position indicator operating cycle counter spring charging lever separate built-in shunt release OFF Yes (-Y2) 1) Yes(-MO1) on request aux. contact for fault annunciation Yes (-S7) Yes, on request switch for annunciation purpose Yes (-S4, 5-pole) Yes (2 x 5-pole) auxiliary terminal board / connection No / plug type anti-pumping function Yes (K0) Yes (mechanical, function built-in in the actuator) external control wiring and plug draw-out locking magnet on the truck 3) Yes (-Y0) on request Yes (-RL2) 2) Withdr. truck / racking lever / contact arms Yes / Yes / Yes Confirm overall economic outlook. Discuss how they measure productivity at the business level? Value-added per Employee Other? shunt releases are fundamentally wired with rectifiers (function as free-wheeling diodes if DC-supply) in order to obtain anti-pumping function; shunt releases are not mandatory with „new VD4“ in order to have anti-pumping function mandatory for UniGear type ZS1, UniSafe, PowerBox; inclusive mechanical interlock (striker pin) if rated current is different from the panel prevents the CB being racked into the panel with plug not inserted in the socket or no aux. Voltage; not available for motorized truck version
19
Accessories / On request
Classic and New VD4 Accessories / On request Classic New Remark locking magnet on the mechanism Yes (-Y1+S2) Yes (-RL1) fixed & draw-out shunt release ON Yes (-Y3) Yes (-MC) „ shunt release OFF standard Yes (-M01) second shunt release OFF Yes (-Y9) Yes (-M02) indirect overcurrent release Yes (-Y7) Yes (-MO3) under development already available PR521 and specific –MO3 undervoltage release / signal contact Yes (-Y4) / No Yes (-MU) / Yes undervoltage release mech. override Yes additional switch for annunciation purpose Yes (-S3, 5-pole) Yes (1 x 5-pole) 1) spring charging motor Yes (-M0) Yes (-MS) auxiliary switch for the charging motor Yes (-S1) Yes (-BS1) electronic time delay device (externally) signal contact spring charged / discharged (available for customer) Yes (-S1) (2-pole) Yes (-BS2) (1-pole) Confirm overall economic outlook. Discuss how they measure productivity at the business level? Value-added per Employee Other? 1) available free contacts depend on maximum of the requested applications
20
Accessories / Technical data
Classic and New VD4 Accessories / Technical data Classic New AC+DC / instantaneous / permanent Power (inrush) Power (continuous) / min.signal duration (inrush) / duration shunt release OFF AC: V DC: V / Yes / No 250 VA / W not allowed / 20 ms AC: V DC: V / Yes / Yes 200 VA / W / approx. 100 ms 5 VA / W / no limit shunt release ON VA / W 1) / Yes / Yes 2) under voltage release / No / Yes 11 VA 10 W about 10 VA / W indirect overcurrent AC VA --- VA 3) locking magnet 10 VA / W about 10 VA/W 500 VA / W / approx. 150 ms charging motor AC: V DC: V 800 VA / W 170 VA 150 W / 15 sec AC: V / approx. 200 ms / 5-6 sec Confirm overall economic outlook. Discuss how they measure productivity at the business level? Value-added per Employee Other? 1) depending on supply voltage 2) the permanently supplied release ON carries out the electrical anti-pumping function 3) development on going
21
Others / Specials Classic and New VD4 Classic New Remark made in ...
Germany ABB in E.U. new nameplate “Made by ABB in E.U.” delivery time (average) 4-6 4 target: 2 weeks (Q4 2003) naming (example) VD (no difference on name plate concerning fixed and withdrawable version) VD (fixed) VD4/P (withdr.) “ /P, /W, /C, … “ helps to identify the version relevant to ABB panel (e.g. /P for UniGear type ZS1 panel; /W UniSafe; /C for CBE-CBF) wiring diagram designations (e.g.) Y2 Y0 .… -M01 -RL2 .... New: according to new IEC STDs electrical diagrams ---- several figures are foreseen to cover classic VD4 electrical diagrams fully interchangeable housing fixing points (fixed construction) new fixing points plus the previous of classic VD4 motor rack-in / rack-out Yes up to 17.5 kV as well as classic VD4 Confirm overall economic outlook. Discuss how they measure productivity at the business level? Value-added per Employee Other?
22
Marketing tools Classic and New VD4 • / • / - / - • / • / • / •
Information Material Classic VD4 New VD4 remark poster • / • / - / - • / • / • / • slides brochure catalogue - / - / - / - instruction Manual English / German / Italian / other language ( • under construction, • available, • available in “Inside ABB” ) Confirm overall economic outlook. Discuss how they measure productivity at the business level? Value-added per Employee Other? Industrial IT Classic VD4 New VD4 remark certification •