TEAM 6 Case for Cambodia Eric Immerfall Elizabeth Smit Jordan Johnston Lisa Andela Aaron Goodman.

Similar presentations


Presentation on theme: "TEAM 6 Case for Cambodia Eric Immerfall Elizabeth Smit Jordan Johnston Lisa Andela Aaron Goodman."— Presentation transcript:

1 TEAM 6 Case for Cambodia Eric Immerfall Elizabeth Smit Jordan Johnston Lisa Andela Aaron Goodman

2 Presentation Outline Master Plan Layout Design Norms Designs Budget Challenges Lessons Learned Questions

3 Master Plan Layout Well Solar Pump Fish Ponds Drip Irrigation Common Building Sanitary Facilities Bridge Design Norms - Layout - Designs - Budget - Implementation - Challenges - Questions

4 Design Norms Cultural Appropriateness: Through the design, materials, and construction methods of the common Cambodian. Transparency: Communication about the simplicity and reliability of the design. Integrity: Design will facilitate relationships between people and their land. Design Norms - Layout - Designs - Budget - Implementation - Challenges - Questions

5 Building Layout 2 nd Floor-  11 dorm rooms Tile roof Steel Roof Framing Concrete Wood/Stucco 1 st Floor- Classroom, Kitchen, 3 full bathrooms open space Design Norms - Layout - Designs - Budget - Implementation - Challenges - Questions

6 Roof Design Clay Tiles  Local tiles used  Size no smaller than 0.369m long Steel Framing  Steel angles 3”x3” spaced at 0.369m O.C. Support Beams  W8x10  Spaced at 3m O.C Support Truss  WT4x5 used as outer shape  L30305 is used as bracing Design Norms - Layout - Designs - Budget - Implementation - Challenges - Questions

7 Structure Design 2 nd Floor Columns  W8x24 in center at end of building  W10x12 at each corner of building Concrete Design  Second floor slab, beams, columns, floor, foundations  Designed as modular system  3 different modules  3x3m, 3x4m, 3x6m  Reinforcement steel designed Design Norms - Layout - Designs - Budget - Implementation - Challenges - Questions

8 First Floor First Floor Includes:  Kitchen  Enclosed in concrete block (along with classroom and restrooms  Classroom  Large space for classes, meetings, worship, etc.  Potential for computer lab  Restroom facilities  Each include toilet, sink, and shower  Storage room  Battery bank storage  Stairway  Wrap design  Foundations  Wall foundations and column footings  Short perimeter wall  Keeps rain out Design Norms - Layout - Designs - Budget - Implementation - Challenges - Questions

9 Renewable Energy Source Sizing of the components based on 6kWh demand System Autonomy 3 days Average solar irradiation 4.96 kWh/m²/d o Require 12 Sharp 175 w Panels Battery Bank 12 x 2 volt batteries in series o Require Total Capacity of 1500 Ah Inverter sized with all appliances running o Continuous output power should be approximately 1600 W at 25°C http://cambodia.picosol.nl Design Norms - Layout - Designs - Budget - Implementation - Challenges - Questions

10 Renewable Energy Source – System Configuration Design Norms - Layout - Designs - Budget - Implementation - Challenges - Questions

11 Water Distribution & Irrigation  Water Needs from Well:  Existing common building: 564L/day  New common building: 1692L/day  Soursop Tree: ~8L/day Design Norms - Layout - Designs - Budget - Implementation - Challenges - Questions http://www.ideorg.org  System Components  Irrigation for vegetable garden (IDEal Drip Kits)  Solar pumps to meet demands PS600 BADU PS 600 HR/C www.lorentz.de

12 Sanitary Facility – Bathroom Layout Design Norms - Layout - Designs - Budget - Implementation - Challenges - Questions System Plan Three Bathrooms  Sink, Toilet, and Shower in Each Water Demand: 1692 Liters per Day Septic System for Waste Removal  2 Septic Tanks in Series  1 st Tank: 5678 Liters with Baffle  2 nd Tank: 5678 Liters  Drain Field  Approximately 950 sq ft in size

13 Sanitary Facility Septic System Design Specs 2 Septic Tanks in Series  Extra Storage  Sludge Movement Prevention  Schedule 40 Piping  Minimum Slope is 0.635 cm per 30.48 cm 88 sq meter drainage field  Level  Perforated 10 cm Piping  Baffle System Design Norms - Layout - Designs - Budget - Implementation - Challenges - Questions

14 Sanitary Facility- Septic System Design Norms - Layout - Designs - Budget - Implementation - Challenges - Questions

15 Sanitary Facility – Septic System Design Norms - Layout - Designs - Budget - Implementation - Challenges - Questions

16 Bridge Design - Culverts The first model made was the stream as it is now The second model was made with the dam being assumed as part of the ground and with the sides of the stream being excavated to provide room for the structure From there culverts were inserted to find out how many were needed to convey the worst case flow. Design Norms - Layout - Designs - Budget - Implementation - Challenges - Questions

17 Bridge Design – Final Design Design Norms - Layout - Designs - Budget - Implementation - Challenges - Questions

18 Budget Budget for the Master Plan Water Distribution System$2,072.00 Sanitary Facility$3,910.00 Common Building$21,512.00 Bridge$2,073.00 Renewable Energy Source$21,275.00 Grand Total$50,842.00 Projected costs were based on  Cost of materials  Cambodian price if known, otherwise price in the US  Does not include cost of labor Design Norms - Layout - Designs - Budget - Implementation - Challenges - Questions

19 Challenges in Design  Assumptions about site data  Finding local vendors and prices for system components  Different design codes and styles between countries  Culturally appropriate design choices Design Norms - Layout - Designs - Budget - Implementation - Challenges - Questions

20 Lessons Learned Keep units straight -metric Document everything Things change- be able to adapt We don’t know everything-make assumptions Getting started is half the battle- where to start Learned a lot about different aspects of site development Communication is key between group members Design Norms - Layout - Designs - Budget - Implementation - Challenges - Questions

21 THANK YOU Special Thanks To:  Prof DeRooy-Team Advisor  Prof Dornbos-Biology Prof  Rachel Koopman-Interim Data Coordinator  Interim Group  Roger Lamer-Industrial Consultant  Navy Chann-Chhay & Li Chhay-Client  Founders of Eden School of Agriculture  CEAC Design Norms - Layout - Designs - Budget - Implementation - Challenges - Questions


Download ppt "TEAM 6 Case for Cambodia Eric Immerfall Elizabeth Smit Jordan Johnston Lisa Andela Aaron Goodman."