Download presentation
Presentation is loading. Please wait.
Published byMartin Osborne Modified over 9 years ago
1
TECHNICAL ASSIGNMENT #1 – NATHAN BRASKEY SUNNYVALE PLAZA [Cooper Carry, Inc.]
2
PROJECT SCHEDULE SUMMARY
3
BUILDING SYSTEMS SUMMARY Precast Concrete Above grade columns Mechanical System Variable Air Volume Cooling Towers Fan Coil Units Fire Suppression Pressurized Stairways Sprinklers Fire Dampers Two hour rating Demolition Required Plumber’s Building Slurry Wall East street and utilities Structural Steel Frame Encased steel columns below grade Steel composite deck Cast-In-Place Concrete Slurry Wall Underground Slabs Column Encasement [Cooper Carry, Inc.]
4
BUILDING SYSTEMS SUMMARY (CONT.) Electrical System PEPCO 460/265 Volt Switchboards 208/120 Volt Panelboards 3 Primary Electrical Rooms per floor Masonry New Structure Load Bearing Single-wythe veneer LEED – Recycled content Renovation Load Bearing Masonry Restoration and Cleaning Curtain Wall 2,400 Wall Units 29,000 Punched Window Units Steel Sunshades Roof System Glass Skylight Roof Terrace Excavation Top-Down Excavation Slab-On-Grade Pours [Cooper Carry, Inc.]
5
PROJECT COST EVALUATION Square Foot Analysis $172,000,000 – $229 / SF Elevator Laundry Equipment Emergency Lighting / Smoke Detectors Reasons Top-Down Construction Slurry Wall / Concourse Excavation Extensive below-grade excavation Substantially more suites Actual Costs Prime: $500,000,000 – $665 / SF Building Systems Cost Superstructure: $66 million Exterior Enclosure: $48.5 million Plumbing: $95.5 million HVAC: $51.5 million Fire Protection: $24.5 million Electrical: $46.5 million
6
EXISTING CONDITIONS SITE PLANS Proposed Building Existing Building Construction Fence Traffic Flow Fire Hydrant Electrical Water Stormwater Sanitary Gas Telecom Nathan Braskey Existing Conditions Site Utility Plan C - 300 Height – 150 ft Height – 60 ft H: 110 ft
7
CLIENT INFORMATION Owner: Hotel Developer Hotel Manager: Hotel Franchise New Facility – Expansion of Franchise Design – Build / Guaranteed Maximum Price Budget, Quality, Schedule Importance of opening on-time
8
PROJECT TEAM
9
QUESTIONS? Schedule Schedule Systems Summary Systems Summary Cost Evaluation Cost Evaluation Existing Conditions Fly Around Existing Conditions Fly Around Existing Conditions Site Plan Existing Conditions Site Plan Client Information Client Information Project Team Project Team
10
EXISTING CONDITIONS SITE PLANS Proposed Building Existing Building Construction Fence Traffic Flow Fire Hydrant Electrical Water Stormwater Sanitary Gas Telecom Height – 150 ft Height – 60 ft H: 110 ft Nathan Braskey Existing Conditions Site Utility Plan C - 300
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.