Presentation is loading. Please wait.

Presentation is loading. Please wait.

Status of the Status of the MONARC Testbed in Padova Massimo Sgaravatto INFN Padova May Monarc Workshop.

Similar presentations


Presentation on theme: "Status of the Status of the MONARC Testbed in Padova Massimo Sgaravatto INFN Padova May Monarc Workshop."— Presentation transcript:

1 Status of the Status of the MONARC Testbed in Padova Massimo Sgaravatto INFN Padova May Monarc Workshop

2 Massimo Sgaravatto - May MONARC Workshop Hardware Configuration SUN I SPARC-20 (125 MHz) 128 MB RAM Disks: –1 GB SCSI disk –18 GB Ultra Wide SCSI disk SUN II Ultra 10 (333 MHz) 128 MB RAM Disks: –9 GB EIDE disk –6 X 18 GB Ultra2 Wide SCSI disks

3 Massimo Sgaravatto - May MONARC Workshop Solaris 2.6 AFS Sun C++ (4.2) LHC++ Objectivity –4.0.2 –5.0 –5.1 Java –JDK 1.1.7 –Java 2 –Java3D –Swing DRO_TOOL Software

4 Massimo Sgaravatto - May MONARC Workshop Preliminary tests AtlFast++ –No problems with the installation –Ready for tests with other sites GIOD –Installation of the event viewer and a small FDB –Problems (bug in Objectivity)


Download ppt "Status of the Status of the MONARC Testbed in Padova Massimo Sgaravatto INFN Padova May Monarc Workshop."

Similar presentations


Ads by Google