1 Six-month Review – Project Name, Number, Report Period CMI Project Review: Natural Ventilation, Solar Heating and Integrated low-energy Building Design Aug 1,2004- Jan 31, 2004 Cambridge PI, Andrew Woods, BP Institute MIT PI, Leon Glicksman, Architecture and Mechanical Engineering

2 Six-month Review – Project Name, Number, Report Period Natural Ventilation, Solar Heating and Integrated low-energy Building Design Brief Description of Project: In this project we propose to draw together experts involved in architectural design, building engineering, natural ventilation processes, as well as in building environmental safety, from Cambridge, MIT and BP. Through a combination of complementary fundamental research, building monitoring and a joint design project for a specific new building, we aim to build up the foundations of this key emerging discipline in building design.

3 Six-month Review – Project Name, Number, Report Period Summary of Intended Outcomes: The objectives of the project will be to develop designs and technologies to: reduce energy costs of maintaining a comfortable environment with buildings through use of solar power, natural ventilation processes and improved building materials; improve air quality within buildings, to mitigate against sick building syndrome; improve emergency building ventilation in case of discharge of hazardous gases or fires. We also plan to invest considerable effort in communicating these technologies to the architectural and building engineering communities

4 Six-month Review – Project Name, Number, Report Period Progress In Past Six Months Important activities, collaborations: There has been continuous collaboration between MIT(Architecture, EECS, Mechanical Engineering) and CU (Martin Centre, BPI) working on joint projects in UK and US. This includes exchange of students, staff for short periods, multiple joint meetings in UK, US: at least 6 per year. There has been joint participation in giving short courses, conference workshops for industry professionals and academics from other universities. CU and MIT have maintained close cooperation with industry on monitoring of advanced buildings, design, analysis and planning of innovative facilities. This includes ongoing meeting with BP Global Property Management and Services in UK and US on major new BP sites.

5 Six-month Review – Project Name, Number, Report Period Progress (Cont) Development of analytical and numerical solutions for natural ventilation flows and energy interaction in buildings has continued. Work has continued on a web based design tool for architects, engineers and planners

6 Six-month Review – Project Name, Number, Report Period Professional Courses offered by CMI on Natural Ventilation, Sustainable Buildings Cambridge U 2001 for architects, engineers, developers UC San Diego 2001 for architects, engineers, developers MIT 2002 for architects, engineers, developers Cambridge U 2003 for graduate students MIT 2003 for architects, engineers, developers Edinburgh 2003 CIBSE/ASHRAE for architects, engineers, developers Naperville, Illinois 2004 for architects and developers

7 Six-month Review – Project Name, Number, Report Period CMI work with BP on Sustainable Buildings Aberdeen UK headquarters design Sunbury UK monitoring Bath UK general meeting Naperville Illinois monitoring and survey Naperville Illinois advanced laboratory design Naperville Illinois Flexible Building Option Analysis

8 Six-month Review – Project Name, Number, Report Period Milestones achieved: Several professional courses have been presented on natural ventilation and sustainable building design for architects, engineers and planners in the UK and US. A day long workshop session has been presented at the CIBSE/ASHRAE international conference in Edinburgh. A Beta version of the web based design tool is available This includes energy savings and comfort indices for naturally ventilated buildings.

9 Six-month Review – Project Name, Number, Report Period Milestones achieved Design Adviser presented to architecture educators and students in Milan, MIT Tool used in MIT undergraduate and graduate subjects Tool to be presented to New York architects in May 2004

10 Six-month Review – Project Name, Number, Report Period

11

12

13 Mechanical Pure natural Hybrid ventilation

14 Six-month Review – Project Name, Number, Report Period Mechanical Pure natural Hybrid ventilation

15 Six-month Review – Project Name, Number, Report Period Natural Ventilated Building, Aldwyck Housing- Luton England

16 Six-month Review – Project Name, Number, Report Period Luton Building Interior

17 Six-month Review – Project Name, Number, Report Period Air temperature distribution of CFD simulation result

18 Six-month Review – Project Name, Number, Report Period Airflow pattern compared between simulation and visualization Visualized air flow direction

19 Six-month Review – Project Name, Number, Report Period Buoyancy influence on turbulence, cont. The flow patterns of CFD simulation at 3mm grid size and different C3 values (a, b) and experimental flow (c)

20 Six-month Review – Project Name, Number, Report Period Luton Air Model-MIT 10 th Scale Model of Luton Building Airflow Measurements compare to building Airflow Visualization techniques

21 Six-month Review – Project Name, Number, Report Period Deliverables completed:

22 Six-month Review – Project Name, Number, Report Period Plans For Next Six Months Expected activities, collaborations : –Continuation of full scale monitoring –Continuation of analytical and numerical research on natural ventilation –Planning short courses in US June 2004 –Continue web based design advisor

23 Six-month Review – Project Name, Number, Report Period Expected milestones : –Q1 (1 Aug 2003 - 31 Oct 2003) Milestones: –Presentation of a one day session at the CIBSE/ASHRAE International Conference in Edinburgh. –Preliminary full scale monitoring of naturally ventilated commercial building in Luton UK. –Q2 (1 Nov 2003 - 31 Jan 2004) Milestones: –Construction and preliminary testing of scale model of Luton building. –Preparation of 2 or 3 papers for 2004 Room Vent conference based on monitoring and CFD results for the Luton building –Meeting with BP on advanced laboratory and office facilities plans.

24 Six-month Review – Project Name, Number, Report Period Milestones (Cont) –Q3 (1 Feb 2004 - 30 Apr 2004) Milestones: –Validation of analytical and CFD models based on the full scale results at Luton. –Q4 (1 May 2004 - 31 July 2004) Milestones: –Presentation of a short course on natural ventilation at Naperville BP facility. –Q5 ( 1 Aug 2004- Oct 31 2004) Presentation of 6 papers at Room Vent Conference Portugal

25 Six-month Review – Project Name, Number, Report Period Other Items Developments worth publicizing: –Workshop, courses, web based design tool Modifications to statement of work and/or funding: Expected financial profile: –Approximately on budget Anything else:

26 Six-month Review – Project Name, Number, Report Period Challenges And/or Issues To Address Problem/Concern: Plan for resolution: How CMI can help:

27 Six-month Review – Project Name, Number, Report Period Natural Ventilation Air Flow in Buildings Influenced By: Wind Velocity and Direction Building Exterior Geometry Building Interior Geometry Temperature Difference – Inside/Outside Buoyancy

28 Six-month Review – Project Name, Number, Report Period Level of Understanding 1.Overall Air Flow through Space: Treat Building as a Whole Simple Model for Individual Rooms, Zones Use Simple Computation Tools and Experimental Models Yields: Overall Energy Balance Approximate Flow Rate

29 Six-month Review – Project Name, Number, Report Period Example: Sunbury Design with Natural Ventilation

30 Six-month Review – Project Name, Number, Report Period Summer Natural Ventilation

31 Six-month Review – Project Name, Number, Report Period Detailed Flow Understanding Within Room Apply Laws of Physics Conservation of Mass Momentum Balance Conservation of Energy Solve for Temperature, Velocity, Pollutant Distribution

32 Six-month Review – Project Name, Number, Report Period Experimental Validation is Crucial Full scale or properly scaled models Operate over range of conditions expected Measure overall flow behavior Measure detailed distribution: –Temperature –Velocity –Concentration of pollutants


Download ppt "Six-month Review – Project Name, Number, Report Period CMI Project Review: Natural Ventilation, Solar Heating and Integrated low-energy Building Design."

Similar presentations


Ads by Google