1 COMPARISON OF 3PHASE AND SINGLE PHASE POWER PLANTS REMOTE SENSING IN BTS STATION

2 POWER PLANT 3 ph. Vs 1 ph. DATA COLLECTION EB TARIFF: Rs. 5.50/UNITEB TARIFF: Rs. 5.50/UNIT DIESEL : Rs.35/ LTR.DIESEL : Rs.35/ LTR. POWER DISRUPTION: 12 HOURS PER DAYPOWER DISRUPTION: 12 HOURS PER DAY

3 EQUIPMENTS R PHASE: 1.5 TR S/T AC UNITS- 1NoR PHASE: 1.5 TR S/T AC UNITS- 1No Y PHASE : POWER PLANT- 35 A DCY PHASE : POWER PLANT- 35 A DC B PHASE: LIGHT AND FANSB PHASE: LIGHT AND FANS POWER PLANT: 150 A, SINGLE PHASE POWER PLANT: 150 A, SINGLE PHASE

4 EA SET 1No. 15 KVA 3PHASE1No. 15 KVA 3PHASE GIVEN WORKING LOAD OF 1NO AC UNIT AND 35 A DC CURRENTGIVEN WORKING LOAD OF 1NO AC UNIT AND 35 A DC CURRENT AVERAGE DIESEL CONSUMPTION -1.65 LTR/HR.AVERAGE DIESEL CONSUMPTION -1.65 LTR/HR.

5 SINGLE PHASE POWER PLANT AC VOLTAGE: 230, CURRENT: 10 AAC VOLTAGE: 230, CURRENT: 10 A DC VOLTAGE: 55DC VOLTAGE: 55 DC CURRENT: 35DC CURRENT: 35 EFFICIENCY: 55 X35 / 230 X 10EFFICIENCY: 55 X35 / 230 X 10 = 83% = 83%

6 THREE PHASE POWER PLANT (200 AMPS) AC VOLTAGE: 400AC VOLTAGE: 400 AC INPUT CURRENT:5.5 AMPSAC INPUT CURRENT:5.5 AMPS DC VOLTAGE: 55DC VOLTAGE: 55 DC CURRENT: 35DC CURRENT: 35 EFFICIENCY: 55 X35 / 400 X 5.5EFFICIENCY: 55 X35 / 400 X 5.5 = 87.5% = 87.5%

7 ENERGY COST PER YEAR (EB) 3.35 X 12 HOURS X 30 DAYS= 1206 kwh 1206 x 5.5 = Rs.6633/- per month Rs.79596/- per year

8 EXPENDITURE ON EA SET COST OF FUEL : Rs.35/ LTR RUNNING HOURS : 12 HOUR/DAY CONSUMPTION: 1.6 LTR /HOUR EXPENDITURE PER MONTH: 1.6 X12 X 35 X 30 = Rs.20160 EXPENDITURE = 2,41,920/- PER YEAR

9 COST OF PHASE SELECTOR SWITCH AND INSTALLATION CHARGE = Rs. 12,000/- EXPENDITURE ON EA SET

10 12 HOURS WORKING PER DAY FUEL CHARGES =Rs.2,41,920/- EB CHARGES = RS. 79596/- SAVING PER YEAR = Rs.241920 –( 79596+12000/-) =Rs.1,60,324/- FUEL SAVING : RS.1,60,324/- PER YEAR. EXPENDITURE ON EA SET

11 RECOMMENDATIONS SINGLE PHASE POWER PLANT WITH PHASE CHANGER IS ECONOMICAL WHERE DISRUPTION OF ONE PHASE BY EB IN PRACTICESINGLE PHASE POWER PLANT WITH PHASE CHANGER IS ECONOMICAL WHERE DISRUPTION OF ONE PHASE BY EB IN PRACTICE EB METER CAPACITY SHALL BE 20AMPS PER PHASEEB METER CAPACITY SHALL BE 20AMPS PER PHASE COST OF PHASE SELECTOR SWITCH CAN BE RETRIEVED WITHIN ONE MONTHCOST OF PHASE SELECTOR SWITCH CAN BE RETRIEVED WITHIN ONE MONTH

12 RECOMMENDATIONS THREE PHASE POWER PLANT IS ECONOMICAL IN URBAN AREAS WHERE CONTINUOUS 3PHASE POWER SUPPLY IS AVAILABLE.

13 REMOTE SENSING IN BTS STATION - LOCATION DB ROAD COIMBATORE OTHER BTS STATION

14 REMOTE SENSING IN BTS STATION DB ROAD: PRESEVI MAKE SENSOR FOLLOWING TRIP INDICATIONS EXTENDED TO TRICHY FROM COIMBATORE AC FAILURE LLOP LOW FUEL POWER PLANT TRIP FIRE ALARM DOOR OPEN COST : 11000/-

15 OTHER BTS STATION FOLLOWING TRIP INDICATIONS EXTENDED MAKE: PRESEVI FIRE ALARM ENGINE FAIL EB SUPPLY FAIL COST: 5000/-