History PSI-WS7 has its origins 20 years ago in the Western Canadian Sedimentary Basin. This development was a new approach to dealing with the heavy paraffin waxes and asphaltenes present in those limestone, shale and sandstone formations. The product has now been refined and has built on those early successes with current activity in the Middle East, backed up with independent third party verification.
3
Services with PSI-WS7 Equipment cleaning Crude tank cleaning
4
Services with PSI-WS7 Demulsifying Pit Cleaning
5
Services with PSI-WS7 Well stimulation Hot oil services
6
Services with PSI-WS7 Chemical injection
7
Common problems Paraffin and asphaltene wax formation
Pipeline plugging or restrictions Corrosion of pipeline, tanks and equipment Wax build up in pipeline or plant facilities Scaling and emulsions Difficulties in removing H2S Excessive pressure, reduced volumes Low productivity High maintenance costs
8
What is PSI-WS7? PSI-WS7 is a charge soap or an anionic surfactant
It has an affinity for any positively charged carbon or stainless steel surface, where it is drawn to the steel it forms a protective barrier film Typically, results can vary depending on project but can be as short as 24 hours
9
Features of PSI-WS7 Single product – multi purpose surfactant
Corrosion control and prevention Paraffin/asphaltene control and prevention (incl. crystalline wax) Drag reducer Cleans pipe lines, pumps, valves and equipment Cleans tanks and facilities Chemical injection services Well stimulation and work over Emulsion control and breaking Reduces maintenance down time
10
Benefits of using PSI-WS7
Single product corrosion and wax inhibitor Solution drops out into the water and is water soluble Environmentally friendly and safe to administer Effective for onshore/offshore operations Cost effective and in most cases can reduce overall costs of chemical program
11
Application considerations for PSI-WS7
Pipeline dimensions Product being transported Flow rates Gas and oil analysis Facility size Availability of injection points, pumps Services available: power, water, workforce camp Brief history of identified problems Specifications of equipment related to problem
12
Application benefits of PSI-WS7
No limiting or restricting flow during injection process PSI-WS7 works quickly giving improved performance of valves, instrumentation and plant efficiency Results often seen in just 24 hours: sales tanks cleaned flare tanks cleaned process vessels and lines cleaned clean and clear separation of water
13
12” in-field pipe line (Bukha) pig returns
Field performance of PSI-WS7 12” in-field pipe line (Bukha) pig returns after 9 months with market leader’s inhibitor 6 months later with PSI-WS7
14
Field performance of PSI-WS7
16” export pipe line (Bukha) pig returns after 9 months with market leader’s inhibitor 6 months later with PSI-WS7
15
Field performance of PSI-WS7
Pigging with confidence! One year earlier, this pipeline was 100% plugged with wax and suffering from corrosion. They now have a 0% BSW and visible results.
16
Thermal image of a 300,000 BBL tank BEFORE cleaning
Field performance of PSI-WS7 Thermal image of a 300,000 BBL tank BEFORE cleaning
17
Thermal image of a 300,000 BBL tank AFTER cleaning
Field performance of PSI-WS7 There was zero entry into the tank and all but the in-organics were recovered, shipped and sold with zero downtime, while dropping the emulsions to zero and shipping 30,000 recovered barrels of oil! Thermal image of a 300,000 BBL tank AFTER cleaning
18
Field performance of PSI-WS7
Increased production Farha South field (Oman) Pre treatment Post treatment with PSI-WS7 BPD increase % improvement Well FS-31 296 461 165 156% Well FS-42 33 227.7 194.7 690% Well FS-56 77 336.1 259.1 436% Total 406 1025 619 252% An increase of 619 BPD, which at $100 per barrel = more than $22,000,000 pa increased revenue Payback was 48 hours in this application
19
Performance verification of PSI-WS7
Laboratory tests by Intertek CAPCIS - Wax Inhibition Coaxial Shear Test Method PSI 220ppm 85% Inhibition Leading 500ppm 44% Inhibition Cold Finger Test PSI 220ppm 80% Inhibition
20
Performance verification of PSI-WS7
Laboratory tests by Intertek CAPCIS - Corrosion Inhibition Rotary Cage Autoclave Welded and Parent metal coupon average weight loss calculated to corrosion rate over one year Target reasonable rate (ref:NORSOK M-001) <0.10 mm/yr Leading market 220ppm >10.00 mm/yr 220ppm 0.07 mm/yr
21
Performance verification of PSI-WS7
22
Performance verification of PSI-WS7
23
Performance verification of PSI-WS7
24
Performance verification of PSI-WS7
25
Performance verification of PSI-WS7
Figure 1 – Results of emulsion separation at 38 °C with no PSI‐WS7. Separation time is the time after turning off the mixing, i.e. 5 minutes means it has been five minutes since mixing was stopped.
26
Performance verification of PSI-WS7
Figure 1 – Results of emulsion separation at 38 °C with 300 ppm PSI‐WS7. Separation time is the time after turning off the mixing, i.e. 5 minutes means it has been five minutes since mixing was stopped.
31
Brenitech Oil Services
Thank you For information please contact Brenitech Oil Services Sales and Service Phone : (+968) /