Download presentation
Presentation is loading. Please wait.
Published byGavin White Modified over 9 years ago
1
P14311: PCB Isolation Routing System Problem Definition Review
2
Agenda Introduction- 1 min Background- 3 min Problem Statement- 6 min Stakeholders and Use- 4 min Customer Requirements- 5 min Engineering Requirements- 5 min Draft Project Plan- 4 min Issues and Corrective Actions- 2 min Questions?
3
Team Introductions NameMajorRole Matthew ClarkMELead Mechanical Engineer Marley Collier Sears MEME Interface Manager Sarah DumanIEProject Manager Richard KalbEELead Electrical Engineer Joseph PostEEEmbedded Controls Zoe RabinowitzMEDocumentation Manager Kevin RichardEEEE Interface Manager Vince BurollaEETeam Guide Our Senior Design Team
4
What is a Printed Circuit Board (PCB)? PCB’s are boards used to mechanically support and electrically connect components. Non-conductive substrate with copper used to electrically connect components Copper removed/added Components consist of through hole and/or surface mounts (resistors, capacitors, integrated circuits)
5
Difference between PCB and PCBA A Printed Circuit Board Assembly (PCBA) includes the board complete with all mounted components The scope of this project only focuses on the manufacturing of PCBs
6
Background Printed circuit boards (PCBs) have been the cornerstone of electronic technologies for many years Multiple iterations are typically required to finalize the PCB design Our scope includes manufacturing single and double- sided PCB prototypes
7
Problem Statement RIT students need rapid prototyping for creation of unique circuit boards Requires multiple revisions to perfect each circuit board Currently each iteration must be created off campus Long lead times Expensive Limits circuit refinement Students not involved in process
8
Problem Statement (Continued) Isolation Routing System Rapid prototyping Inexpensive In-house fabrication Students control production process Proposed System Create boards to accommodate through hole components Ex. Improved Radiation Meter (Elektor PN 110538-71) Debris management system
9
Current State Chemical Etching Subtractive processes Traces created from etch resist ink or are electroplated onto a substrate Standard Leadtime ~ 15 business days (3 weeks)
10
Competitive Benchmarking Circuit board plotting machines currently offered by Datron, LPKF, etc. Auto tool change Solder paste dispenser Mill or laser cut Fit on desktop Roughly $12k
11
S Jeff Lonneville: CEMA Lab Technician Average RIT Students (with interest in PCBs) Imagine RIT Patrons Current and Future MSD Students Judy Foster: RIT Environmental Health and Safety Rob Scott: PCB Hobbyist / Small Business Owner Ryan Bowen: Robotics Lab Manager Third Party Companies GM Johnson and Johnson Windsor ECT
12
Project Deliverables Functional PCB Isolation Routing System Prototype Circuit Schematic(s) Software CAD Assembly Drawing Packages Bill of Materials Part Numbers, Pricing, Manufacturer, Quantity, Description Safety Training and Procedures Manual Operation and Maintenance Manual
13
Students can make multiple iterations of prototype boards Facilitate fabrication of PCBs for other MSD projects Use Scenarios
14
Use Scenarios (continued) Third Party Company Manufacturing Foundation for Continuation
15
Customer Requirements
16
Customer Requirements(cont)
17
Engineering Requirements
18
Engineering Requirements(cont)
19
House of Quality
20
Project Plan
21
Project Plan (continued)
23
Issues and Corrective Actions Issues: External PC not available Undefined Safety Standards Unknown standards for debris measurement and management Actions: Contact Depts. for a extra/unused computer Meeting schedule with Judy Foster, RIT EHS Contact Particle Measuring Systems for contamination measurement instructions
24
Any Questions? Happy Week 3 RIT!
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.