Download presentation
Presentation is loading. Please wait.
Published byGodwin McCarthy Modified over 9 years ago
2
Company Description Project Management Process Design Inventory Management Supply-Chain Management Forecasting Product Design Conclusion QUESTIONS?
3
Founded in 1996 by Minh Ngo Retail & Online Sales of Consumer Electronics 7 Locations Own brand of accessories – Velocity 100 million in Annual Revenue 219 Employees Strategy revolves around “Best Customer Service Possible” & “Price Match” “If a customer doesn’t return after purchasing from us, we don’t deserve their business” – Minh Ngo
4
Opened in October 2010 As of July – Total Revenue is approx $7 mil 29 Employees 3 Store Managers 26 employees – Sales Rep, Technicians, CSR & RMAs
5
Computer Gaming Tournament › 60 Participants w/ capacity of 100 › 4 major sponsors Informally Planned › Project Manager- Mr. Damian Cheytanov, Richmond Store Manger › No PM tools used
6
Project Scope › Acquire a minimum of 3 sponsors › Assign 3-4 additional employees › Find an adequate location › Ensure sponsorship equipment arrives on time › Setup equipment & ensure computers and software is running perfectly
7
Utilize project management software › MatchWare MindView 4.0 Provides a WBS Brainstorm and visualize ideas Accelerates project planning › Microsoft Project 2011 Creates Gantt Charts Comprehensive definition of critical tasks and subtasks Generate a timeline
8
Current Processes Issues Recommendation
10
Lost sale due to e-commerce Urgent purchase (Gift) Transit times of parts Delays in transport Delays in manufacturing
11
Increase minimum carrying quantity for common components › Minimum carrying quantity for items less sensitive to obsolesces › Implement safety stock
12
Current Inventory Models › Count two product groups per day › Min / Max Replenish System Obsolescence › Laptops, motherboards and video cards Shrinkage › 1.5% shrinkage, approximately $80,000 › Laptop memory, Flash Memory and Hard Drives
14
Issues › Counting model does not take accurate screenshot of all inventory › High holding costs compared to JIT Recommendation › Centralized warehouse needed for expansion in BC › Continue with Min/Max inventory system
16
Reverse Logistics ME
17
Make or Buy Decision Issues Recommendation - Transportation - Storage - Labour - E-commerce Sales
18
Current Technique › Only Qualitative method “Jury of Executive Opinion” Issues › Need additional methods Recommendation › Quantitative forecasting (Exponential Smoothing Model etc.) › Sales Force Composite
20
In-house brand “ Velocity” LCD TV Mounts, External HDD, PC Tower Development is initiated when an opportunity is discovered Product Design & Production is Outsourced to China Design sample is reviewed by Executives & Experts within the Company
21
Use House of Quality Do Primary Research on Technological Capabilities. › After a survey, we discovered some characteristics of HDD that consumers sought after. i.e USB 3.0 & Low Operating Noise › Velocity branded External HDDs are lagging behind competition in these 2 areas.
23
Reevaluate three of the company’s weaker operational aspects. › Project Management › Forecasting › Product Design Improvement means › Greater Cost Savings › Efficiency › High Quality Products
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.