Download presentation
Presentation is loading. Please wait.
Published byHorace Hardy Modified over 9 years ago
1
Multi-Purpose Personal Protective System (MP3S) OSCT Industry Engagement Session 3 (Webinar) – 3 December 2013 Presented by: Malcolm Peattie and Pat Robinson
2
UK CBRN Responders
3
Presentation Overview Requirement Capture – re-cap Headline requirements Procurement – potential strategies Feedback on requirement (by ‘attendees’)
4
Caveat Continuing to engage No procurement process now Model Response review No guaranteed procurement for the future
5
Overall lead – Head of Systems and Requirements, CAST Fire requirement Police requirement Health / Amb requirement Military requirement Multi-agency consolidated requirement Multi-Agency Requirements Capture Working Group MP3S Requirements Capture Process
6
MP3S Partnership Overview Consolidated requirement reflects all responders from all agencies All agencies represented on Programme Board and sub-groups Future procurement activity for emergency responders managed by GPS Future procurement funding by individual agencies Military procurement managed by DE&S
7
MP3S Overview Multi-Purpose Multi-Agency AmbulanceFire MoD Police Multi-Threat CBRNTIC / HazMat Illicit Drugs LabChemical Fatality Multi-Use Urban Search and RescueTactical Firearms Medical TreatmentBuildings
8
MP3S Overview System (1) All PPE / IPE Activities Responders Challenges Environments
9
MP3S Overview System (2) A system to provide all protection needed One set of respiratory protection and one set of clothing. Unlikely A variety of respiratory protection, suits and hand and foot protection - components Current PPE / IPE: some have a full protection option and some have a low- burden option. We are looking for those and others in between
10
Definition of Terms Components - individual parts to be used in combination or permutation. Ensemble - provides full body protection by combining components. System – all the components needed to make up ensembles to meet the entire requirement. 10
11
MP3S Potential Procurement Strategies Reminder – MP3S is not in a procurement and this strategy is in early development Prime Vendor Contractual Model with Specified Component Sub-contractors Any interim purchase to be consistent with desired ultimate solution Currently increasing understanding of current capability Vs MP3S Requirement
12
Must Haves Protection – body and respiratory Communications – with protected and unprotected people Packaging – component identification and traceability 12 Key Requirements
13
Highly Desirables Wearable over normal workwear Minimal user adjustments Visual check correctly worn Standby state Drinking Vision correction Minimum training burden 13 Other Requirements
14
Do you understand the requirements? Do you need more information? Do you have products that meet the requirements? Are you developing products that meet the requirements? Do you see yourself as a prime or sub contractor? 14 Requirements Feedback from Participants
15
Conclusion Continuing engagement intended to be: Frequent Open As full as possible Open to late-entrants Individual queries will be answered in public
16
MP3S Industry Engagement Queries to m3ps@gps.gsi.gov.ukm3ps@gps.gsi.gov.uk Industry engagement at http://gps.cabinetoffice.gov.uk/i-am- supplier/supplier-industry-days/multi-purpose- personal-protective-system-mp3s Search – government procurement service mp3s
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.