Download presentation
Presentation is loading. Please wait.
Published byChristina Johnson Modified over 9 years ago
1
Suisun Valley School K-8 2013 Classroom Addition Project
3
Suisun Valley K-8 Classroom Addition Summary SITE MODIFICATION FEATURES 7 New classrooms centered around ‘courtyard’ spaces 3 New restrooms (Boys, Girls, Staff) 4 Existing portables relocated to accommodate a ‘finger plan’ design for better visibility New stamped concrete surface with tree planter boxes Revised parking lot New grass turf athletic field located behind the multi-use building New fenced Kindergarten playground area
4
Suisun Valley K-8 New Classrooms NEW BUILDING FEATURES Cool roofs for energy efficiency Abundant natural lighting (windows) Solar tube skylights for additional natural lighting Front and rear classroom exits Buildings set at grade- no ramps Roof overhangs for rain Central layout to allow better collaboration between classes
5
Enlarged Site Plan
6
Aerial View from North West
7
Aerial View from South West
8
View from South East
9
View from East
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.