NORTHERN RAILWAY AN OVERVIEW 1. NORTHERN RAILWAY ROUTE MAP 2.

Similar presentations


Presentation on theme: "NORTHERN RAILWAY AN OVERVIEW 1. NORTHERN RAILWAY ROUTE MAP 2."— Presentation transcript:

1 NORTHERN RAILWAY AN OVERVIEW 1

2 NORTHERN RAILWAY ROUTE MAP 2

3 SALIENT FEATURES DIVISIONS5 Delhi, Firozpur, Lucknow, Moradabad, Ambala STATES / UT8 / 1 Jammu & Kashmir, Himachal Pradesh, Punjab, Haryana, Delhi, Uttar Pradesh, Rajasthan, Uttarakhand and Chandigarh ROUTE KM7125 BG 6864, NG 261 RUNNING KM9239 BG 8978, NG 261 ELEC RKM2126 NORTHERN RAILWAY – AN OVERVIEW 3

4 SALIENT FEATURES LOCOMOTIVES894 ELECTRICAL 345, DIESEL 549 COACHES5543 WAGONS15511 WORKSHOPS4 (JUDW, ASR, AMV & KLK) DISASTER MANAGEMENT16 ART, 15 ARMV, 8 CRANES (140 TONNES) STAFF STRENGTH SANCTIONEDON ROLL OFFICER16801424 STAFF176449155554 (12572 recruited in 2012-13) NORTHERN RAILWAY – AN OVERVIEW 4

5 NORTHERN RAILWAY – PASSENGER SERVICES AT A GLANCE TRAINS1569 Mail/Exp 847, Passenger 722 Rajdhani11 daily 10 weekly Shatabdi13 Jan Shatabdi04 Duranto04 daily 09 weekly 3350 SPECIALS & 9299 COACHES AUGMENTED IN APR-Sept 2013 5

6 NORTHERN RAILWAY – PASSENGER SERVICES MAIN TERMINALS S.N.TERMINAL TRAINS PER DAY TYPE OF TRAINS PASSENGERS HANDLED (2012-13) (IN LACS) PASSENGER EARNINGS (2012-13) (RS. IN CR.) MAIL/EXPPASS. 1NEW DELHI3132081053411601 2DELHI243112131201361 3NIZAMUDDIN24517471149626 4JAMMU TAWI80701092334 5LUCKNOW24820444189291 6

7 EARNINGS OVER NORTHERN RAILWAY (in crores) YEAR (APRIL-SEPT) RECORD ORIGINATING TOTAL EARNINGS RECORD FREIGHT EARNINGS PASSENGEREARNINGS OTHER CHG SUNDRY 2012-136299.992744.103029.56337.08189.25 2013-147704.993681.353368.20364.10262.62 Improvement22.30%34.16%11.18%16.54%38.77% 7

8 8 FREIGHT OPERATIONS YEAR (APRIL-SEPT) TOTAL FREIGHT LOADING 2012-1322.25 MT 2013-1427.19 MT Record incremental growth22.20% YEAR (APRIL-SEPT) TOTAL FOODGRAIN LOADING 2012-139.65 MT 2013-1413.65 MT Improvement43.23%  Freight loading of 27.19 MT during April to September 2013, is a new record.

9 PUNCTUALITY OF MAIL/EXPRESS TRAINS YEAR (APRIL-SEPT) OVERALL M/EXP PUNCTUALITY % 2012-1382 2013-14 89 (Record) YEAR (APRIL-SEPT) PUNCTUALITY % OF MR TRAINS 2012-1384 2013-14 93 (Record) 9

10 PUNCTUALITY OF MAIL/EXPRESS TRAINS  PUNCTUALITY ABOVE 90% ACHIEVED FOR THE MONTHS OF MAY, AUGUST AND SEPTEMBER 2013.  A NEW RECORD OF 92.65% PUNCTUALITY OF MAIL/EXPRESS TRAINS WAS MADE IN THE MONTH OF SEPTEMBER 2013.  INTENSIVE MONITORING, SIGNIFICANT REDUCTION IN ASSET FAILURES AND RATIONALIZATION OF TRAIN MOVEMENT THROUGH TIME TABLING CHANGES, BROUGHT ABOUT THIS PERCEPTIBLE IMPROVEMENT IN PUNCTUALITY OF M/EXP TRAINS.  NR HAS THE HEAVIEST PASSENGER OPERATION OVER IR WITH 505 MAIL/EXPRESS TRAINS DAILY.  PASSENGER AND SUBURBAN PUNCTUALITY ALSO IMPROVED OVER LAST YEAR. 10

11 NORTHERN RAILWAY – SAFETY CONSEQUENTIAL ACCIDENTS YEARCOLLISIONDERAILMENTLC FIRE IN TRAINS MISC.TOTAL TRAIN ACCIDENTS PER MILLION TRAIN KMS 2010-111129*-1230.19 2011-12-1214*-1220.17 2012-13-515*--200.16 ( Apr- Sept) 2013-14 -541-100.14 (* includes 13 accidents at unmanned crossings each in 2011-12 & 2012-13 and 7 in 2010-11 due to negligence of road users.) 11

12 12 ASSET RELIABILITYITEM Cumulative up to Sept’2012 Cumulative up to Sept’2013 % Variation - Imp. / + Det. RAIL FAILURE276148-46.37 DSL LOCO FAILURE267282+5.61 ELEC LOCO FAILURE2926-10.34 ROADSIDE WAGON DETACHMENTS 6846-32.35 COACH DETACHMENTS 43-25.00 OHE FAILURES47+75.00 SIGNAL FAILURES2028417513-13.66

13 13 NEW LINES COMMISSIONED (IN 2012-13 AND 2013-14): Qazigund – Banihal18 Km ( Rs 1700 cr.) Abohar – Fazilka43 Km ( Rs 230 cr. ) Rewari – Rohtak75 Km ( Rs 603 cr. ) Chandigarh – Ludhiana68 Km ( Rs 680 cr. ) TOTAL 204 Km ( Rs 3,213 cr.)  DOUBLING COMPLETED: 18 Km Doubling between Mansa - Maur Completed in 2013-14. (Commissioning will be done after non-interlocking in Yards)

14 NEW INITIATIVES  LARGEST UNDERPASS OF INDIA AT SARITA VIHAR – BY BOX PUSHING LENGTH 57 METERS (TOTAL LENGTH UNDERPASS IS 178 METERS IN RAILWAY PORTION.  COMPASSIONATE APPOINTMENTS – 1027 (BETWEEN APR TO SEPT’13)  SETTLEMENT CASES – 4177 (BETWEEN APR TO SEPT’13)  MACP – 6092 (BETWEEN APR TO SEPT’13)  LIMS – LEGAL INFORMATION MANAGEMENT SYSTEM IMPLEMENTED FOR EFFECTIVE MONITORING OF COURT CASES.  LARGESS – 2446 WARDS RECRUITED (BETWEEN APR TO SEPT’13)  IMPROVEMENT IN KALKA – SHIMLA RAILWAY – SPECIAL STOCK  IMPROVEMENT IN REWARI STEAM LOCOMOTIVE SHED  DEVELOPMENT OF YARD CLEANING MACHINE 14

15 NEW INITIATIVES – Contd….  SELECTION CALENDER FINALISED  COMPLETE SWITCH OVER TO E-AUCTION W.E.F. 01.06.2013  IMPLEMENTED JOINT PROCEDURE ORDER BETWEEN S&T, OPERATING AND ENGINEERING REGARDING MACHINE PACKING OF TURNOUTS.  CCTV MONITORING OF BOOKING, RESERVATION & OTHER SENSITIVE AREAS.  SIG INSPECTION BY SAG OFFICERS OF HEADQUARTER AND DIVISION STARTED. 15