1
NORTHERN RAILWAY AN OVERVIEW 1
2
NORTHERN RAILWAY ROUTE MAP 2
3
SALIENT FEATURES DIVISIONS5 Delhi, Firozpur, Lucknow, Moradabad, Ambala STATES / UT8 / 1 Jammu & Kashmir, Himachal Pradesh, Punjab, Haryana, Delhi, Uttar Pradesh, Rajasthan, Uttarakhand and Chandigarh ROUTE KM7125 BG 6864, NG 261 RUNNING KM9239 BG 8978, NG 261 ELEC RKM2126 NORTHERN RAILWAY – AN OVERVIEW 3
4
SALIENT FEATURES LOCOMOTIVES894 ELECTRICAL 345, DIESEL 549 COACHES5543 WAGONS15511 WORKSHOPS4 (JUDW, ASR, AMV & KLK) DISASTER MANAGEMENT16 ART, 15 ARMV, 8 CRANES (140 TONNES) STAFF STRENGTH SANCTIONEDON ROLL OFFICER16801424 STAFF176449155554 (12572 recruited in 2012-13) NORTHERN RAILWAY – AN OVERVIEW 4
5
NORTHERN RAILWAY – PASSENGER SERVICES AT A GLANCE TRAINS1569 Mail/Exp 847, Passenger 722 Rajdhani11 daily 10 weekly Shatabdi13 Jan Shatabdi04 Duranto04 daily 09 weekly 3350 SPECIALS & 9299 COACHES AUGMENTED IN APR-Sept 2013 5
6
NORTHERN RAILWAY – PASSENGER SERVICES MAIN TERMINALS S.N.TERMINAL TRAINS PER DAY TYPE OF TRAINS PASSENGERS HANDLED (2012-13) (IN LACS) PASSENGER EARNINGS (2012-13) (RS. IN CR.) MAIL/EXPPASS. 1NEW DELHI3132081053411601 2DELHI243112131201361 3NIZAMUDDIN24517471149626 4JAMMU TAWI80701092334 5LUCKNOW24820444189291 6
7
EARNINGS OVER NORTHERN RAILWAY (in crores) YEAR (APRIL-SEPT) RECORD ORIGINATING TOTAL EARNINGS RECORD FREIGHT EARNINGS PASSENGEREARNINGS OTHER CHG SUNDRY 2012-136299.992744.103029.56337.08189.25 2013-147704.993681.353368.20364.10262.62 Improvement22.30%34.16%11.18%16.54%38.77% 7
8
8 FREIGHT OPERATIONS YEAR (APRIL-SEPT) TOTAL FREIGHT LOADING 2012-1322.25 MT 2013-1427.19 MT Record incremental growth22.20% YEAR (APRIL-SEPT) TOTAL FOODGRAIN LOADING 2012-139.65 MT 2013-1413.65 MT Improvement43.23% Freight loading of 27.19 MT during April to September 2013, is a new record.
9
PUNCTUALITY OF MAIL/EXPRESS TRAINS YEAR (APRIL-SEPT) OVERALL M/EXP PUNCTUALITY % 2012-1382 2013-14 89 (Record) YEAR (APRIL-SEPT) PUNCTUALITY % OF MR TRAINS 2012-1384 2013-14 93 (Record) 9
10
PUNCTUALITY OF MAIL/EXPRESS TRAINS PUNCTUALITY ABOVE 90% ACHIEVED FOR THE MONTHS OF MAY, AUGUST AND SEPTEMBER 2013. A NEW RECORD OF 92.65% PUNCTUALITY OF MAIL/EXPRESS TRAINS WAS MADE IN THE MONTH OF SEPTEMBER 2013. INTENSIVE MONITORING, SIGNIFICANT REDUCTION IN ASSET FAILURES AND RATIONALIZATION OF TRAIN MOVEMENT THROUGH TIME TABLING CHANGES, BROUGHT ABOUT THIS PERCEPTIBLE IMPROVEMENT IN PUNCTUALITY OF M/EXP TRAINS. NR HAS THE HEAVIEST PASSENGER OPERATION OVER IR WITH 505 MAIL/EXPRESS TRAINS DAILY. PASSENGER AND SUBURBAN PUNCTUALITY ALSO IMPROVED OVER LAST YEAR. 10
11
NORTHERN RAILWAY – SAFETY CONSEQUENTIAL ACCIDENTS YEARCOLLISIONDERAILMENTLC FIRE IN TRAINS MISC.TOTAL TRAIN ACCIDENTS PER MILLION TRAIN KMS 2010-111129*-1230.19 2011-12-1214*-1220.17 2012-13-515*--200.16 ( Apr- Sept) 2013-14 -541-100.14 (* includes 13 accidents at unmanned crossings each in 2011-12 & 2012-13 and 7 in 2010-11 due to negligence of road users.) 11
12
12 ASSET RELIABILITYITEM Cumulative up to Sept’2012 Cumulative up to Sept’2013 % Variation - Imp. / + Det. RAIL FAILURE276148-46.37 DSL LOCO FAILURE267282+5.61 ELEC LOCO FAILURE2926-10.34 ROADSIDE WAGON DETACHMENTS 6846-32.35 COACH DETACHMENTS 43-25.00 OHE FAILURES47+75.00 SIGNAL FAILURES2028417513-13.66
13
13 NEW LINES COMMISSIONED (IN 2012-13 AND 2013-14): Qazigund – Banihal18 Km ( Rs 1700 cr.) Abohar – Fazilka43 Km ( Rs 230 cr. ) Rewari – Rohtak75 Km ( Rs 603 cr. ) Chandigarh – Ludhiana68 Km ( Rs 680 cr. ) TOTAL 204 Km ( Rs 3,213 cr.) DOUBLING COMPLETED: 18 Km Doubling between Mansa - Maur Completed in 2013-14. (Commissioning will be done after non-interlocking in Yards)
14
NEW INITIATIVES LARGEST UNDERPASS OF INDIA AT SARITA VIHAR – BY BOX PUSHING LENGTH 57 METERS (TOTAL LENGTH UNDERPASS IS 178 METERS IN RAILWAY PORTION. COMPASSIONATE APPOINTMENTS – 1027 (BETWEEN APR TO SEPT’13) SETTLEMENT CASES – 4177 (BETWEEN APR TO SEPT’13) MACP – 6092 (BETWEEN APR TO SEPT’13) LIMS – LEGAL INFORMATION MANAGEMENT SYSTEM IMPLEMENTED FOR EFFECTIVE MONITORING OF COURT CASES. LARGESS – 2446 WARDS RECRUITED (BETWEEN APR TO SEPT’13) IMPROVEMENT IN KALKA – SHIMLA RAILWAY – SPECIAL STOCK IMPROVEMENT IN REWARI STEAM LOCOMOTIVE SHED DEVELOPMENT OF YARD CLEANING MACHINE 14
15
NEW INITIATIVES – Contd…. SELECTION CALENDER FINALISED COMPLETE SWITCH OVER TO E-AUCTION W.E.F. 01.06.2013 IMPLEMENTED JOINT PROCEDURE ORDER BETWEEN S&T, OPERATING AND ENGINEERING REGARDING MACHINE PACKING OF TURNOUTS. CCTV MONITORING OF BOOKING, RESERVATION & OTHER SENSITIVE AREAS. SIG INSPECTION BY SAG OFFICERS OF HEADQUARTER AND DIVISION STARTED. 15