1 Team 5 Scott Craig Cody Maher Jesse Ross Brian Van Stratum

2 Visit to C.H. Corn Power Plant February 1, 2007 Located 20 miles southwest of Tallahassee at southern tip of Lake Talquin One of only two hydroelectric plants in state of Florida

3 Visit to C.H. Corn Power Plant Three turbines – one Kaplan and two propeller Maximum power generation of 12 MW Typical power output is about 3 MW 12 MW is about 3% of Tallahassee’s typical power need of 425 MW

4 Visit to C.H. Corn Power Plant Built in 1929 by West Florida Power Company Abandoned as a power plant in 1970 Refurbished in 1981 by City of Tallahassee as a hydroelectric demonstration project Became fully operational in 1985 under City of Tallahassee Electric Utility Services

5 Visit to C.H. Corn Power Plant

6 User Demands Water Wheel Generator Head Rectifier Bridge Battery Monitor DC Disconnect Charge Controller Dissipating Load Inverter Nautilus Islanded Battery Operation Battery

7 User Demands Generator Head Dissipating Load and/or Inverter AC Controller Islanded Operation w/ No Batteries

8 Water Wheel Nautilus Charge Controller Dissipating Load DC DisconnectInverter DC Signal Net Meter Utility Grid-Connected Battery Operation Battery Monitor Battery

9 Water Wheel Nautilus Grid Connected System w/ No Battery AC Signal Dissipating Load AC Controller Utility Net Meter

10 Utility Gridpoint Connect User Demands or Renewable Energy (Can operate in grid connected or islanded mode) Grid Point Connect Represents a Simple and Flexible Solution

11 Gridpoint All in one design Integrated inverter, controller, power electronics Plug and play Battery storage Circuit protection Online monitoring Currently designed for photovoltaics (interest sparked)

12 Turbine Options & Costs ABS Alaskan (www.absak.com) Nautilus: 3 turbines needed each priced at $10,600 Total = $31,800 Power 3 x 1900 W = 5700 W 50 year expected life Neptune: 3 turbines needed each priced at $XXXXX Total = $XXXX Power 3 x 1900 W = 5700 W 50 year expected life.

13 Turbine Options & Costs Energy Systems & Design (www.microhydropower.com) LH1000: 9 turbines needed each priced at $2,625 Total = $23,625 Only one year warranty

14 Water Wheel Costs Water Wheel Factory Overshot design 9 ft diameter, all steel structure $12,000 Also considered is a breast wheel design, doubling the price of the original wheel

15 No Longer Under Consideration Voith Siemens Turbine $500,000 Construction Costs Sponsor only requires component selection and general layout

16 Turbine and Water Wheel Decision Matrix WeightWater Wheel IWater Wheel IINautilusNeptuneLH 1000 Cost ($)11%9.56.54.62.56.6 Life Expectancy (Years) 28%3.0 10.0 0.4 Maintenance (Years) 6%1.0 7.0 1.0 Integration w/current dam 17%8.0 10.05.07.0 Aesthetics11%8.010.06.55.02.0 Percent Utilized 28%10 666.7 Total -6.96.87.76.54.1

17 Savings

18 IEEE 1547 Standard for Interconnecting Distributed Resources with Electric Power Systems 250kW or more requires monitoring Isolation device required Frequency must be within 0.5Hz of grid Voltage must be within 10% of grid voltage Phase angle must be within 20° of grid phase

19 Website www.fsuhydroturbine.com Previous presentations, fall report, etc available on site In process of mirroring site to www.eng.fsu.edu/ME_sen ior_design/2007/team5/in dex.html Converting to html

20 Remaining Schedule

21 Questions?