Download presentation
Presentation is loading. Please wait.
Published byCordelia Parker Modified over 9 years ago
1
CHPS Era Archive/Data Backup John Halquist Development and Operations Officer National Operational Hydrologic Remote Sensing Center (NOHRSC) HIC Meeting – Feb 2010
2
Major categories for Archive use General Archive requirements Model development Unitgraph Routing Calibration Verification Analogs Studies Case studies Applied Research Modeling/Product improvement Hindcasting/Reanalysis
3
Current situation NWS IHFS (ops DB) NWSRFS ofs-de raw SHEF-dec. proc.SHEF-dec. RAX archive RDB flat files (grids) (field) data acquisition SHEF-dec. FEWS fc DB XSETS … products MPE NAVX ICP EVS SHEF
4
Current situation (FEWS archive) FEWS archive: all data related to forecast bundled in one zip file forecast and associated inputs can be retrieved in stand alone FEWS data not directly accessible Recommendation: intermediate solution only (as short as possible) FEWS fc DB meta data RDB zip files archive-server
5
Where do we plan to go?
6
import ExchangeGridPoint Could use SOAP or PI Possible NEW import JAVA class Enhanced or Additional FEWS Export functionality GG Calb Verif IWRSS
7
Key differences from existing Archive System Data flows “through” the operational system to feed the Archives eliminates Quality Control nightmare minimizes multiple “decode” pathways Provide for a more “Integrated” Archive 2 way data flow to support usage in operations and analysis Scalable, Flexible & Extensible architecture hardware & database schemas
8
Filling in the gaps …
9
Gaps in current requirements: Meta-data What do we really need? What do we want? What about current archived data with little meta-data? Modifiers in CHPS Implemented significantly different than NWSRFS Some decisions need to be made on how we want to handle modified time series
10
CHPS time series, example: original data timeseries modifiers time series used
11
Hardware modification: chps2 (rdms) Enclosure* (tuples) Expansion… Fileserver* Enclosure* (Flat files) Expansion… * Indicates New hardware
12
Schedule objectives: Finalize conceptual design - Done Determine Hardware requirements – Mar 2010 Data requirements finalization – May/Jun 2010 Build Prototype system – Sept 2010 Test system built at NOHRSC Operational field test at NWRFC Provide initial DB Schema for review – Nov 2010 Field Deployment - ~2012
13
fini...
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.