8

9 Flow Meter Installation
& Application Considerations

10 Sage Flow Meter Perfectly Designed Perfectly Built
Take One - Sage Flow Meter Perfectly Designed Perfectly Built Perfectly Calibrated

11 Add in – B llat a d sta In ion

12 Your Customer’s reaction

13

14

15 ooooooo…make it go away!

16 You gotta be kidding!

17 HAPPY  CUSTOMER

18 Good Job Dude!

19 Application Considerations
BASIC THEORY of FLOW STRAIGHT RUNS CONDITIONS TO AVOID INSERTION vs INLINE METERS FLOW CONDITIONING

20 CALIBRATION CONDITIONS
Basic Theory IN A PERFECT WORLD FIELD CONDITIONS EQUAL CALIBRATION CONDITIONS

21

22 APPLICATION CONDITIONS
GAS CONSTITUENTS NON-CONDENSING PIPE ID TYPE OF PIPE UPSTREAM STRAIGHT RUN PROBE INSERTION DEPTH

23 PIPE SIZE GAS UPSTREAM STRAIGHT RUN INSERTION DEPTH

24 PIPE SIZE As ordered and calibrated? Correct Pipe Schedule?
Correct for Velocities? GAS UPSTREAM STRAIGHT RUN INSERTION DEPTH

25 GAS PIPE SIZE Correct Gas? Correct % Constituents?
Moisture/Particles Present? UPSTREAM STRAIGHT RUN INSTALLATION DEPTH

26 UPSTREAM STRAIGHT RUN PIPE SIZE GAS Disturbances Multiple Disturbances
Fully Developed Flow INSTALLATION DEPTH

27

28

29

30

31 Velocity Profile in a River

32

33

34

35 PIPE SIZE GAS UPSTREAM STRAIGHT RUN INSTALLATION DEPTH

36

37 Velocity Profile in a Pipe

38 INSTALLATION DEPTH Center Probe in Pipe Page 15 Sage Prime Manual

39 Straight Run Requirements
Elbows Valves Expansions Reductions

40 FLOW CONDITIONING

41

42

43

44

45 Captive Flow Conditioners

46 Captive Conditioners Installed

47 Straight Run Requirements
DISTURBANCES WITHOUT CONDITIONING WITH SAGE CONDITIONING

48 90o Elbow Effect on Velocity Profile

49 Straight Run Requirements
One 90° Elbow W/O CONDITIONING 15 to 25 WITH CONDITIONING 3

50 Two 90o elbows – same plane
  

51 Straight Run Requirements
Two 90° Elbows in the same plane – within 3 diameters W/O CONDITIONING 20 to 36 WITH CONDITIONING 5

52 Two 90o elbows different planes
  

53 Straight Run Requirements
Two 90° Elbows in different planes – within 3 diameters W/O CONDITIONING 40 to 62 WITH CONDITIONING 9

54 4 to 1 reduction

55 Straight Run Requirements
Reduction in flow area (4/1) W/O CONDITIONING 15 to18 WITH CONDITIONING 3

56 4 to 1 expansion

57 Straight Run Requirements
Expansion in flow area (4/1) W/O CONDITIONING 30 to 84 WITH CONDITIONING 10

58

59

60

61

62

63 PIPE SIZE GAS UPSTREAM STRAIGHT RUN INSTALLATION DEPTH

64

65

66

67

68 ACFM vs SCFM Reference Conditions Pressure and Temperature effects

69 PRESSURE = 1 ATM 1 SCFM (1 ACFM)

70 PRESSURE = 2 ATM 2 SCFM (1 ACFM)

71 PRESSURE = 3 ATM 3 SCFM(1ACFM)

72 PRESSURE = 4 ATM 4 SCFM(1ACFM)

73 Electromagnetic & Radio Frequency INTERFERENCE (EMI / RFI)

74 Cummins Gen-Set VFD Walkie Talkie

75 Conducted EMI / RFI INTERFERENCE Signal Wires (4-20mA) Power Cables
Ground Connections Typical Solution: Ferrite Beads

76 EMI / RFI INTERFERENCE Coupled Components with mutual impedance
Can occur between two circuits that are not normally connected.

77 EMI / RFI INTERFERENCE Radiated Openings of any kind in Enclosures
in Conduits or Cables Typical Solutions: 1) Metal Enclosure 2) Shielded cable or conduit

78 EMI / RFI INTERFERENCE Best Avoided by using →
1) Metal Enclosures with CE Approval a) Prime b) Rio 2) Shielded conduits 3) Ferrite Beads

79 GAS CONSTITUENTS NON-CONDENSING PIPE ID TYPE OF PIPE
Application Summary GAS CONSTITUENTS NON-CONDENSING PIPE ID TYPE OF PIPE UPSTREAM STRAIGHT RUN PROBE INSERTION DEPTH

80 It’s Happy Hour!!!