Presentation is loading. Please wait.

Presentation is loading. Please wait.

2 3 4 5 CPDLC Expected Stakeholders 6 CPDLC Integration Team (CIT) Government/Industry/Union Team Providing Coordinated Management and Oversight of.

Similar presentations


Presentation on theme: "2 3 4 5 CPDLC Expected Stakeholders 6 CPDLC Integration Team (CIT) Government/Industry/Union Team Providing Coordinated Management and Oversight of."— Presentation transcript:

1

2 2

3 3

4 4

5 5 CPDLC Expected Stakeholders

6 6 CPDLC Integration Team (CIT) Government/Industry/Union Team Providing Coordinated Management and Oversight of the Project Integrated Schedule Risk Management Action Item Tracking Problem Tracking and Resolution CIT Meets Monthly Agenda Restricted to CPDLC Build I

7 7 American Airlines Allied Pilots Association Rockwell Collins ARINC FAA Free Flight Program Office (AOZ) En Route Systems (AUA-200) Miami ARTCC (ZMA) W. J. Hughes Technical Center (ACB-510, AOS-310) National Air Traffic Controllers Association (NATCA) Flight Standards (AFS-400) Aircraft Certification (AIR-130) Air Traffic Procedures (ATP-410) Delta Air Lines Air Line Pilots Association Teledyne Controls CPDLC Integration Team (CIT)

8 8 Miami ARTCC Airspace: 1,300,000 sq. kilometers Ranking: 7 th busiest US ARTCC (out of 20) Annual Operations: 2 million+ Record Day Operations: 8,245 (3/23/02)

9 9 Miami ARTCC Flight Strips per Year: 9 million+ Long Range Radar: 8 Discrete Frequencies: 101

10 10 CPDLC Build 1 Schedule

11 11 9 VDL-2 Ground Stations from Northern Florida to the Caribbean

12 12 20 CPDLC Certified B757/767s By End Of 2002

13 13 CMU-900 Message Router ATS End System CPDLC CM Message Communication Display Unit - MCDU Shared Functionality CPDLC Message Display Downlink Composition ACARS FMS Advisories VHF-920

14 14 4 CPDLC Certified B767-400s by Spring 2003

15 15 Multiple Interface Control Display Unit - MICDU Communications Management Unit - CMU Sextant VHF Data Radio - VDR

16 16 Service Certification Suite (SCS) Service Certification Suite Allows Miami Technicians to Perform End-to-end Testing and Certification of the CPDLC System. The SCS Sends and Receives Signals From ARINC’s VDL-2 Station Located a Few Miles Away at Miami International Airport

17 17 FAA Menu Build Work Station Allows the Air Traffic supervisors to compose free text messages for assignment to individual Sectors

18 18 Data Link Application Processors Context Management Processors DLAP CPDLC system application software Interfaces with FAA Host computer system Database management Data recording Menu build User Interface CMA ICAO-9705 CM logon service Allows CPDLC-equipped aircraft to logon to CM server Address data retrieved by DLAP

19 19 FAA Technical Center Testing 83,344 Total Testing Labor Hours for CPDLC Build I Prior to Delivery to Miami

20 20

21 21 FAA Convair 580 Test Bed ATN/AOA Testing 1 st Test Flight January 2002 5,000 Messages Exchanged 80 Hours of Testing

22 22 FAA B727 Test Bed CPDLC Testing 1 st Test Flight - March 2002 1,000+ Messages Exchanged 45 Hours of Testing

23 23 Airways Facilities Technician Training 6-day Training Course Software Troubleshooting Hardware Remove & Replace

24 24 FAA Air Traffic Controller Training 4-day training program Classroom/lecture Computer Based Instruction ATC Radar Training Lab (DYSIM)

25 25 CPDLC Build 1 Message Set Transfer of Communication Initial Contact Altimeter Setting Menu Text

26 26 First CPDLC Message

27 27 For Further Information About Our Program, Please Contact: Timothy R. Hancock Timothy.hancock@faa.gov FAA Free Flight Program Office

28 28

29 29


Download ppt "2 3 4 5 CPDLC Expected Stakeholders 6 CPDLC Integration Team (CIT) Government/Industry/Union Team Providing Coordinated Management and Oversight of."

Similar presentations


Ads by Google