Employment Level: 375+ Contract Relationships: 300+ Midwest Operations: 4 States (IA, IL, OK, CO) Sow Inventory: 60,000+ Finish Inventory: 750,000+ Animals Marketed: 1,400,000 hd Feed – Manufacturing: 405,000 Tons Feed – Tolled: 225,000 Tons Grain Facilities: 4 Communities (IA)
13
Insurance claims process Business interruption computations and involvement of outside expertise by carrier Reference (Forensic Accountant): Dave Schlader Buchanan Clarke Schlader, LLP Overland Park, KS
14
Safety Training Programs Facility inspections Thermography program Licensed electrical inspections
15
OSHA mock inspections Facility design – new construction Modifications to existing facilities Impact of claims on insurance renewal
17
Farrowing rooms 1–14 have one common attic space. Farrowing rooms 15–19 are separated by a walkway. The door going into these rooms is metal and has concrete around the door. Farrowing rooms 20–21 have a metal divider between the attic air space. Installed fire escape windows in all of the farrowing rooms. Installed curtain and cool cell evacuation equipment in hallways and gestation barn. Installed new generator – outside building.
18
Generator Details: 11 gallons/hour 350 gallons of diesel 1.3 days of fuel
19
Escape Windows were added at Fall Creek
20
Installed fire door between existing farrowing and new farrowing that extends the length of old farrowing (approximately 89 feet). 40/20 APA rating and D-Blaze Rating. Separate attic between existing and new farrowing. Installed fire doors between nursery and existing GDU barn. Attics are separated. Installed fire escape windows in all of the farrowing rooms. Installed curtain and cool cell evacuation equipment in hallways and gestation barn.
21
Generator Details: 12 gallons/hour 400 gallons of diesel 1.39 days of fuel
22
Have installed 8 fire doors in farrowing to separate farrowing rooms. 4 ft. on each side and up over the ceiling. Every hallway, from the concrete stub walls up to the ceiling are fire retarding. 40/20 APA rating and D-Blaze Rating. 1 attic firewall in the old gestation barn. 3 attic firewalls in the new gestation barn. New farrowing has an attic firewall separating 3 new rooms from the existing 5 rooms. 254 crates have been direct wired. All connecting hallways in the new construction have 3/4” fire retarding board on walls and ceiling.
23
Generator Details: 14 gallons/hour 300 gallons of diesel 0.89 days of fuel
24
Direct wire heat mats were added at MIPA in 254 crates
25
MIPA fire door in farrowing hallway
26
Have installed new fire doors separating existing farrowing from new farrowing. 6 ft. fire retarding wall on old farrowing and 10 ft. on new farrowing side. 40/20 APA rating and D-Blaze Rating. Have an attic firewall in the middle of new farrowing. Have a fire door separating existing gestation and new pen gestation. (8 ft. on each side) Have 2 cisterns with approximately 21,000 and 44,000 gallons of water on site. Installed new generator which is located outside the building. Installed fire escape windows in all of the farrowing rooms. New gestation barn has 4 attic firewalls. Old gestation barn has 3 attic firewalls.
27
Generator Details: 15 gallons/hour 1000 gallons of diesel 2.8 days of fuel
28
Two escape windows in new farrowing room
29
New Outdoor Generator and 2 cisterns with approximately 21,000 and 44,000 gallons of water on site.
30
Fire door and retarding wall to new farrowing room
31
Generator Details: 10 gallons/hour 300 gallons of diesel 1.3 days of fuel
32
Scheetz Have approximately 66% of the 672 crates at facility heat lamps hard wired. Oak Grove Have approximately 42% of the 1240 crates at facility heat lamps hard wired.
33
Generator Details : 14 gallons/hour 500 gallons of diesel 1.5 days of fuel
34
Direct wired lamps and direct wired heat lamps added to approximately 66% of the 672 crates.
35
Supplies for cutting curtains.
37
There are two 6 inch thick concrete fire walls extending from the concrete floor (foundation) through the ceiling at 8 feet and extending 38 inches outside of the outside wall of the building. In the attic, there is a wood frame above the concrete wall extending 32 inches above the roof. The wood frame is covered with Thermo Ply sheeting with a 1 hour fire rating Steel siding covers the Thermo Ply completely, inside and outside of the attic. Feed lines and a water line are the only lines through the concrete walls. No lines penetrate the walls in the attic.
38
Electric and natural gas services are brought into each section from the outside through the attic. Gas furnaces for the hallway are mounted outside of the building. The two fire walls divide the building into sections with two farrowing rooms on each end and three rooms in the center. Each room is approximately 44 feet by 76.5 feet. The hallway, which connects the rooms to the unit has a fire door at each fire wall. New fire alarms will be installed this winter that will tell us whether it is a fire or other issue and which building or room the alarm is coming from.
39
New Fire walls at Mult 1
40
New Fire walls and construction at Mult 1
41
Electrical service coming into the barn from outside and one of the furnaces that heat the hallway.
42
Shielding: Replacement of wooden supports for the generator mufflers at Mult 1.
43
Electrical grounding of all farrowing crates in new farrowing rooms. (Inspector driven)
44
Replacement of wooden supports for the generator mufflers at Mult 2.
45
Please note: Local fire departments have been to our sites and are familiar with each location’s layout and their specific access points.