Download presentation
Presentation is loading. Please wait.
Published byEdmund Godwin Richard Modified over 9 years ago
1
Deryck Williams – Chairman Rick Lukay – WG Lead
2
Develop a technical report on recommended testing protocols for measuring HTHP rheology of cement slurry (temperatures greater than 190F and/or pressures greater than atmospheric pressure) with the intention of the report serving as the basis for a NWI.
3
Re-do round robin testing. Collect and compile all test data for Washington DC. Conduct another cement slurry round robin testing if required.
4
Due to the Chairman’s work/travel schedule Rick Lukay has been assisting and has volunteered to lead the WG. The cement slurry design developed by Chevron (Ronnie Williams – ETC, Cement Lab) was shipped and tested.
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.