Download presentation
Presentation is loading. Please wait.
Published byJunior Barber Modified over 9 years ago
1
3-D Scanning for Corridor Mapping & Right of Way Usage Presented by: Martin R. Stoughton, PLS 910-520-1655 mstoughton@mckimcreed.com
2
Early Data Collection Techniques- How we got here Timeline of LiDAR Technology Terminology of LiDAR Technology Mobile Mapping and AirBorne LiDAR Systems –Limitations of Mobile Mapping –Advantages of Mobile Mapping –Sample Right of Way Project –Other LiDAR Applications –Data Extraction and Software Applications Quick Outline
3
Ancient Past- The Groma Roman line of sight surveying instrument for straight roads or right angle construction
4
Distant Past Lewis & Clark Expedition Compass and Chain surveys
5
Mid 19 th Century Railroads Mapped with Transits and Levels
6
Early Photogrammetry Professor Thaddeus Lowe ascending in the Intrepid to observe the Battle of Fair Oaks Earliest known Aerial Photo: 1860 Downtown Boston
7
Timeline of Technology 1904: “Telemobiloscope” (first form of RADAR sensor) developed by Christian Huelsmeyer. 1917: Albert Einstein first theorized about the process that makes lasers possible. 1960: Operable laser invented by Theodore Maiman. 1960: The first navigation satellite TRANSIT IB is launched for use by the U.S. Navy to accurately locate ballistic missile submarines and ships. 1969: Scientist measure the distance between the earth and moon. 1978: The first GPS Block I satellite is launched. Block I comprised of 10 developmental satellites launched from 1978 through 1989. 1983: President Ronald Reagan declassifies NAVSTAR; GPS becomes available to civilians. 1990: NAVSTAR GPS becomes operational. 1990s: LiDAR sensors capable of up to 25,000 pulses per second commercially available.
8
Terminology LiDAR Light Detection And Ranging MTLS Mobile Terrestrial Laser Scanning MMS Mobile Mapping System 3dLS 3d Laser Scanning LAS LiDAR native file format Point Cloud All XYZ points captured with LiDAR sensor Classified Point Cloud Point Cloud classified, typically includes (at minimum) Ground and Other Intensity Strength of reflectivity of returning pulse, recorded as a numerical value and converted to 8-bit image
9
Mobile LiDAR Platforms
10
Mobile Mapping System LiDAR Sensors 2 GPS units Inertial Measurement Unit (IMU) Distance Measurement Instrument (DMI) 2 Digital Cameras 2 LiDAR Scanners Each collecting 200,000 points per second Mounted to collect all data in a single pass 360 degree field of view IMU GPS Antenna DMI
11
Aerial LiDAR Platforms Reigl 680i LiDAR Onboard GPS Inertial Measurement Unit Lidar Sensor Intensity Multiple Return Ground based GPS
12
Gimbal Video TASE 150 TASE stabilized camera gimbals are designed to support the aerial oil/gas pipeline and electrical transmission and distribution inspection mission. Pipeline and power line owners rely on airborne imaging to identify and document issues along their property right-of-way. Using high-quality daylight and thermal imagery, TASE gimbals provide a reliable asset for airborne inspection of pipeline & power lines for early detection of failure points, right-of-way monitoring, vegetation management, supplementing LiDAR operations, storm response and recovery, as well as pipeline leaks or oil spills. Conductor from 524 ft away Short Wave Infrared (SWIR)
13
Line-of-Sight Traffic Topography Weather Considerations Rain Fog Standing Water Sky-line Visibility Urban Canyons Steep Terrain Limitations of Mobile Scanning
14
Advantages of Mobile Scanning Safety Schedule Survey Grade Accuracy Data extracted with calibrated photos Cost Effective because more efficient data collection equates to cost saving “Scan in the Can” lends to future data extraction without further field visits Video & Imagery Deliverables in standard formats
15
Data Collection Field to Finish 3 Phases Phase 1 – Field Collection and Initial Processing Phase 2 – Post Process to Project Datum Phase 3 – Extraction and Mapping
16
Software Programs Phase 1 – Field Collection PosView Lynx Survey PosPac DashMap DiskExtract ImageExtract QT Modeler Decode32 LynxView PhotoLapse 3 GPS Software Phase 2 – Post Processing Microstation TerraScan TerraMatch TerraPhoto CorpsCon 6.0 UltraEdit Phase 3 – Extraction/Mapping Cyclone TopoDOT Virtual Geomatics TerraSolid ESRI
17
Project Workflow Raw Data to LAS Files Final LAS Files Phase II Ground Scan-to-Scan Corrections Phase I Known Tie Line Corrections Tiles – Raw In Local Project Datum Tiles – Raw In State Plane Grid Initial Process to UTM Coordinate (Source Files) Raw Data (20 GB) If Local System
18
Purpose of Project Provide on-site positional references of the corridor boundary for future railroad engineering and planning. Encourage use of edge of corridor monumentation for safety reasons, in lieu of track centerline. To establish permanent railroad corridor monumentation, thereby reducing track shift errors associated with future improvements. Retrofit and Planning3 days Data Collection/Field Work7 days Data Processing10 days Data Extraction/Delivery 20 days Total 40 days
19
Railroad Corridor
20
Extracting Centerline Data
23
ROW Encroachments
24
ROW Monumentation
25
Mobile Scanning – Rail Corridors
26
Sample Applications Survey Grade Accuracy Engineering topographic surveys As-built surveys Structures and bridge clearance surveys Deformation surveys Forensic surveys Mapping Grade Accuracy Corridor study and planning surveys Asset inventory and management Environmental Surveys Sight distance analysis Earthwork Surveys Urban mapping Coastal zone erosion analysis
27
Utility Location
28
Asset Inventory
29
Example of Clearance Inspection Zone Transformer Drop Light Clamp Crossing Secondary Wire Transformer
30
Roadways
31
Beach Projects
32
Bridges
33
Railroads
34
Software Application to Simulate Flood
35
Data Extraction GIS Application
36
Data Extraction Roadway Application
37
Data Extraction Sign Inventory
39
Data Extraction Utility Inventory
40
3D Scanning (As-built Surveys)
41
Example CAD Deliverables
43
Questions & Answers
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.