1 SCIENCE COMPLEX Infrastructure Committee Presentation November 4, 2009

2 Existing Campus Master Plan Proposed Science Complex Site

3 Fly Through Presentation

4 Project Statistics PROGRAM  Physical Sciences- Chemistry and Physics  Life Sciences- Anatomy, Micro-biology, Physiology, Geology, Geography, Child Development and creative curriculum  Ancillary- Collaborative program uses BUILDING  3 stories, 81,000 GSF BUDGET  Award Contract: $48,401,233  Funding Measure J: $62,725,500SCHEDULE  Expected Design Phase Completion: November 2010  Expected Construction Phase Completion: July 2012  Expected Closeout Phase Completion: August 2012 SUSTAINABLE GOAL  LEED™ Rating of Platinum:56 Points

5 Master Plan Master Plan Academic Complex Student Services Complex Child Development Center Fine Arts Complex Nursing Central Plant P.E. and Wellness Science and Technology Complex

6 First Level Plan

7 Second Level Plan

8 Third Level Plan

9 SCIENCE COMPLEX

10

11 Campus Sustainable Features The project is expected to achieve 56 points for a LEED™ Platinum rating. Some of the campus-wide sustainable practices are: Central Plant Renewable Energy – Photovoltaic Farm at Campus Parking Lots Storm Water Management System Reclaimed Water System

12 LEED™ Checklist 56 Points - Platinum Certification

13

14

15

16

17 Photovoltaic & Shading Permeable Groundcover & Paving Natural Ventilation Exterior Corridors double function as deep Shading Device Materials w/ Recycled & Reclaimed Content High Performance Envelope & Glazing

18 Recycled Content & Low VOC Acoustic Wall Panels Flooring Acoustic Ceiling Tile Chair & Fabric Furniture Finishes Paint

19 Energy Efficiency Occupancy Sensor Lighting Daylight Natural Ventilation Daylight Energy Star Equipment