Second SSA Regional Workshop on “Capacity Development for the Clean Development Mechanism” Maputo, August 17-18, 2004 Mozambique Team Manuel Ruas.

Similar presentations


Presentation on theme: "Second SSA Regional Workshop on “Capacity Development for the Clean Development Mechanism” Maputo, August 17-18, 2004 Mozambique Team Manuel Ruas."— Presentation transcript:

1 Second SSA Regional Workshop on “Capacity Development for the Clean Development Mechanism” Maputo, August 17-18, 2004 Mozambique Team Manuel Ruas

2

3 What Is the Waste to Energy Project? Design of a method of treating waste. Accepts all urban waste. All waste diverted for recycling. Converted to energy or by-products. Little or no emissions to the atmosphere. Very environmentally friendly.

4 Present Methods of Waste Treatment Incineration Recycling Landfill

5 Objectives To build renewable energy plant that can be feasible and viable To improve the Maputo environment by reducing the harmful emissions to the atmosphere To help improve the general welfare of the population To improve the facilities available to the general public To contribute to further development of the theory of pyrolysis

6 The Project The plant size will be about 400,000 tons per annum of received waste Will be located in an area of some twenty hectares The industrial building will be about 7m high and the chimney 10m high The plant output will be: 1.2 GWh and 40 thousands cum per day

7 Urban Solid Waste Produced in Maputo Urbanization Degree USW Production (kg/cap*day)* USW Density (t/m ³ )* Daily Production (t) High (Ciment city) 1.0 (0.54 – 2.16) 0.22 – 0.25~ 230 Low (suburbs) 0.5 (0.45 – 0.55) 0.4~ 430 * Results from the AGRESU/GTZ project

8 Urban Solid Waste Composition

9 Process Application Solid Wastes Sludge Wastes Carbonaceous Materials Biomass

10 Investment Capital Waste Converters45.90 Gas Turbines40.30 Water Desalination Plant40.00 Civil Engineering Building20.95 Other Equipment31.85 Auxiliary21.00 Sub-Total200.00 Contingencies20.00 Total Capex220.00

11 Progress to date Agreement with the Maputo Municipality on waste supply The site has been identified MoU with power and water Utilities signed Project team in place

12 Way Forward Resource mobilization Raising of awareness among stakeholders Relevant studies Feasibility EIA Submission for funding


Download ppt "Second SSA Regional Workshop on “Capacity Development for the Clean Development Mechanism” Maputo, August 17-18, 2004 Mozambique Team Manuel Ruas."