1 ISS/STS Sub-Committee Dr. Sally Ride Dr. Leroy Chiao Dr. Charlie Kennel Gen. Les Lyles July 28, 2009
2
2 Review of Human Space Flight Plans Committee Agenda Background and context – Dr. Sally Ride Shuttle Scenarios – Dr. Sally Ride International Considerations – Gen. Les Lyles Space Station Scenarios – Dr. Leroy Chiao Summary & Committee Discussion – Dr. Charlie Kennel
3
3 Review of Human Space Flight Plans Committee Current Program Shuttle –7 flights remaining –Last flight scheduled for September, 2010 –Retirement frees (some) money for Constellation ISS –Complete in 2010 –De-orbit in early 2016 (per budget) –De-orbit frees (some) money for Constellation Constellation –Plan: 1 st launch in March, 2015 –Orion initially to ISS
4
4 Budget Scenario 1: Baseline Based on Human Spaceflight Budget Gap Shuttle Retirement CxP IOC ISS Retirement
5
5 Review of Human Space Flight Plans Committee Shuttle Carrying Costs
6
6 Review of Human Space Flight Plans Committee Current Program – More Realistic? (1) Shuttle fly-out – likely to extend into FY11 –Little margin remaining –Administration direction to fly out at safe rate –But… no funding currently reflected in FY11 budget To estimate reasonable fly-out scenario (for budget planning), compare actual post-Columbia flight rate to currently projected flight rate: –Post-Columbia, avg. between flights = 115 days –Currently projected manifest = 62 days –Assume avg. 90 days Implies fly-out to March, 2011 (for prudent budget planning)
7
7 Review of Human Space Flight Plans Committee Current Program- More Realistic? (2) Constellation schedule? LEO Access & ISS/STS sub-groups asked Aerospace to perform independent assessment of the Constellation Program –Cost, schedule, technical challenges, and risk –Method: Use program level analysis capability informed by technical and risk assessments based on expert opinion, historical data and technical analysis given time constraints Results indicate that Constellation IOC is likely to slip
8
8 Projected Constellation Program Funding has seen Significant Reductions since ESAS Budget Reduction Impact - FY10 President’s Budget Submittal (PBS) significantly reduces planned funding available to Cx program; More than $1.5B (FY09) per year starting in 2013 FY10 Budget Reductions ISS extension ESAS Anticipated Funding *Budget request data runs for 5 years; out-year data is OMB estimate *ESAS budget numbers were not normalized for accounting structure changes
9
9 Summary – Cx Program Independent Assessment Overall Results –There is a potential 1.5 year impact to the Orion / Ares I Initial Operational Capability (IOC) milestone due to the effects of the FY10 budget reductions –Per the Aerospace technical cost-risk assessment, there is an additional potential ~2 year impact to the Orion / Ares I Initial Operational (IOC) milestone due to the technical cost and schedule risk increase of the Cx Program –There is another potential 0.5 year impact to the Orion / Ares I Initial Operational Capability (IOC) milestone due to the effects of the ISS Extension to 2020
10
10 Impact to the IOC Milestone Multiple Effects Exacerbate the Gap
11
11 Review of Human Space Flight Plans Committee Current Program – More Realistic Cost? To see how much current program is more likely to cost, assume: –Shuttle fly-out through March, 2011 –Constellation IOC in mid-2017 (2 year delay) –ISS extends to 2020 (discussed later) Resulting budget impacts estimated by NASA’s independent PA&E group
12
12 Budget Scenario 2 Based on Human Spaceflight Budget Gap Shuttle Retirement CxP IOC ISS Retirement
13
13 Review of Human Space Flight Plans Committee Budget Scenario Comparison
14
14 Review of Human Space Flight Plans Committee Difference in Baseline & More Realistic Budgets
15
15 Review of Human Space Flight Plans Committee Other options besides Constellation unlikely to reduce this gap by much Gap in US ability to launch people into space –Reliance on Soyuz for crew transportation –Significant impact to workforce, potential lost skills Significant reduction in ability to carry cargo up to, or (especially) down from, ISS –Reliance on new, but unproven launch systems (HII-B, Falcon 9, Taurus II) –Limits utilization 091011121314151617181920 Future HSF Programs Space Shuttle Ops U.S. HSF Gap The Gap
16
16 Review of Human Space Flight Plans Committee Shuttle Scenarios The sub-group selected 3 shuttle fly-out or extension scenarios for the full committee to consider Program implications and budget estimates were provided by the Shuttle Program Scenarios: 1. Fly-out existing manifest through March, 2011 2. Add one additional shuttle flight in 2012 (ISS support) 3. Extend shuttle at 2 flights/year through 2014 (partially close gap) (note: analyzed in conjunction with Shuttle-derived HLV)
17
17 Review of Human Space Flight Plans Committee Shuttle Scenario 1 Fly-out existing manifest through March, 2011 Rationale: – Little margin remains in the shuttle schedule; experience indicates that it will take longer than currently projected to safely fly out the manifest. This scenario is more realistic, and would avoid undue pressure to complete flights within a particular budget year. Advantages: –Prudent fly-out schedule –Allows realistic budget planning Disadvantages: –Additional cost to current plan (but is likely closer to reality)
18
18 Review of Human Space Flight Plans Committee Shuttle Scenario 1 (cont’d) Fly-out existing manifest through March, 2011 Cost: –$1.5 B (includes some carrying costs; most in FY11) Notes: –No operational impact to Constellation program –Little change in workforce reduction
19
19 Review of Human Space Flight Plans Committee Shuttle Scenario 2 Add one additional shuttle flight in 2012 Rationale: –ISS is totally dependent on 4 new vehicles for logistical, maintenance, and utilization support. 3 have never flown, 1 has only flown once. There is a risk of delays in one or more that could adversely affect ISS utilization (US National Lab and International). This scenario also offers limited ability to handle unforeseen up- or down- mass requirements. Advantages: –Mitigate ISS reliance on unproven resupply capability –Enable some additional utilization support –Retain US human launch capability slightly longer Disadvantages: –Additional cost (significant, for only 1 flight)
20
20 Review of Human Space Flight Plans Committee Cargo Capacity to/from ISS
21
21 Review of Human Space Flight Plans Committee Shuttle Scenario 2 (cont’d ) Add one additional shuttle flight in 2012 (ISS support) Cost: –$4.2 B over current baseline; $2.7 B over Shuttle Scenario 1. Notes: – Shuttle program has one extra ET (not necessary to restart production) – Flights phased to best support ISS – Some (not much) relief for workforce transition – Still loss of skilled ops workforce
22
22 Review of Human Space Flight Plans Committee Shuttle Scenario 3 Extend shuttle at 1-2 flights/year through 2014 (partially close gap) (note: analyzed in conjunction with Shuttle-derived HLV) Rationale: The most realistic way to significantly reduce the gap (and to robustly use ISS’ full capability) is to extend the Shuttle. When coupled with a Shuttle-Derived HLV, the synergy could mitigate the cost of shuttle extension. Advantages: –Reduces the gap in US human launch capability –Supports robust US and International utilization of the ISS –Smooth workforce transition –Takes maximum advantage of existing infrastructure and production capabilities (cost savings, which should be investigated) Disadvantages: –Cost, but mitigated when coupled with Shuttle-Derived HLV –Extends life of shuttle; independent risk assessment recommended
23
23 Review of Human Space Flight Plans Committee Shuttle Scenario 3 (Cont’d) Cost: –Difficult to compare directly at this stage (because of different carrying cost profile) –Should be referred to Beyond LEO group and PA&E for consistent comparisons Notes: –Preliminary estimate: Shuttle-Derived IOC in 2016 –Shuttle & Shuttle-Derived HLV not anticipated to compete for facilities or resources –Savings in Soyuz costs for ISS
24
ISS Post 2015 Options Review of U.S. Human Space Flight Plans Committee Leroy Chiao 7/28/09
25
NATIONAL AERONAUTICS AND SPACE ADMINISTRATION AUTHORIZATION ACT OF 2005 (P.L. 109-155) SEC. 601. PLAN TO SUPPORT OPERATION AND UTILIZATION OF THE ISS BEYOND FISCAL YEAR 2015. –(a) In General- The Administrator shall take all necessary steps to ensure that the International Space Station remains a viable and productive facility capable of potential United States utilization through at least 2020 and shall take no steps that would preclude its continued operation and utilization by the United States after 2015.
26
Options Considered ISS Option 1: End U.S. participation in ISS at the end of 2015 (Baseline) ISS Option 2: Continue U.S. participation at current level, through at least 2020 ISS Option 2a: Enhanced U.S. participation at current level, through at least 2020
27
ISS Option 1: End U.S. participation in ISS at the end of 2015 (Baseline) Advantages –Some funds would be shifted to Constellation But, majority of ISS costs are fixed (e.g. training and operations facilities) –These would be paid by Constellation after 2015, so the actual savings would only be a fraction of ISS operations costs Decommissioning costs must be deducted
28
ISS Option 1: End U.S. participation in ISS at the end of 2015 (Baseline) Disadvantages –US would cede leadership position in HSF Loss of international prestige, not only in space exploration If Orion is delayed past the end of 2015, US HSF stops. US would assume a position behind Russia and China –Damage to international relations Would affect future international projects, not only in space Loss of functioning international framework –Loss of national and international asset Minimal ROI Disruption in HSF medical research, some of which may have implications to life on Earth
29
ISS Option 1: End U.S. participation in ISS at the end of 2015 (Baseline) Disadvantages (continued) –Potential loss of National Lab concept Customers may not expend effort and funding for short term opportunity –Negative impact on COTS providers –Additional workforce impacts, if Orion delayed past the end of 2015
30
ISS Option 1: End U.S. participation in ISS at the end of 2015 (Baseline) Notes –IP’s issued strong joint statement to continue ISS operations past 2015 July 2008 ISS Heads of Agency meeting –Russia has stated that it will continue ISS operations past 2015, regardless of US decisions May not be possible technically –But, the US should not underestimate Russia’s ability to execute a creative solution
31
ISS Option 1: End U.S. participation in ISS at the end of 2015 (Baseline) Notes –Estimates show that IP’s could not absorb operations costs ITAR would also be an issue for transfer of operations to IP’s –Analysis of “mothballing” ISS Order of magnitude increase in risk of loss of vehicle –Increase in risk of uncontrolled entry »Liability and image issues –Minimal operating mode still expensive (2-3 crew) Utilization costs are very small relative to ops costs –Full analyses would be required for de-orbit case Should be started soon
32
ISS Option 2: Continue U.S. participation at current level, through at least 2020 Advantages –US maintains leadership position in HSF –Maintain international partnership –Opportunity for innovation National Lab concept New research Commercial –Supports COTS efforts
33
ISS Option 2: Continue U.S. participation at current level, through at least 2020 Disadvantages –Requires additional funding, past 2015
34
ISS Option 2: Continue U.S. participation at current level, through at least 2020 Notes –Leadership in space exploration is highly visible –Operations-only case Majority of operations costs are fixed. Thus, savings from this case would be significantly limited
35
ISS Option 2a: Enhanced U.S. participation, through at least 2020 Advantages –US expands leadership position Clear commitment to full utilization of ISS –Opportunity to expand international partnership Further align space program with national objectives –Opportunity to build on ISS partnership for exploration “Training wheels” for International Exploration agreement –Opportunity for full realization of National Lab concept Maximum return on construction investment –Opportunity for use as technology and operations test bed
36
ISS Option 2a: Enhanced U.S. participation, through at least 2020 Disadvantages –Slightly higher cost than Option 2 Most ISS operations costs are fixed, so additional utilization costs would be relatively small Transportation costs could be a significant variable
37
ISS Option 2a: Enhanced U.S. participation, through at least 2020 Notes –Inclusion of new partners should be aligned with US national interests –New IP plan should be integrated Consider political interactions –Some potential candidate nations are financially healthy Potential cost offset for current partners
38
ISS Option 2a: Enhanced U.S. participation, through at least 2020 Notes –New partners may offer game changing opportunities Example: China is only the third nation capable of HSF independently
39
39 Back-up
40
40 Review of Human Space Flight Plans Committee Ground Rules and Assumptions Scenario 1, Baseline –Space Shuttle Program ends in fiscal year 2010 –International Space Station ends in fiscal year 2016 –Constellation Initial Operating Capability occurs in fiscal year 2015 Scenario 2 –Space Shuttle Program ends in the middle of fiscal year 2011 (February) –International Space Station ends in fiscal year 2020 –Constellation Initial Operating Capability occurs in fiscal year 2017 Data based on human spaceflight budget given to Augustine committee International Space Station Fixed Costs Based on official human spaceflight plans No Shuttle tanks, booster, or engines built in 2010 or beyond, operations only for Scenario 1 Additional Shuttle hardware built as required for Scenario 2
41
41 Review of Human Space Flight Plans Committee Scenario 1 Based on Human Spaceflight Budget Scenario 2 Based on Human Spaceflight Budget Total = $99.2 Billion Total = $114.5 Billion
42
Trend
43
Question 3 An assessment of the case that combines shuttle extension with a shuttle-derived HLV (i.e., any of the versions that retain ET & (4 segment) SRB infrastructure. –Assume 1-2 additional STS flights per year from 2012 - 2015; –assume IOC of the new vehicle in 2017. –We're particularly interested in impacts on STS costs and workforce (gov't and contractor). –Also identify when the two programs would begin to meaningfully compete for facilities/resources. Response –Close the Gap option flies SSP through 2014 with IOC in 2016. –No significant conflict between the two programs was identified. –Options with their cost and workforce impacts are covered in the attached presentation 7/21/2009 43