Yuma Desalting Plant Plant Demonstration Run – Successes and Challenges
2
NPR Boondoggle to Boom
3
Yuma Desalting Plant Largest Plant of its kind in the United States Constructed to desalt Wellton-Mohawk water <150ppm product water discharged to Colorado River For inclusion in water deliveries to Mexico Reduces releases from river system reservoirs
4
>200 Olympic size pools per day
5
Yuma Desalting Plant Largest Plant of its kind in the United States Constructed to desalt Wellton-Mohawk water <150ppm product water discharged to Colorado River For inclusion in water deliveries to Mexico Reduces releases from river system reservoirs
6
60 acre site of the YDP
7
Plant’s past and present Last operated in 1993 Stopped by flooding on the Gila River No need under abundant water conditions That’s changed; serious drought decade to date Plant is a potential tool to extend water supplies
8
Flooding on the Gila River
9
Plant’s past and present Last operated in 1993 Stopped by flooding on the Gila River No need under abundant water conditions That’s changed; serious drought decade to date Plant is a potential tool to extend water supplies
10
Low water at Lake Mead
11
Demonstration operation Reclamation committed to demonstrating operation of the plant in early 2006. Five objectives: Re-establish that the plant can run Clarify performance and cost estimates Demonstrate current technology Improve overall plant readiness Provide measurements of water quality impacts
12
Technological improvements
13
Demonstration operation Reclamation committed to demonstrating operation of the plant in early 2006. Five objectives: Re-establish that the plant can run Clarify performance and cost estimates Demonstrate current technology Improve overall plant readiness Provide measurements of water quality impacts
15
Demo run ceremony
16
Scope and scale of the demo 10% of full capacity operation 90 day duration Ensured a valid test at a reasonable cost Demonstration run began on March 1 All objectives have been met
17
Added success Government, water users and conservation interests can find common ground Heightened interest in potential alternative uses of the plant
18
Alternative uses of the plant Process a different feed water Produce potable water
19
The challenge Where does this plant fit into the water supply picture for the Lower Colorado River? How do we best use this asset?