Download presentation
Presentation is loading. Please wait.
Published byErnest Strickland Modified over 9 years ago
3
Tool Bar – eIRB Helpdesk Step by step instructions and tutorials Contact information – eIRB Survey submit your feedback to the IRB – What’s New Learn about updates to the eIRB system, forms, etc. Grey “Breadcrumb Trail” – Tells where you are in eIRB
4
Left Navigation Bar – Account Management (Non-JHED Users Only) – eIRB Training – My IRB Studies – Create New Application Studies List – Studies are listed by project type
5
Action Required (default tab) – Studies that have been returned for PI response Researcher Prep – Studies that have never been submitted In Process – Studies awaiting Pre-IRB or IRB review Approved – Studies that have been Approved All My IRB Studies – All approved, disapproved, expired, terminated, disapproved or withdrawn studies with which you are associated
6
Select My IRB Studies on the left navigation bar. Create… Click the Create… button to begin an eIRB application.
8
– Hide/Show Errors Click to split the screen, display errors, and provide links to screens. Click again to hide the split screen.
9
– Jump To Displays list of required screens. Use the list to navigate to non- consecutive screens.
11
Complete all *required fields on the initial screen. Click Save to create the application and assign it an IRB number. eIRB application numbers begin with “IRB” and may be found in the upper right corner of the application screens.
12
The Help Link icon appear beside each question. –Click the “?” icon to access IRB Regulatory Guidelines and Policies and download forms/templates.
20
Application Waiting to be Submitted – Purple text will disappear upon submission of the application. Study Vital Statistics – Displays the study title, number, PI, IRB Committee, review type, date submitted and last scheduled review. Current Status – Displays the current status of the application in the submission/review process.
21
IRB Review List – Displays the review date, review type, outcome, and letter sent (only if the application has undergone IRB review – not IRB pre-review). Workspace Tabs – Provide quick access to study- related information. – Will appear as needed. – History Log Reflects completed activities. – Reviewer Notes Displays a collective list of IRB issues that require a response by the study team.
22
Left Navigation Bar – Divided into two sections. View/Print New Application – View/Edit gives access to the existing application. – Printer Friendly View displays a scrollable version of the application with the option to print. Uploaded documents may be opened and printed separately from this view. – View Differences lists changes made to the application since the previous submission.
23
Left Navigation Bar – Divided into two sections. Current Activities – Displays a list of activities that may be completed.
24
Select My Home at the top right and return to the Investigator Home Page.
53
Select View. This opens up the application screens. FSA
54
Click Continue to advance to the screen you want. or Click the down Jump To arrow. Select the screen.
55
Upon approval, IRB staff will provide you with clean, unstamped versions of your documents. Documents are uploaded directly into the application under the appropriate questions.
56
These documents are to be used with changes in research. Only one version (clean on top, tracked and previous versions underneath) of each document should be visible.
57
Upon approval, IRB staff will provide you with IRB stamped versions of your documents. Select the Stamped Documents tab. Click on the document name to open. Use these stamped documents with study participants.
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.