1 Geothermal Resources Development and Renewable Energy Strategy in the
Azores Islands (Portugal) João Carlos Nunes* Workshop on Geothermal Resources and Technologies Martinique – June.2015 (*) Azores University Assistant Prof. & INOVA Institute Scientific Director /

2 Mainland G. Silveira et al., 2006 (Journal of Volcanology and Geothermal Research, 156)

3 AZORES GEOTHERMAL PROJECT Main tectonic framework of the
Azores Triple Juntion S. Miguel Island

4 Volcanism in The Azores Archipelago
Fogo Volcano caldera Volcanism in The Azores Archipelago 27 volcanic systems in the Azores (16 being active) and including: - 16 polygenetic volcanoes: - 11 areas of fissural basaltic s.l. volcanism ... and a total of 1,750 monogenetic volcanoes scoria cones domes tuff cones/rings maars...

5 …35 thermal springs at S. Miguel, Terceira, Faial, Graciosa and Flores Islands … traditionally used for balneotherapy

6 1811 – “Banhos da Coroa”, Caldeiras da Rib. Grande (S. Miguel Is.)
Termas do Carapacho (Graciosa)

7 SÃO MIGUEL GEOTHERMAL PROJECT
Volcanology Geothermal Field in explotation Volcanological map of São Miguel (Nunes, 2004)

8 SÃO MIGUEL GEOTHERMAL PROJECT Ribeira Grande Geothermal Field
Two geothermal power plants Ponta Delgada Fogo volcanic complex Ribeira Grande geothermal field Sete Cidades Furnas Nordeste Povoação …a total capacity of 23 MWe is installed

9 SÃO MIGUEL GEOTHERMAL PROJECT Pico Vermelho Pilot Plant
: Surface exploration and exploratory drilling of the Ribeira Grande Geothermal Field : Exploitation of the pilot plant Manufacturer: Mitsubishi Nominal capacity: 3 MW Steam consumption: 56 5,1 bar.a Operating results: 84 GWh in 136 k hours (…no re-injection!) Pico Vermelho power plant was operated for 25 years and served as a valuable training school for the technical staff in the operation and maintenance of the wellfield and generation equipment

10 SÃO MIGUEL GEOTHERMAL PROJECT Pico Vermelho Pilot Plant

11 SÃO MIGUEL GEOTHERMAL PROJECT New Pico Vermelho Plant
( ) One generation unit, binary cycle, air-cooled condensing system 10 MW Geothermal fluid provided by five production wells Re-injection in two geothermal wells (until 2014) AFTER 2015 PV2 PV3 PV4 PV7 PV8 PV5 PV6 Today´s TOTAL installed capacity = 10 MW PV9 PV10 PV11

12 SÃO MIGUEL GEOTHERMAL PROJECT New Pico Vermelho Plant

13 SÃO MIGUEL GEOTHERMAL PROJECT New Pico Vermelho Plant

14 SÃO MIGUEL GEOTHERMAL PROJECT New Pico Vermelho Plant

15 SÃO MIGUEL GEOTHERMAL PROJECT New Pico Vermelho Plant

16 SÃO MIGUEL GEOTHERMAL PROJECT Ribeira Grande Plant
ORC binary system Phase A (1994) Installed capacity 2 x 2,5 MW Geothermal wells CL1 and CL2 Phase A Phase B 2 X 2,5 MW 2 X 4,0 MW Phase B ( ) New installed capacity 2 x 4,0 MW Wells CL1, CL2, CL3, CL5, CL6 and CL7 Re-injection of effluent in well CL4 CL1 CL2 CL3 CL5 CL6 CL7 CL4 Production wells Re-injection well Today´s TOTAL installed capacity = 13 MW

17 SÃO MIGUEL GEOTHERMAL PROJECT Ribeira Grande Plant

18 SÃO MIGUEL GEOTHERMAL PROJECT Ribeira Grande Plant

19 SÃO MIGUEL GEOTHERMAL PROJECT Ribeira Grande Geothermal Field
Extensive single NW-SE elongated geothermal reservoir; Maximum measured temperature: 245ºC; Liquid-dominated field; Fluid moving laterally northwestward; Permeable formations from 700 to 1300 m depth in CL sector and from 450 to 900 m in PV sector; Boundaries are apparently controlled by NW-SE faulting; Sodium-chloride water with TDS of 6-7 g/l; Estimated capacity: 90 MW.

20 SÃO MIGUEL GEOTHERMAL PROJECT Production results
Rib. Grande (13 MW) Pico Verm. (10 MW) in Apr, 20th 2014: renewable energies reached 75% production!

21 SÃO MIGUEL GEOTHERMAL PROJECT Production results
% of S. Miguel Island electrical needs 5,2% Eolian 45,1% Fuel 5,5% Hydro 44,0% Geothermal

22 In the near future: valuing the geothermal fluid in Direct uses
Till now: (marginal) Direct Uses in Azores… e.g. in INOVA Institute greenhouses, till 2005! In the near future: valuing the geothermal fluid in Direct uses Thermal baths Dermocosmetics uses Physico-chemical tests using experimental tanks… …technical and economical feasibility

23 AZORES GEOTHERMAL PROJECT Terceira Island

24 TERCEIRA GEOTHERMAL PROJECT Volcanology
Pico Alto Geothermal Field Volcanologic map of the island of Terceira (Nunes, 2000)

25 TERCEIRA GEOTHERMAL PROJECT Pico Alto Geothermal Field

26 TERCEIRA GEOTHERMAL PROJECT Deep drilling

27 TERCEIRA GEOTHERMAL PROJECT Well testing

28 TERCEIRA GEOTHERMAL PROJECT General Overview
I – Exploration phase Detailed geoelectric survey Environm. studies and permitting Thermo-gradient drilling holes II – Feasibility phase Drilling of 5 evaluation wells Testing of evaluation wells (phase 1) Testing of evaluation wells (phase 2) in April 2014 it was recommended the installation of a pilot power plant of MWe capacity fed by two wells up to 1,800 m deep; All the geothermal fluid will be re-injected in a single well already tested …binary Pilot Power Plant of 3,5 MW to be running by April,2017!

29 Renewable Energies in the Azores Islands
…state-of-art!

30 Electricity Production (2014) …and Geothermal Energy penetration
(789 GWh) ...in S. Miguel Is. (416 GWh) …in Azores The annual geothermal production more than doubled after 2006 increasing from approximately 80 GWh to 170 GWh

31 ELECTRICITY PRODUCTION IN THE AZORES Evolution of primary sources production in ALL ISLANDS…
Adapted from C. Bicudo da Ponte, 2012 (INGENIUM, 64)

32 C. Bicudo da Ponte, 2012 (INGENIUM, 64)
ELECTRICITY PRODUCTION IN THE AZORES Primary sources production in 2011 FOR EACH ISLAND… C. Bicudo da Ponte, 2012 (INGENIUM, 64)

33 ELECTRICITY PRODUCTION IN THE AZORES Azores Government Strategy…
…HORIZON 2020 Strategy

34 ELECTRICITY PRODUCTION IN THE AZORES
Azores Government Strategy …and EDA planning! S. Miguel Island

35 ELECTRICITY PRODUCTION IN THE AZORES
Azores Government Strategy …and EDA planning! Terceira Island Pilot GPP

36 { ELECTRICITY PRODUCTION IN THE AZORES
Azores Government Strategy …and EDA planning! Flores Island “work in progress” (new hydro) {

37 ELECTRICITY PRODUCTION IN THE AZORES
Azores Government Strategy …and EDA planning! THE NEED OF ENERGY STORAGE… e.g. for regulation purposes

38 ELECTRICITY PRODUCTION IN THE AZORES
Azores Government Strategy …and EDA planning! THE NEED OF ENERGY STORAGE… e.g. for regulation purposes …the Furnas Lake Pumping Hydro!

39 …challenges and opportunities of living in oceanic (volcanic) islands
THANK YOU


Download ppt "Geothermal Resources Development and Renewable Energy Strategy in the"