Download presentation
Presentation is loading. Please wait.
Published byLogan Hutchinson Modified over 9 years ago
1
Engineering Design Review for TRD-Readout Chamber
Mechanical Design Bernd Windelband University of Heidelberg
2
TRD and TPC in Space Frame
3
ROC Segmentation in Individual Layers
4
Different Types of ROC‘s
ATRD0901P6 16 different types of ROC‘s from 1080mm x 974mm x 105mm, type L1C0 to 1585mm x 1196mm x 105mm, type L6C1,
5
ROC L6C1 (1585mm x 1196mm)
6
Mechanical Requirements of ROC
to keep wire tension (~90kg) and drift gas overpressure (1mbar) to ensure required flatness of padplane (<200µm) and radiator (<1mm) very rigid structure small radiation length („made out of nothing“) radiator and pad- readout panel have to be sandwich structures
7
ROC Cross Section, View in z
each chamber consists of 48mm radiator 37mm drift volume with wire planes ~20mm backing structure with pad plane main frame with radiator serves as the main support structures to hold the wire tension. pad plane does not see the wire load.
8
ROC Cross Section, View in φ
Pad- Readout panel Voltage Divider Frontplate with Chamber to Chamber Sealing Connection
9
Chamber to Chamber Sealing Connection
Quad-Ring-Seal unit glued to frontplate connection with PEEK tube, di=17mm serves at the same time as chamber to chamber alignment
10
Thickness Determination of the CF-Layers for Pad- Readout Panel and Radiator
20mm core thickness fmax <= 200μm Result: 0.4 mm f = (c3 · p · b4 )/(6 · ED · t · (t + c)2) t = thickness of carbon fibre facing, p = pressure load c = thickness of the core material, ED = Young’s Modulus of the layer, 2a = panel length, 2b = panel width, c3 = correction function (a/b, load case). Radiator, 48mm core thickness fmax <= 1mm Result: 0.1 mm case 1 =clamped case 2 = simply supported
11
Full size Prototype L6C1 Chamber Components – Production and Assembly
Pad- Readout Panel -> INVENTOR (Krakow) -> PI Uni Heidelberg (cutouts, glueing of pad planes) Radiator -> INVENTOR (panels) -> IKP Uni Muenster (assembly) Main frame, wire ledges, etc. -> PI Uni Heidelberg (production and assembly) Three main production steps: glueing main frame to radiator electrical connections and applying the wire planes closing the chamber with pad- readout panel
12
ROC Prototype L6C1, Radiator
13
ROC Prototype L6C1, Test Assembly
14
ROC Prototype L6C1 Main Frame glued to Radiator
15
ROC Prototype L6C1 applying additional layer of glue along the rim
16
Purpose of L6C1 Prototype
Load from wires and drift gas pressure most critical for largest chamber Verify design of largest chamber -> L6C1 behavior of main frame under wire load deformation of pad- read out panel and radiator under overpressure to learn assembly procedure and application of the wire grids test of chamber performance (Harry)
17
Wire Tension Test
18
Wire Tension Test - Detail
19
Measurement of the Deflection
20
Deflection of Chamber Side Profile under Wire Tension
21
ROC Prototype L6C1 voltage divider
22
ROC Prototype L6C1 applying the wire planes
23
Wire Tension on Winding Frame and on ROC
24
Padplane for Prototype
connector side Pad side
25
Prototype on Test Stand
26
Further Results of Tests
Chamber main frame deformes 150 μm under wire tension indicated in TDR -> 10% loss in wire tension. Additional tooling necessary for chamber assembly -> mounting table for chamber frame. -> computer aided measurement sytem Deformation Pad- Readout Panel and Radiator under overpressure within the requirements (talk of Harry and Damian). Large capacitance between Carbon fibre layer close to padplane and padplane -> replacement of this CF-layer by insulating material (glass fibre, Kevlar).
27
Infrastructure for Chamber Production
mounting tool for the chamber main frame and glueing to radiator flat tables vaccumtable (glueing pad plane to pad- readout panel) cleanroom and wire winding machine (to produce and glue the wiregrids to the chamber) milling machine with min. 1,6m machining length (production of chamber main frame parts) computer aided measuring system
28
Mounting Table for ROC
29
New Wire Winding Machine
30
Glass Table and Crane in the New Cleanroom
31
Refurbished Milling Machine
32
Computer Aided Measuring System (Hecht)
-> System will be adapted to our table size and specific needs
33
Next Steps Production of Chamber Stack.
Production of Chamber Mounting Table. Test of Pad- Readout Panels with Kevlar, Kevlar-Tedlar and Glassfibre layer instead of CF. Final Set up of Cleanroom Installation of Measuring System
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.