College of ENGINEERING BRMHS Power Generation Lab Kit Team Wired Up 1 Construction Milestone.

Similar presentations


Presentation on theme: "College of ENGINEERING BRMHS Power Generation Lab Kit Team Wired Up 1 Construction Milestone."— Presentation transcript:

1 College of ENGINEERING BRMHS Power Generation Lab Kit Team Wired Up 1 Construction Milestone

2 Outline Progress Design Changes Issues Budget Projected Work

3 Progress: Power Supply We split Power PCB and Keypad/Data Acquisition PCB Power PCB was made at LSU In the process of transferring circuit from breadboard to PCB

4 Power Supply

5 Progress: INA219/LCD/Keypad Schematic

6 INA219/LCD/Keypad PCB

7 Design Changes: Windbelt Base Cover

8 Design Changes: Hand Crank Front ViewSide View

9 Design Changes: Spin Lever

10 Updated Kit Design

11 Issues INA219 PCB pull up resistor One kit instead of two

12 Budget

13 Projected Work Finish construction of all modules Have all modules fully integrated Have a demo of the completed lab kit for Final Presentation – All experiments provided to BRMHS will be demonstrated