Download presentation
Presentation is loading. Please wait.
Published byJessie Booker Modified over 9 years ago
1
50th Quartermaster General BG Jesse R. Cross
2
Fort Lee Facts Currently the Home of: Combined Arms Support Command (CASCOM) Army Logistics Management College (ALMC) U.S. Army Garrison, Fort Lee U.S. Army Quartermaster Center & School (QMC&S) 49 th Quartermaster Group Defense Commissary Agency HQ Demographics Currently and at end of Fiscal Year 2011 Military Population: 4,612 grows to 5,991 Civilian Employees: 3,407 grows to 4,993 Contractor Employees: 1,132 grows to 1,884 Military Family Members: 10,229 grows to 22,811 Average Student Daily Load: 6,047 grows to 11,061 Total Population: 25,427 46, 740
3
3 Ordnance Munitions & Electronic Maintenance School Redstone Arsenal, AL Transportation Center & School Fort Eustis, VA Ordnance Center & Mechanical Maintenance School Aberdeen Proving Ground, MD Defense Commissary Agency San Antonio, TX; Hopewell, VA; & Virginia Beach, VA BRAC Moves Air Force & Navy Culinary Schools Great Lakes, IL Lackland AFB, TX Air Force Transportation Management School Lackland AFB, TX UNCLASSIFIED Defense Contract Management Agency Alexandria, VA SCoE
4
CASCOM The Sustainment Center of Excellence Technical Logistics College Army Logistics Mgt College Logistics NCOA Logistics Leadership College Army Logistics University DCG/Cmdt (Individual Tng) DCG/Cmdt (Collective Tng) Transportation School Training Departments Proponency Museum Commander Chief of Staff Special Staff DCG RC Mob & Tng DCG SSI Cdr Financial Management School Adjutant General School Recruiting & Retention School NCOA AIT Brigade Training Departments Proponency Museums Joint Culinary Center of Excellence School of Music Student Bn Civ Log Career Mgmt Office CGSC- ILE Satellite DL2/QAKnowledge Management ESD/TCM Sustainment C2 Quartermaster School Proponency Museum Training Departments AIT Brigade Ordnance School OEMTD, Gordon 94M/94S, Sill EOD, Eglin AFB Capabilities Dev & Integration Training Dev & Integration DCG/Cmdt (CDI) Center Level Functions Original MOS Producing Schools Change Joint CoE for Trans Mgt Training CSMSMWO As of 14 Nov 08 Museum AL&T Joint Mortuary Affairs Center
5
5 Sustainment Center of Excellence Headquarters $49.7 Million contract awarded in JUN 07; 220,033 SF Construction started: 02 JUL 07 Current Completion Date: 30 DEC 08 Ready to Occupy Date: 30 MAR 09
6
6 “HOME OF ORDNANCE” Aerial Site Infrastructure Temple Ave Highway 36 Fort Lee Barracks Complex TSED Site DFAC Site Central Campus Site Site Infrastructure (Flyover Bridge, Roads, Utilities, etc.) Nov 07 – Nov 09 As of 12 Jun 08
7
7 Army Logistics University Campus Education Building Simulation Building $110.8 Million contract awarded in JUN 07; 397,387 SF Construction started: 02 JUL 07 Current Completion Date: 22 APR 09 Ready to Occupy Date: 22 JUL 09 Education Building – 4 Story Simulation Building – 3 Story
8
QUESTIONS
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.