11/15/20041 Bandwidth Scheduling and Provisioning in Access and Wide Area Networks Bin Wang Department of Computer Science and Engineering Wright State University Dayton, OH 45435
2
11/15/20042 Outline Bandwidth scheduling in Ethernet Passive Optical Network (EPON) Sliding scheduled traffic model Bandwidth scheduling over a point-to-point WDM link Bandwidth provisioning in WDM networks Look-ahead scheduling of a set of demands Dynamic scheduling of a demand Summary
3
11/15/20043 Access Network - Passive Optical Networks A single fiber is used to support multiple customers – 20km No active equipment in the path highly reliable Optical line terminal (OLT) in central office, which connected to the rest of the Internet Optical network unit (ONU) on customer premises Both upstream and downstream traffic on ONE fiber (1490nm down, 1310nm up) EPON: Ethernet based PON draft designed by IEEE 802.3ah 1000 Mbps downstream and 1000 Mbps upstream Rest of Internet
4
11/15/20044 PON Topologies
5
11/15/20045 Why PON? Reduced OpEx: passive network High reliability Reduced power expenses Shorter installation times Reduced CapEx: 16-128 customers per fiber 1 Fiber + N transceivers Scalable CO equipment shared new customers can be added easily as the network grows Bandwidth is shared existing customer bandwidth can be changed on demand
6
11/15/20046 Downstream Traffic - Broadcast
7
11/15/20047 Upstream Traffic -Shared
8
11/15/20048 Bandwidth Scheduling - Upstream TDMA – a frame consists of N time slots N ONUs Each ONU is assigned a dedicated time slot Traffic arriving to ONU is buffered till correct time slot for this ONU arrives Traffic will be sent at full link speed upstream
9
11/15/20049 Pros and Cons Pros simple Dedicated bandwidth Cons Fixed frame (N time slots) Potential long delay No statistical sharing – low utilization Loss due to buffer overflow; using a larger buffer increases delay
10
11/15/200410 Dynamic Polling-based Bandwidth Scheduling Use OLT polling ONUs to deliver data encapsulated in Ethernet frames from ONUs to OLT To avoid walk times associated with polling (due to large RTT), polling requests and data transmission need to be properly scheduled Interleaved polling with adaptive transmission cycle time
11
11/15/200411 Dynamic Polling-based Bandwidth Scheduling OLT maintains polling table # of bytes in ONU’s buffer requested transmission window RTT to each ONU OLT issue Grant message to ONU Granted transmission window ONU transmits up to the granted transmission window At the end of transmission, ONU issues a Request to OLT # of bytes in ONU’s buffer grant request
12
11/15/200412 Dynamic Polling-based Bandwidth Scheduling OLT properly times the sending of next Grant message to ONU BEFORE receiving transmission from ONU, given RTT to ONUs Transmission window of previous Grant Guard time needed Such that The next transmission from ONU is received by OLT right AFTER the receipt of the last bit of previous ONU transmission grant
13
11/15/200413 Dynamic Polling-based Bandwidth Scheduling Upon receipt of transmission from ONU, OLT Updates RTT to ONU Updates # of bytes requested
14
11/15/200414 Dynamic Polling-based Bandwidth Scheduling The next transmission from ONU is received by OLT is right AFTER the receipt of the last bit of previous ONU transmission + some guard time
15
11/15/200415 Maximum Transmission Window Size (W i max ) Fixed: based on SLA for each ONU Dynamic: based network conditions W i max determines guaranteed bandwidth available to ONU-i max polling cycle Large cycle increased delay for all packets Small cycle more bandwidth wasted by guard time polling cycle is variable depending on requested window sizes or network traffic condition excessive bandwidth distributed to highly loaded ONUs
16
11/15/200416 Maximum Transmission Window Size (W i max ) Fixed service Ignore the requested window size and always grants the max window TDMA Limited service Grants the requested # of bytes, but no more than W max Constant credit Add a constant credit to the requested window size Granted window size = requested window size + x Reduce average delay Linear credit Granted window size = requested window size + credit Size of credit proportional to the requested window Longer burst in last cycle is likely to continue in the next cycle
17
11/15/200417 Other Scheduling Algorithms for EPON Differentiated services QoS for multiple classes of services (voice, data, video, etc)
18
11/15/200418 Traffic Models Following traffic models in open literature: static traffic model all demands are known in advance and do not change over time dynamic random traffic model a demand is assumed to arrive at a random time and last for a random amount of time admissible set model demands are from some prescribed traffic matrices incremental traffic model demands arrive sequentially. Once the demand is accommodated, the demand remains in the network indefinitely
19
11/15/200419 Motivation Many US DOE large-scale science applications must deliver Gbps throughput at scheduled time durations These applications require provisioning of scheduled dedicated channels or bandwidth pipes at a specific time with certain duration Bandwidth leasing market Customers need bandwidth only for a limited period of time Limited-time leasing of bandwidth possible in the future These scheduled capacity demands are dynamic demands only last during the specified intervals they are not entirely random
20
11/15/200420 New -- Sliding Scheduled Traffic Model A demand (s, d, n, ℓ, r, ) s: source d: destination (or a destination set) n: capacity requirement : duration, or lasting time [ℓ, r]: time window during which demand of duration must be satisfied Example: (s, d, 1, 10:00, 13:00, 60 minutes) l r
21
11/15/200421 Bandwidth scheduling over a point-to-point WDM link under sliding scheduled traffic model
22
11/15/200422 Problem Settings A single fiber link with W wavelengths Time is slotted with T time slots over a day: 0, 1, …, T-1 Demands require lightpaths periodically repeated every day denoted by (a, b, L) – a discrete version of sliding scheduled model starts in [a, b] and lasts L time slots (L<T) demand satisfied in [a, b+L] time flexibility defined as |[a,b]|-1 Lightpath service (w, s, L): wavelength w is used for a duration of L time slots start from s per day (L<T)
23
11/15/200423 Problem definition Given a batch of lightpath demands, assign them lightpath services so that at any time there is at most one lightpath service per wavelength W=2; T=8; Demands = (4,6,4) (3,3,2) (7,1,3) (1,3,4)
24
11/15/200424 Traffic Constraint for Schedulability Conditions Virtual Packet (VP) model treat a demand (a, b, L) as a virtual packet that “arrives” at a and has a “transmission duration” or (work) of L (σ, ρ): ρ is a measure of the average traffic (demand) rate, and σ is a measure of the traffic (demand) burstiness ρ ≤ W A(t): work of virtual packets that arrive at time t (σ, ρ) constrained traffic, total work in [x, y]
25
11/15/200425 Theorem 1: Schedulability Condition when no lightpath wraps around at the end of [0, T-1] Suppose the batch of lightpath requests are (σ, ρ) constrained, L max is the max lasting time, and let: And A(t) = 0 for all (i.e., there is no virtual packet arrival in the last time slots) Then there is an assignment for the lightpath requests if their time flexibility is at least f
26
11/15/200426 Theorem 2: General Schedulability Condition Suppose the batch of lightpath requests are (σ, ρ) constrained, and Let Then there is an assignment for the lightpath request if their time flexibility is at least f
27
11/15/200427 Heuristic Scheduling Algorithms First Come First Serve (FCFS) Lowest valued wavelengths are used first Demands with earlier arrival times are scheduled first, ties are broken randomly Earliest Deadline First (EDF) Lowest valued wavelengths are used first Demands with the earliest deadline, b+L, is scheduled first b+L is the last possible time slot for the end of the lightpath Both schemes tend to assign lightpaths close to time 0 which creates peak bandwidth demand at time 0
28
11/15/200428 Heuristic Scheduling Algorithms Lowest wavelength, maximum duration (LWMD) Wavelengths are filled with lightpath requests one wavelength at a time starting from wavelength 0 When filling wavelength k, demands that have longer durations are scheduled first, ties broken randomly (a, b, L): start times are considered in the start interval [a, b] beginning with a
29
11/15/200429 Heuristic Scheduling Algorithms Lowest wavelength, Fixed (LWFixed) Wavelengths are filled with lightpath requests one wavelength at a time starting from wavelength 0 Wavelength k is filled starting from time = 0 Choose the longest unassigned request (a, b, L) that could start at time t and assign it starting from t Continue to fill the wavelength from t+L If no such request, then continue filling the wavelength from time t+1 May create peak bandwidth demand at time 0
30
11/15/200430 Heuristic Scheduling Algorithms Lowest wavelength, Continuous (LWCont) Wavelengths are filled with lightpath requests one wavelength at a time starting from wavelength 0 Wavelength k >0 is filled by starting at a time t that depends on how wavelength k-1 was filled If wavelength k-1’s last request was assigned time slots [x,y], then wavelength k is filled starting from y+1
31
11/15/200431 Simulation Call blocking rate Ratio of # of calls blocked over # of calls Traffic blocking rate Ratio of the work of blocked lightpath requests over the work of all lightpath requests Scenarios: request duration evenly distributed in [1,31] expected duration of lightpaths = 16 Earliest start time for a demand randomly distributed Blocking scenario W=30,T=64, 114 requests Nonblocking scenario W not limited, T=64, 128 requests
32
11/15/200432 Blocking scenario - call FCFS, EDF high blocking rates LWCont has about the lowest blocking rates over all flexibility times Blocking rates decreases as time flexibility increases
33
11/15/200433 Blocking scenario - traffic FCFS, EDF high blocking rates LWCont has about the lowest blocking rates over all flexibility times Blocking rates decreases as time flexibility increases
34
11/15/200434 Nonblocking scenario Minimal # of wavelengths needed so that there is no blocking (C min =, a lower bound on the # of wavelengths needed, M is work of the lightpath requests
35
11/15/200435 Result Summary Functions of the time flexibility f FCFS and EDF have high blocking rates LWCont has about the lowest blocking rates over all flexibility times Blocking rates decreases as time flexibility increases except for LWFixed when the time flexibility is around 32 LWMD and LWCont require minimal number of wavelengths LWCont performs the best
36
11/15/200436 Summary of Scheduling in P2P Link Scheduling over a single WDM link under a flexible traffic model Assigning periodic lightpath services which allow some time flexibility Schedulability conditions for a set of demands Heuristic scheduling algorithms
37
11/15/200437 Bandwidth provisioning in WDM networks Look-ahead scheduling of a set of demands with sub-wavelength capacity under sliding scheduled traffic model
38
11/15/200438 Space-Time Traffic Grooming Problem Given a set of sliding scheduled traffic demands M, properly place demands within their time windows, route and groom (by finding a route and assigning a proper wavelength to each demand in M) such that non-blocking case network has enough resources to accommodate all the demands in M to meet their specifications (i.e., capacity and schedule requirements) goal is to minimize total network resources used
39
11/15/200439 Space-Time Traffic Grooming Problem blocking case network does not have enough resources to accommodate all the demands as specified goal is to minimize the number of demands to be rearranged (i.e., to minimize the subset of demands that may have their starting time changed in order to have all the demands in the set M accommodated to minimize of total network resources used demand priority can also be considered if necessary
40
11/15/200440 Time Conflict & Resource Conflicts Temporal conflicts: Time conflicts of a set of scheduled demands M Demands may overlap in time Demands that are disjoint in time allow resource reuse Spatial conflicts: Resource conflicts Routes of demands may overlap If not enough resources are available, conflicts result Some demands may not be schedulable because of lack of resources
41
11/15/200441 Interval Graph Modeling of Time Conflict Reduction 8 5 32 3 010 3 28 211 6 912 18 Tight node: 2 x 8 > 10 Strong edge Weak Edge Loose node: 2 x 5 < 25
42
11/15/200442 Lemma: no strong edge connects two loose nodes. Theorem: let v be a loose node, A(v) be the set of nodes connected to v with strong edges, then all nodes in A(v) are tight nodes and are connected by strong edges pair wise.
43
11/15/200443 Time Conflict Reduction Algorithm Use an interval graph to model time conflicts among scheduled demands Identify time conflicts that can be avoided Remove time conflicts in a greedy manner to obtain proper placement of demand intervals within their allowed time windows
44
11/15/200444 Time Conflict Reduction Algorithm
45
11/15/200445 Performance of Time Conflict Reduction Algorithm Demand length 10-90% of time window size Weak time correlation among demands
46
11/15/200446 Performance of Time Conflict Reduction Algorithm Demand length 10-90% of time window size Medium time correlation among demands
47
11/15/200447 Performance of Time Conflict Reduction Algorithm Demand length 10-90% of time window size Strong time correlation among demands
48
11/15/200448 Performance of Time Conflict Reduction Algorithm Demand length 10-100% of time window size Demand length 10-100% of time window size Different time correlation among demands
49
11/15/200449 Time Window Based Routing and Grooming Algorithm Divide a set of scheduled demands into subsets called time windows Demands in a time window have time conflicts pair wise Schedule demands in a time window according to demands’ decreasing resource requirements Using a modified Dijkstra’s algorithm on a wavelength layered graph If a demand is blocked due to unavailability of resources, rearrange the schedule of the demand Schedule the demand earlier or later in time when the required resources are available
50
11/15/200450 Demand Set Division Time Time Window 3Time Window 2Time Window 1 r1r1 r2r2 r3r3 r4r4 r5r5 r6r6 r7r7
51
11/15/200451 Time Window Based Grooming Algorithm D S : set of straddling demands TW i : set of demands in a time window i D R : set of demands need to be rearranged Space Time RWA Algorithm (G, M) run Time Window Division Algorithm (M); run Greedy Time Window Grooming Algorithm (G, D S ); run Greedy Time Window Grooming Algorithm (G, TW i ) for all TW i ; if (D R not empty), run Rearrange RWA Algorithm (D R );
52
11/15/200452 Performance Evaluation Time correlation of a demand set after time conflict reduction characterize the extent of conflicts among demands in the time domain weak, medium, strong Demand sets contain 50-400 scheduled bidirectional demands 30 wavelengths per link
53
11/15/200453 6 1 0 2 3 4 5 7 10 8 9 13 12 11 222 292 75 80 89 124 63 102 72 70 65 209 162 61 74 101 140 151 83 189 132 NSFNET
54
11/15/200454 Traffic Grooming: Results - I Grooming factor g varies from 4 to 32 Given a grooming factor g, capacity units of a demand drawn from [1, 2], [1, 4], …, [1, g] Metric: Total # of wavelength-links and max # of wavelengths used on a link increase when # of demands increases when average demand capacity increases Grooming is more effective when average demand capacity is smaller relative to grooming factor Stronger time correlation negatively impacts effectiveness of grooming
55
11/15/200455 Traffic Grooming: Results - II When grooming factor g increases, the amount of resources used decreases and levels off when g becomes large The decrease in resources used is more significant when the demand time correlation is stronger
56
11/15/200456 Total number of wavelength-links vs number of demands, weak correlation Grooming factor g = 16 Given a grooming factor g, capacity units of a demand drawn from [1, 2], [1, 4], …, [1, g] Total # of wavelength- links used increase when # of demands increases when average demand capacity increases
57
11/15/200457 Total number of wavelength-links vs number of demands, medium correlation Grooming factor g = 16 Given a grooming factor g, capacity units of a demand drawn from [1, 2], [1, 4], …, [1, g] Total # of wavelength- links used increase when # of demands increases when average demand capacity increases
58
11/15/200458 Total number of wavelength-links vs number of demands, strong correlation Grooming factor g = 16 Given a grooming factor g, capacity units of a demand drawn from [1, 2], [1, 4], …, [1, g] Total # of wavelength- links used increase when # of demands increases when average demand capacity increases
59
11/15/200459 Max number of wavelengths vs number of demands, weak correlation Grooming factor g = 16 Given a grooming factor g, capacity units of a demand drawn from [1, 2], [1, 4], …, [1, g] Max # of wavelengths used on a link increase when # of demands increases when average demand capacity increases
60
11/15/200460 Max number of wavelengths vs number of demands, medium correlation Grooming factor g = 16 Given a grooming factor g, capacity units of a demand drawn from [1, 2], [1, 4], …, [1, g] Max # of wavelengths used on a link increase when # of demands increases when average demand capacity increases
61
11/15/200461 Max number of wavelengths vs number of demands, strong correlation Grooming factor g = 16 Given a grooming factor g, capacity units of a demand drawn from [1, 2], [1, 4], …, [1, g] Max # of wavelengths used on a link increase when # of demands increases when average demand capacity increases
62
11/15/200462 Total number of wavelength-links vs Grooming factor # of demands = 350 Grooming factor g= 1, 4, 8,... 32 Total # of wavelength- links used decrease when grooming factor g increases levels off when g becomes large The decrease in resources used is more significant when the demand time correlation is stronger
63
11/15/200463 Max number of wavelengths vs Grooming factor # of demands = 350 Grooming factor g= 1, 4,.. 32 Max # of wavelengths used on a link decrease when grooming factor g increases levels off when g becomes large The decrease in resources used is more significant when the demand time correlation is stronger
64
11/15/200464 Dynamic scheduling of a demand under the sliding scheduled traffic model
65
11/15/200465 Problem Given a demand (s, d, n, ℓ, r, ), find a route that has at least n units of bandwidth in a time interval of length at least in [ℓ, r]
66
11/15/200466 Dynamic Scheduling Algorithm Divide time into time slots Consider time intervals of length in [ℓ, r] starting from ℓ: [ℓ, ℓ+ ], [ℓ+1, ℓ+ +1], [ℓ+2, ℓ+ +2], … Within a time interval, find a shortest path with at least n units of bandwidth given current network resource state info h-hop optimal routing algorithm: A modified Bellman-Ford algorithm Find the maximum available bandwidth path with at most h hops If such a path is not found, try next time interval
67
11/15/200467 Summary Bandwidth scheduling in EPON Sliding scheduled traffic model Bandwidth scheduling over a point-to-point WDM link Bandwidth provisioning in WDM networks Look-ahead scheduling of a set of demands Dynamic scheduling of a demand