Download presentation
Presentation is loading. Please wait.
Published byBeverly Reeves Modified over 9 years ago
1
LT-V: controlling a pressure control valve Presentation of the LT-V Data Logger (March 2014) # 1
2
LT-V: controlling a pressure control valve LT-V Applications Valve opening / closing Isolate sub-networks to control water circulation Precise measurement of nighttime flow More precise leak detection … Pressure variation Reduce leaks Normal pressure during the day / reduced at night Output objective (> 85%) Increase network longevity Reduce excess pressure at night
3
LT-V: controlling a pressure control valve LT-V = LT + 1 solenoid output Specific product: LT + 1 Latch solenoid output expansion card, 3 wires, 12 V Compatible solenoid: Bermad S-985-3W (model compatible with many different models of valve). Path 1 Path 3 Path 2: Shared LT-V
4
LT-V: controlling a pressure control valve The hydraulic cabling determines the behaviour of the valve Opening / closing Transfer between two pressure levels pre-set by the operator Opening / closing Operating modes Solenoid Transfer Day pressure / Night pressure Solenoid Day pressure Night Pressure Closure of the valve
5
LT-V: controlling a pressure control valve Timed One time slot per day Each day, the solenoid switches: from path 1 to path 3 at xx:xx (day) from path 3 to path 1 at xx:xx (night) Remote control by WEB LS On flow The solenoid switches when the flow threshold is exceeded Configuration of a threshold for average flow Requires a meter or flow meter Remote control by WEB LS Timed and flow Control according to time slot and flow Overrides timed control if flow is higher than configured threshold (e.g.: intervention of fire brigade at night) Remote control by WEB LS Control modes
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.