SITE REMEDIATION ISSUES IN RELATION TO NORM INDUSTRIES IN MALAYSIA M. OMAR MALAYSIAN NUCLEAR AGENCY.

Similar presentations


Presentation on theme: "SITE REMEDIATION ISSUES IN RELATION TO NORM INDUSTRIES IN MALAYSIA M. OMAR MALAYSIAN NUCLEAR AGENCY."— Presentation transcript:

1 SITE REMEDIATION ISSUES IN RELATION TO NORM INDUSTRIES IN MALAYSIA M. OMAR MALAYSIAN NUCLEAR AGENCY

2 NORM INDUSTRIES TIN MINING TIN TAILINGS UPGRADING PLANTS RARE EARTH EXTRACTION ILMENITE CRACKING TIN SMELTING

3 TIN MINING OLD INDUSTRY PRODUCING – TIN ORE CONCENTRATES (PRODUCT) – TIN TAILINGS (BY-PRODUCT) – MINE SAND NO. OF OPERATIONAL MINES DECREASING MINE-OUT SITES SOME SITES HAVE BEEN DEVELOPED

4 TIN TAILING UPGRADING PRODUCING – TIN ORE CONCENTRATES (PRODUCT) – MIXED MINERAL OR INDIVIDUAL MINERAL SUCH AS MONAZITE, ZIRCON, XENOTIME, ILMENITE AND OTHERS (BY-PRODUCT) – THESE MINERALS ARE CATEGORISED AS RADIOACTIVE NO. OPERATIONAL PLANTS DECREASING PROPERLY CLOSED?

5 TIN MINING & TIN TAILINGS INDUSTRIES MAINLY INVOLVING PHYSICAL SEPARATION PROCESSES PRODUCING LARGE VOLUME OF BY-PRODUCTS BY-PRODUCTS – SALEABLE – PRICES VARY – IN STABLE PHYSICAL FORM – CONTAIN A FEW BQ/G OF NATURALLY OCCURRING RADIONUCLIDES – POTENTIAL TO BE LEFT OUT ON-SITE WHEN OPERATION CLOSED CLOSED SITES NEED ASSESSMENT AND MAY NEED TO BE REMEDIATED

6 RARE EARTH EXTRACTION CHEMICAL CRACKING OF MONAZITE AND XENOTIME PRODUCING – RARE EARTH PRODUCTS – RESIDUES CONTAINING THORIUM HYDROXIDE OPERATION TERMINATED IN 1992 PLANT DECOMMISSIONING CARRIED OUT PLANT SITE HAD BEEN CLEANED-UP – REMOVING CONTAMINATED SOIL AND BACKFILLING WITH SOIL FROM OTHER SITES THE SITE WAS CLEARED BY AUTHORITY FOR INDUSTRIAL USE

7 ILMENITE PROCESSING PROCESSES INVOLVING ACIDS & OTHER CHEMICALS PRODUCING – SYNTHETIC RUTILE – TITANIUM DIOXIDE PIGMENT – IRON OXIDE RESIDUES – GYPSUM RESIDUES IRON OXIDE CONTAINS A FEW BQ/G OF NATURALLY OCCURRING RADIONUCLIDES GYPSUM CONTAINS LOW CONCENTRATION OF NORM

8 ILMENITE PROCESSING LARGE VOLUMES OF RESIDUES RESIDUES STORED ONSITE REQUIRE SOLUTIONS – REUTILISATION OF RESIDUES – LANDFILL MATERIAL? CHEMICAL HAZARD? STILL UNDER CONTROL THE NEED TO REMEDIATE THE SITE MAY ARISE LATER

9 TIN SMELTING OLD INDUSTRY SMELTING OF TIN ORE PRODUCING – TIN METAL – TIN SLAG RESIDUES

10 TIN SLAG LARGE VOLUME, STORED ONSITE CONTAIN A FEW BQ/G OF NATURALLY OCCURING RADIONUCLIDES USED FOR LANDFILL IN THE PAST CONTAINS TANTALUM – SALEABLE, PRICES VARY

11 LESSON LEARNED BUDGET SHOULD BE ALLOCATED FROM THE BEGINNING OF A NEW PLANT OR OPERATION FOR: – R&D ON THE REUTILISATION OF RESIDUES – PLANT DECOMMISSIONING – SITE REMEDIATION – WASTE DISPOSAL

12 CONCLUSIONS REMEDIATION ISSUES MAY ARISE NEEDED – GUIDELINES – TRAINING – NETWORKING

13 THANK YOU