Presentation is loading. Please wait.

Presentation is loading. Please wait.

The ATM and ASAS challenges ahead Fred Abbink NLR General Director ASAS-TN2 workshop, 23-25 April 2007, NLR, Amsterdam, The Netherlands.

Similar presentations


Presentation on theme: "The ATM and ASAS challenges ahead Fred Abbink NLR General Director ASAS-TN2 workshop, 23-25 April 2007, NLR, Amsterdam, The Netherlands."— Presentation transcript:

1 The ATM and ASAS challenges ahead Fred Abbink NLR General Director ASAS-TN2 workshop, 23-25 April 2007, NLR, Amsterdam, The Netherlands

2 2 NLR locations The Netherlands N L R - A m s t e r d a m N L R - F l e v o l a n d

3 ASAS-TN2 workshop, 23-25 April 2007, NLR, Amsterdam, The Netherlands3 NLR’s support of the NL Government For the departements: - Defense: support for acquisition (“smart buyer/specifier”), and for operations, environment and safety - Transport: Mainport Schiphol (safety, capacity, environment), Air Traffic Management; space - Economics: civil/military aircraft development (NH90, F-35, GLARE, support of SMEs) - Interior, Foreign Affairs: Homeland Security, international support - Education;knowledge infrastructure, Universities, Technical colleges

4 ASAS-TN2 workshop, 23-25 April 2007, NLR, Amsterdam, The Netherlands4 Financial information Income in 2006 in Euros: 75,5 million  Governmental grant :  Contracts: 20,0 million (26%) 55,5 million (74%) Sectors  C ivil aviation:  Military aviation:  Space:  Civil and Military aircraft- development: 15,0 million (20%) 20,5 million (27%) 6,0 million ( 8%) 34,0 million (45%)

5 ASAS-TN2 workshop, 23-25 April 2007, NLR, Amsterdam, The Netherlands5 Board of Directors Marketing & Strategy Other Staff & Supporting Services Personnel & Organisation Gas Turbines & Structural Integrity Flight Physics & Loads Helicopters & Aeroacoustics Collaborative Engineering Systems Structures Technology Engineering & Technical Services Structures Testing & Evaluation Avionics Development & Qualification Flight Test Systems & Applications Avionics Systems Military Operations Research Space Air Transport Safety Institute Air Traffic Management & Airports Air Transport Systems Technology Training, Human Factors & Cockpit Ops Environment & Policy Support Aerospace Vehicles Aerospace Systems & Applications Air Transport Workforce and organisational structure Workforce: over 700 employees, 47% university-trained and 23% with a higher professional qualification

6 ASAS-TN2 workshop, 23-25 April 2007, NLR, Amsterdam, The Netherlands6 Government + other clients (KLM, LVNL [air traffic control], Schiphol, Ministry of Defence) Industry, SMEs, Armed Forces Human factors in flight simulation Flight testing Avionics systems Lifespan monitoring and design Platform technology and Flight Physics Composites and construction technology Testing and evaluation of constructions Operations Research Space Environmental and policy support Air Traffic Management and airports Air traffic safety Competences and markets

7 ASAS-TN2 workshop, 23-25 April 2007, NLR, Amsterdam, The Netherlands7 Research and Test facilities Wind tunnels: - high- and low-speed (shared with DNW) - Cryogenic transonic (7% in ETW) Research Flight Simulators Air traffic control and tower research simulators Research aircraft Avionics development and test facilities Remotes sensing and space technology facilities Computer network

8 ASAS-TN2 workshop, 23-25 April 2007, NLR, Amsterdam, The Netherlands8 Aerodynamics and Structures Research Facilities

9 ASAS-TN2 workshop, 23-25 April 2007, NLR, Amsterdam, The Netherlands9 NLR ground and airborne networked ATM and Flight simulation research facilities

10 ASAS-TN2 workshop, 23-25 April 2007, NLR, Amsterdam, The Netherlands10 Source: Boeing CMO 2003 Air Transport is growing 3 X

11 ASAS-TN2 workshop, 23-25 April 2007, NLR, Amsterdam, The Netherlands11

12 ASAS-TN2 workshop, 23-25 April 2007, NLR, Amsterdam, The Netherlands12 From “single-aircraft ATM” to “Convoy ATM” by introducing ASAS VHF Voice Radar (PR & SSR) VHF Voice ASAS Radar (PR & SSR)

13 ASAS-TN2 workshop, 23-25 April 2007, NLR, Amsterdam, The Netherlands13 Single European Sky & SESAR Master Plan 2005201020152020 2005201020152020 Deployment Foundation 2007 Deployment Applied R&D Industrialisation SES Deployment 2012 Deployment Innovative R&D Applied R&D Industrialisation Collaborative – High Performance 2017 2005201020152020 2005201020152020 Deployment Foundation 2007 Applied R&D Industrialisation 2012 Deployment SES Deployment 2005201020152020 2005201020152020 Deployment Foundation 2007 Applied R&D Industrialisation 2012 2017 Deployment SES Deployment 2005201020152020 2005201020152020 Deployment Foundation 2007 Applied R&D Industrialisation 2012 Deployment Innovative R&D Applied R&D Industrialisation 2017 Deployment SES Deployment 2005201020152020 2005201020152020 Deployment Foundation 2007 Applied R&D Industrialisation 2012 Collaborative – High Performance Deployment Innovative R&D Applied R&D Industrialisation 2017 Deployment SES Deployment 2005201020152020 2005201020152020 Deployment Industrialisation Foundation 2007 Applied R&D Industrialisation 2012 Deployment Time Frame Research Time Frame

14 ASAS-TN2 workshop, 23-25 April 2007, NLR, Amsterdam, The Netherlands14 Many options for future ATM concepts Drivers ATM research: l Growth l Safety l Environment l New technology

15 ASAS-TN2 workshop, 23-25 April 2007, NLR, Amsterdam, The Netherlands15 Many challenging areas for study & development Capaciteit ADS-B, Data Link, ASAS Security ATM Policy support Ground surveillance Wake vortices Safety Navigation Environment

16 ASAS-TN2 workshop, 23-25 April 2007, NLR, Amsterdam, The Netherlands16 Many EU projects on these areas (showing NLR involvement) ASSTAR MA-AFAS AFAS MFF ANASTASIA INTENT 3FMS C-ATM EMMAEMMA2SPADE2 OPTIMAL SAFEE FLYSAFE ISAWARE ISAWARE2 ASICBA ATC WAKE I-WAKE PATIN EPISODE 3 G2G SPADE Capaciteit ADS-B, Data Link, ASAS Security ATM Policy support Ground surveillance Wake vortices Safety Navi- gation SOURDINE SOURDINE II APPROVE Environment

17 ASAS-TN2 workshop, 23-25 April 2007, NLR, Amsterdam, The Netherlands17 sharing testing facilities: DLR/DNW & ETW Increasing effectivity and efficiency by international co-operation institutional co-operation: EREA sharing research and development: GARTEUR, NATO, NASA, EU information exchange: RTO, ICAS, AIAA, CEAS, IAF other co-operative ventures: EASA, EUROCONTROL, ESA, FAA strategic alliances: DLR/ATM-AT One EDA,

18 ASAS-TN2 workshop, 23-25 April 2007, NLR, Amsterdam, The Netherlands18 Conclusion NLR is active and has large experience in many of the challenging ATM areas, especially 4D Planning and ASAS NLR owns a large set of ATM research facilities for ground, airborne and air-ground integrated ATM research: - Full Flight Simulator (GRACE) - ATC Simulator (NARSIM RADAR) - Tower Simulator (NARSIM TOWER) - Research Aircraft - (all networked) NLR, your partner in ATM and ASAS research, test & development

19 ASAS-TN2 workshop, 23-25 April 2007, NLR, Amsterdam, The Netherlands19 Conclusion Enjoy - The Netherlands - Amsterdam - The ASAS-TN2 workshop at NLR

20 ASAS-TN2 workshop, 23-25 April 2007, NLR, Amsterdam, The Netherlands20


Download ppt "The ATM and ASAS challenges ahead Fred Abbink NLR General Director ASAS-TN2 workshop, 23-25 April 2007, NLR, Amsterdam, The Netherlands."

Similar presentations


Ads by Google