Presentation is loading. Please wait.

Presentation is loading. Please wait.

All content in this presentation is protected – © 2008 American Power Conversion Corporation Rael Haiboullin System Engineer Capacity Manager.

Similar presentations


Presentation on theme: "All content in this presentation is protected – © 2008 American Power Conversion Corporation Rael Haiboullin System Engineer Capacity Manager."— Presentation transcript:

1 All content in this presentation is protected – © 2008 American Power Conversion Corporation Rael Haiboullin System Engineer Capacity Manager

2 APC by Schneider Electric– Capacity Manager – June 2008 Capacity Manager Planning and optimizing utilization of actual power, cooling and rack capacities via shared data center model, enabling efficient equipment provisioning and right-sizing of your data center Balance IT Demand with Physical Infrastructure Capabilities

3 APC by Schneider Electric– Capacity Manager – June 2008 Capacity Manager Applications ●Data Center Management Application Enables planning and optimization of… Cooling Capacity Power Capacity Rack Space Floor Space InfraStruXure Solutions/Data Centers with up to 200 Racks Requirements: InfraStruXure Central Metered or Switched Rack PDUs in Each Rack Optional: APC InRow TM Cooling for Optimal Utilization

4 APC by Schneider Electric– Capacity Manager – June 2008 Capacity Manager Product Design Benefits Measured power data Enable efficient physical infrastructure use through visibility to average & peak power consumption InRow airflow analysis Locate new devices without overheating new or existing equipment by simulating changes in; supply temperature, airflow and number of cooling units Available capacity Understand available capacity by calculating actual space, power and cooling consumption against data center architecture constraints Physical equipment planning Quickly locate the optimum spot for that next server based on space, cooling and power needs Design analysis Model the effects of and compare alternative layouts through detailed design analysis Capacity policies Specify architecture capabilities to; match IT equipment with availability needs ad avoid stranded space, power and cooling capacity Common data model Ensure mature and synchronized data throughout the entire data center life cycle

5 APC by Schneider Electric– Capacity Manager – June 2008 Rack equipment provisioning Create work orders and automatically generate tasks to move, add or change IT equipment Rack equipment provisioning Create work orders and automatically generate tasks to move, add or change IT equipment Space reservation Reserve power, cooling and rack space for new equipment to be installed quickly and easily Space reservation Reserve power, cooling and rack space for new equipment to be installed quickly and easily Rack front view Easy to use rack front view enables accurate and detailed representation of equipment location Rack front view Easy to use rack front view enables accurate and detailed representation of equipment location

6 All content in this presentation is protected – © 2008 American Power Conversion Corporation Capacity policies Specify architecture capabilities to; match IT equipment with availability needs and avoid stranded space, power and cooling capacity Capacity policies Specify architecture capabilities to; match IT equipment with availability needs and avoid stranded space, power and cooling capacity Generic UPS support Allows for modeling data from any UPS vendor, providing support for brown-field environments Generic UPS support Allows for modeling data from any UPS vendor, providing support for brown-field environments Electrical room support Allows for rooms outside the data center floor, in order to include centralized power equipment in the capacity and change planning Electrical room support Allows for rooms outside the data center floor, in order to include centralized power equipment in the capacity and change planning

7 APC by Schneider Electric– Capacity Manager – June 2008 Graphical power gauge Prevent overloads through visibility to average and peak power usage by measuring actual consumption through APC’s metered or switched rPDUs Graphical power gauge Prevent overloads through visibility to average and peak power usage by measuring actual consumption through APC’s metered or switched rPDUs Multi-user access Enables several users to carry out work orders and plan future moves, adds or changes simultaneously Multi-user access Enables several users to carry out work orders and plan future moves, adds or changes simultaneously Localization User interface available in major local languages Localization User interface available in major local languages

8 All content in this presentation is protected – © 2008 American Power Conversion Corporation Capacity Reports Shows planned and actual power data in one view, enabling detailed planning of future power needs Capacity Reports Shows planned and actual power data in one view, enabling detailed planning of future power needs 3-phase load balancing Track single and 3-phase applications, ensuring all 3 phases on the power system carries a balanced load 3-phase load balancing Track single and 3-phase applications, ensuring all 3 phases on the power system carries a balanced load Power dependency path Map the power path and physical system relationships and dependencies Power dependency path Map the power path and physical system relationships and dependencies Device catalog Utilize the extensive library of physical infrastructure and IT devices from leading vendors. Device catalog Utilize the extensive library of physical infrastructure and IT devices from leading vendors.

9 APC by Schneider Electric– Capacity Manager – June 2008 Virtual store room Keep track of new devices from arrival on site in the virtual store room Virtual store room Keep track of new devices from arrival on site in the virtual store room Floor layout View an accurate representation of your data center through the easy to use graphical floor layout and birds eye view Floor layout View an accurate representation of your data center through the easy to use graphical floor layout and birds eye view Custom Devices Quickly customize catalog devices to your specification in just 2 clicks, amending data points such as power requirements Custom Devices Quickly customize catalog devices to your specification in just 2 clicks, amending data points such as power requirements Keyword tagging Highlight location constraints through keyword tagging of data center racks or equipment Keyword tagging Highlight location constraints through keyword tagging of data center racks or equipment

10 APC by Schneider Electric– Capacity Manager – June 2008 The APC Management Process Single Instance in TimeRevolving Cycle of Constant Change

11 APC by Schneider Electric– Capacity Manager – June 2008 Post-Sales Support and Services OfferingDescription Service Starter Pack Hands-On Workshop designed around the InfraStruXure Central, Capacity Manager, and Change Manager applications. Includes the Data Center Start-Up Workshop which provides basic configuration, guidance, and training. Asset Management System Migration Service An APC-MGE Software Engineer navigates the customer through the migration from their existing system. Configuration Service Includes configuration of InfraStruXure Central, Capacity Manager and/or Change Manager and the assessment of existing equipment to release the fully power of the system Software System Integration Service Provides guidance on integrating into an existing system including defining the optimal integration. Software Enhancement Service Enables the customer to keep IT solutions flexible. Training Service Customized training to ensure that the customer’s staff acquires the knowledge needed to support management of data center solution.

12 APC by Schneider Electric– Capacity Manager – June 2008 Capacity Manager Selection Pricing based on # of Racks: ●Add Capacity Manager Licenses ●Add Capacity Manager Software Support (min. 12 months) Prerequisites for all solutions: ●InfraStruXure Central Server ●InfraStruXure Central Software Support (min. 12 months) ●APC Metered or Switched rPDU in each rack

13 APC by Schneider Electric– Capacity Manager – June 2008 Capacity Manager Related Products InfraStruXure Central Server {pre-requisite} An IT-ready, scalable monitoring system which collects, organizes, and distributes critical alerts, surveillance video and key information, providing a unified view of complex physical infrastructure environments from anywhere on the network InRow Cooling In-row precision air conditioning for medium to large data centers including high density applications Metered or Switched Rack PDU Comprehensive rack power distribution solutions for every IT environment from networking equipment to high density blade server applications Change Manager Fully integrated asset and inventory management for your IT physical infrastructure

14 APC by Schneider Electric– Capacity Manager – June 2008 Capacity Manager Summary Balance IT Demand with Physical Infrastructure Capabilities Planning and optimizing utilization of actual power, cooling and rack capacities via shared data center model, enabling efficient equipment provisioning and right-sizing of your data center ●Predictable Planning ●Predicts the optimal location for physical infrastructure and rack- based IT equipment based on the availability and requirements of power, cooling and space; and user defined criteria such as redundancy and business use grouping. ●Capacity Analysis ●A sophisticated modeling engine, based on real-time data, proactively analyzes the impact of changes before they occur, enabling informed decision making and planning. The result: assurance that your physical infrastructure provides the redundancy, run time and availability required. ●Inventory Management ●Robust inventory management application provides a visual model of the room and rack layout. Rack-level views enable easy tracking of IT assets and available space. A detailed, user definable catalog of IT equipment provides device information and physical attributes


Download ppt "All content in this presentation is protected – © 2008 American Power Conversion Corporation Rael Haiboullin System Engineer Capacity Manager."

Similar presentations


Ads by Google