Download presentation
Presentation is loading. Please wait.
Published byMarlene Thornton Modified over 9 years ago
1
NETC N6 Status Update on AIM in the NETC Enterprise Architecture 23 Aug 11 Bruce Bare, NETC, N62 Jake Aplanalp, NAWCTSD, AIM Pgm Mgr
2
Overview Training Delivery and Management Strategic Plan AIM Migration Plan AIM I-II/CPM/LO Module Interfaces with Atlas Pro LO Module ‘Webification’
3
Training Delivery and Management Strategic Plan Training Delivery and Management Strategic Plan
4
AIM Migration Plan As tasked by NETC N6/N7, the Migration Plan defines AIM Program plan for moving forward: ‒from the traditional stand-alone/LAN-based AIM I / AIM II baseline ‒to implement both near-term, enterprise-wide systems for managing the 250,000+ hours of traditional AIM I/AIM II LP/TG- based content now in place and ‒updated Content Planning Module (CPM) and Learning Object (LO) Module tools to support NETC’s new content formats and business rules per NAVEDTRAs
5
AIM Migration Plan Contents Maintenance of traditional AIM I/AIM II capabilities and implementation of Learning Center-based Central Site instances hosted by NETPDTC Migration of traditional AIM I/AIM II learning content to NETC N7/NAVEDTRA 136 business processes and rules using AIM CPM and LO Module Enhancements to CPM and LO Module Interfaces between the AIM toolset and other NETC enterprise software tools: ‒Corporate enterprise Training Activity Resource System (CeTARS) ‒Atlas Pro toolset (LMS, ROCCE learning content creation, Assessment Engine, and Survey Engine components)
6
AIM Migration Plan Schedule
7
AIM I-II / CPM / LO Module Interfaces with Atlas Pro
8
AIM I/AIM II and Atlas Pro LMS
9
CPM/LO Module and ROCCE/LMS
10
AIM Tools and Assessment/Survey Engines
11
LO Module ‘Webification’ Business case analysis Functional benefits Integration with other NETC training enterprise architecture
12
LO Module ‘Webification’ Schedule
13
Questions?
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.