Download presentation
Presentation is loading. Please wait.
Published byMitchell Black Modified over 9 years ago
1
Spectrum 50 & 100 FIC Systems Up to 64 Dispense Points Up to 64 Dispense Points 1 to 4 Fluids 1 to 4 Fluids Printed Dispense Records Printed Dispense Records Tank Data & Low Level Alert Tank Data & Low Level Alert Simple Wiring Architecture Simple Wiring Architecture Built-in Diagnostics Built-in Diagnostics
2
Spectrum 50 & 100 Specifications Capacity Capacity –3 or 4 fluids x 16 bays, 2 fluids x 32 bays, 1 fluid x 64 bays (100) –2 fluids x 12 bays, 1 fluids x 24 bays (50) Meter Accuracy Meter Accuracy –1% or less error –Custom calibration factor –Field calibration procedure Job Queue and Concurrent Dispensing Job Queue and Concurrent Dispensing –Concurrent dispense of unlike fluids only –Job queue of 4 jobs (plus active job) per fluid
3
Spectrum 50 & 100 Specifications System Power and Control System Power and Control –Single power input, 110 VAC –Use UPS power conditioner rated 80 watts –Devices use 24 VDC –System wiring network may extend 1100 ft from the console Record Handling Record Handling –Optional Host PC interface (100): job history analysis –Ticket Printer –Internal Console storage of approx 250 job records Operating Security Operating Security –User PIN code system –4 levels of PIN security –Start up, programming, dispense authorization
4
Spectrum 50 & 100 Specifications Tank Level Information Tank Level Information –Additions must be recorded –Deletions are calculated from meter flow –Low level prompt at console Operating Pressure & Flow Range Operating Pressure & Flow Range –Fluid valves 1500 psi –Air valves 200 psi –Impulse meters 1000 psi –Accurate flow range 0.25 to 6.0 gpm Ready Lights Ready Lights –Installed in.500 dia sheet metal hole
5
Spectrum 50 & 100 Specifications Diagnostics Diagnostics –Self-test at start up –Communication self-checking during dispenses –No-flow detection at meters –Coded error messages at the console display Compatible Fluids Compatible Fluids –Motor and Gear Oils, including Synthetic –ATF –Antifreeze –WW fluid (requires special fluid solenoid valve
6
Spectrum 50 & 100 Components Console Console –Activates jobs –System information Smart Controller Smart Controller –4 control ports –Power and dispense comm Air Solenoid Valve Air Solenoid Valve –3/8 NPT ports –24 VDC Fluid Solenoid Valve Fluid Solenoid Valve –1/2 NPT ports –24 VDC
7
Spectrum 50 & 100 Components Impulse Meter Impulse Meter –Use 1 per pump –1000 psi pressure rating –Calibration factor on meter Ready Light Ready Light –Fits.500 hole –Mount in reel or oil bar Pressure Relief Kit (not shown) Pressure Relief Kit (not shown) –Relief built in to most pumps –Relief required for Spectrum Y-Strainer Y-Strainer –Use 1 per reel –Mount ahead of fluid valve
8
Spectrum 50 & 100 Components Ticket Printer Ticket Printer –Standard roll paper –Reorder form for ink tape –6 ft from console Host PC Interface Host PC Interface –For batch history only –1 per installation –Cannot use with ticket printer –Complete array of reports Cables Cables –3 styles –Minimize cable runs –Available in popular lengths
9
Spectrum 50 & 100 A Tour of the Service Bulletin Contents Contents Specifications Specifications Configuration Planning Configuration Planning Installation Installation Operation Operation Set Up & Diagnostic Procedures Set Up & Diagnostic Procedures Diagnostic Message Interpretation Diagnostic Message Interpretation Repair and Upgrade Procedures Repair and Upgrade Procedures Cable Specs Cable Specs PIN code record form PIN code record form
10
Spectrum 50 & 100 Configuration Planning Arrangement of Information Arrangement of Information Form Completion Instructions Form Completion Instructions Generating the Equipment List Generating the Equipment List Verifying the Equipment Order Verifying the Equipment Order Guide for Installation Guide for Installation Guide for Repairs and Upgrades Guide for Repairs and Upgrades
11
Spectrum 50 & 100 Configuration Planning Working some Examples Working some Examples
12
Spectrum 50 & 100 Factory Programming Using the Planning Sheet Using the Planning Sheet Initialization Initialization Fluid Identification Fluid Identification SC Identification SC Identification Comm Port Select Comm Port Select Set Time/Date Set Time/Date System Configuration System Configuration
13
Spectrum 50 & 100 Installation Tips Product component placement Product component placement Wire end terminations Wire end terminations Resistors Resistors Use specified Spectrum components Use specified Spectrum components Lost PIN codes Lost PIN codes Meter PPG value Meter PPG value Place SC’s at a reachable height Place SC’s at a reachable height
14
Spectrum 50 & 100 Installation Tips Use the service manual Use the service manual Call for programming help Call for programming help Respect distance limits Respect distance limits Printer on Printer on Console connector Console connector Power off when rewiring Power off when rewiring Train the user: operation, PIN codes Train the user: operation, PIN codes Place SC’s at a reachable height Place SC’s at a reachable height
15
Spectrum 50 & 100 Diagnostics Write down complete error message Write down complete error message Get out the service manual Get out the service manual Get out the configuration planning sheet Get out the configuration planning sheet Call Balcrank Call Balcrank Don’t initialize the console Don’t initialize the console Restore by downloading backup configuration Restore by downloading backup configuration Isolate an error using zone programming Isolate an error using zone programming
16
Spectrum 50 & 100 Diagnostics & Wiring Problem Diagnostics Demo Problem Diagnostics Demo Wiring Prep Kit Demo Wiring Prep Kit Demo
17
Spectrum 50 & 100 Operation Authorizing and Dispensing a Job Authorizing and Dispensing a Job Deleting a Job Deleting a Job Jobs in Queue Jobs in Queue Modifying the Queue Modifying the Queue Inspecting Tank Levels Inspecting Tank Levels Recording a Tank Refill Recording a Tank Refill
18
Spectrum 50 & 100 Operation Dispense Operations Demo Dispense Operations Demo
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.