John Sing/San Jose/IBM April 4, 2012
Copy / refresh data off back end of IBM DS8000 Global Mirror, using Global Copy Prepared for IBM Strategic Outsourcing
2
31 years of experience with IBM in high end servers, storage, and software
Present: IBM Systems Group Executive IT Consultant – IT Strategy and Planning, Enterprise Storage, Big Data Analytics, HA/DR/BC, WW Technical Marketing : IBM WW Business Continuity, IT HA/DR, IT Strategy : IBM Storage Subsystems Group - Enterprise Storage Server Marketing Manager, Planner for ESS Copy Services (FlashCopy, PPRC, XRC, Metro Mirror, Global Mirror) : IBM Hong Kong, IBM China Marketing Specialist for High-End Storage : IBM USA Systems Center Specialist for High-End S/390 processors : IBM USA Marketing Specialist for S/370, S/390 customers (including VSE and VSE/ESA) You may follow my daily IT research mini-blog IBMers may access my IBM Intranet webpages: John Sing
3
Migrating data with Global Copy
Disk subsystem based asynchronous replication solution Supported on ESS, DS6000 and DS8000 for all data types Failover/failback capability reduces requirements for full copy Incremental changes copied after a test and in case of return to original location Bitmaps used to track data required to be sent Minimal performance impact and does not use additional cache Global Copy With Global Copy an outage is required to create consistent copy Using Global Mirror or converting to Metro Mirror allows migration to be tested without production outage Supports very long distances Migrations performed from UK to Germany, Chile to Spain etc Fibrechannel connectivity between disk subsystems Extension equipment used to provide connection over WAN
4
Definitions: Global Copy
Remote Source Data migration / copy Use Global Copy to effect large data movement With minimal relocation effort and minimal amount of volumes B M Setup DS8000 Global Copy environment Start and monitor initial copy B to M SUSPEND with Go-To-Sync Consistency Group Establish incremental change tracking on both B and M Test on M Once test over, reset and incrementally resync B to M for next test of cutover. Automatically resets M properly
5
DS8000 Global Copy Operation
PRIMARY SECONDARY Global Copy Non-synchronous Transfer Objective: efficiently move data with low overhead, keep the line highly utilized VOLUME B VOLUME M (Fuzzy) DS8000, DS6000, ESS Global Copy is continuous cycle through volume bitmap Updates to tracks/sectors on volume/LUN noted by bitmap Send only changed tracks, using pre-deposit write If all changes in cache, send changed sectors only No host I/O wait for updates to be sent to the secondary 1 4 5 3 Note that DS8000 Global Copy does not send data in same order it was written Objective is to move large amounts of data with low overhead, and keep telecom line very well utilized Global Copy is continuous cycle through volume bitmap (continually stays in PPRC Establish Phase 1) Any updates to tracks/sectors on volume/LUN are noted by turning bit on in bitmap Non-synchronous copy operation - no host I/O wait for updates to be sent to the secondary A queuing algorithm schedules each volume for subsequent scans of their changed bitmap Send only changed tracks dataDS8000 Global Copy (PPRC-XD) If all changes in cache, send changed sectors only Global Copy sends data in performance sequence Result is 'fuzzy copy' at Remote site Consistency can be created by command Quiesce workload at site A and allow B to catch up or… Go to Sync (goto PPRC Establish Phase 2) or Add the Global Copy volumes to a Global Mirror session 2 Note that the remote site data is in a 'fuzzy’ state VOL B PPRC BITMAP VOL M PPRC BITMAP ‘M’ consistency can be created by: Quiesce workload at site B and allow M to catch up Go to Sync (command copying to become Metro Mirror) Add the Global Copy volumes to a DS8000 Global Mirror session Incoming Writes
6
General Data Center migration concept using DS8000 Global Copy
Future PROD location Production B M Overview of Global Copy use for data center migration Setup Global Copy (PPRC-XD) environment Start and monitor initial copy B to M SUSPEND with failover/failback change tracking on both B and M Test cutover on M Once test over, reset and incrementally resync B to M for next test of cutover. This automatically resets M properly After multiple successful tests, execute cutover We will adapt this methodology for use in your GM environment
7
Other ways to use DS8000 storage replication
Point-in-Time followed by remote mirror A B C D Point-in-Time followed by remote mirror followed by Point-in-Time
8
Other ways to use DS8000 storage replication - 2
B Point-in-Time from a remote mirror primary A C D Make a Point-in-Time safety copy of remote mirror
9
Other ways to use DS8000 replication
Async mirroring for Out of region recovery G
10
Other ways to use DS8000 replication
Migrate data from both ends of the A to C D/R link Older generation A devices to newer generation E devices Older generation C devices to newer generation G devices Without impacting D/R protection on A to C link A C E G
11
Incremental Resynchronisation bitmaps
The Global Copy and Global Mirror incremental resynchronisation functions allows bitmaps to be created for sending only changed data Avoids ever having to do full copy Disk subsystems can track what data blocks have changed, and can send only changed data Minimizes time, saves bandwidth
12
Notes Assume that building automation of all these steps is a necessity Migrate a test systems first, to get experience that can be applied to subsequent migration of large systems
13
Notes Circumventions may be possible to avoid using telecom to do initial loads over telecom By doing tape dumps followed by resyncs Those possibilities are outside the scope of this version of this document
14
Initial load of data to volumes at Cloud for testing
15
Start testing of migration data to Raleigh
Original While GM continues to run Start Global Copy pairs B to M B = GC primaries M volumes = GC secondaries M volumes = New Production volumes for testing and eventual production This does initial load of M D/R GM B A GM CG volumes C GC Practice D/R Test volumes D M GM = Global Mirror GC = Global Copy Raleigh
16
Bring data to consistent state for test at Raleigh
Goals are: No production outage or impact Minimize impact to DR protection to greatest extent reasonable
17
Definitions: Failover/Failback Suspend
Is always issued to a secondary volume Tells that volume that "now you're a suspended primary" Starts change tracking Is never issued to a primary volume You'll get a message: "improper state" You do specify the secondary and primary volumes Does not have to have paths/connections available to the primary, will work if there's no connections Failback: Is issued to whichever volume is going to become the new primary That new primary then communicates to the secondary volume You always must specify which volume is primary and which volume is secondary Hence, must have paths and connections active and avail to the secondary, else command won't complete Suspend Stops mirroring of data to the secondary volume Starts keeping record of the primary volume tracks that are updated. That info will be used later when the pair is re-established, to copy just the updated tracks You specify the primary and secondary volumes to be suspended ‘B‘ Primary ‘M’ Secondary
18
Initial starting point
While GM runs: Global Copy is copying changes B to M thus keeping M quasi-current Data lag at M is short Only a few seconds Original D/R GM B A GM CG volumes C GC Practice D/R Test volumes D M GM = Global Mirror GC = Global Copy Raleigh Green = prod Orange = inconsistent data Blue – consistent data
19
Start process to bring M volumes to consistent state
Issue Pause GM session A->B GM stops forming consistency groups Issue Suspend to GC pairs at A Starts incremental change tracking at A Original D/R GM session Pause and Suspend GC pairs B A GM CG volumes C GC Practice D/R Test volumes D If Global Mirror is running between A and B, to suspend the Mirroring, there are actually two sessions to suspend: The Global Mirror session The Global Copy session that underlies the Global Mirror session Both sessions must be suspended M Raleigh Green = prod Orange = inconsistent data Blue – consistent data
20
Incrementally forward Consistency Group C volumes to Raleigh M
At B: Issue Suspend with Failover to B volumes Makes B suspended primary; note that B to M is still running Restore GM CG onto B Revertible check FlashCopies Fast Reverse Restore C to B Recreate FlashCopies B to C Wait till B->M Global Copy has reached zero out of sync tracks Incrementally forward Consistency Group C volumes to Raleigh M Original D/R GM session Pause and Suspend GC pairs B A GM CG volumes C GC Practice D/R Test volumes D If Global Mirror is running between A and B, to suspend the Mirroring, there are actually two sessions to suspend: The Global Mirror session The Global Copy session that underlies the Global Mirror session Both sessions must be suspended Note: do not do Recover on GM, that puts B in Simplex, which we don’t want! M Raleigh RPO at D/R is aging while GM A-B is stopped However, this process to refresh M will be fast As M was only a few seconds behind B Therefore, elapsed time until GM A to B is restarted, will be short
21
Status of B and M after new CG copied thru B to M
GC completes copy of incremental changes B to M Duration of the remaining incremental changes is proportional to: Amount of out of sync data not yet copied to M plus… Amount of any data that needs to be reset at M Soon, B =M Original D/R GM session Pause and Suspend GC pairs B A GM CG volumes C GC Practice D/R Test volumes D M Raleigh Green = prod Orange = inconsistent data Blue – consistent data
22
Suspend Global Copy pairs B->M
As soon as B =M Issue Suspend to B volumes to start change tracking B to M Issue Failover to M volumes Makes M suspended primary Starts incremental change tracking at M Original D/R GM session Pause and Suspend GC pairs B A GM CG volumes GC suspended at B to M with change tracking on C Practice D/R Test volumes D M M Volumes become Suspended Primaries, with change tracking on Raleigh Green = prod Orange = inconsistent data Blue – consistent data
23
Restart GM Original - D/R
Issue Global Copy Failback to A volumes Causes resync to start on GC pairs on A->B (incremental changes only sent) Then restart GM session A to B A standard GM resume / start D/R on Original – D/R is re-established Original D/R GC resync B A GM GM CG volumes C GC suspended at B to M with change tracking on Practice D/R Test volumes D M M Volumes are Suspended Primaries, with change tracking on Raleigh Green = prod Orange = inconsistent data Blue – consistent data
24
Copy data from M volumes to Cloud
Original Can now copy consistent test data M to Cloud Changes are tracked on M For later reset during next refresh cycle D/R GM B A GC suspended at B to M with change tracking on Cloud GM CG volumes C Practice D/R Test volumes D M M Volumes are Suspended Primaries, with change tracking on Raleigh Green = prod Orange = inconsistent data Blue – consistent data
25
Original D/R GM B A C GC D M
When finished with test, use Global Copy to refresh B to M, in prep for next refresh cycle While GM continues to run At B: Issue a Failback to B Makes B primary and M secondary Resync of changed data starts flowing again from B to M Also resets any data changed at M during test Original D/R GM B A GM CG volumes C GC Practice D/R Test volumes D M GM = Global Mirror GC = Global Copy Raleigh Green = prod Orange = inconsistent data Blue – consistent data
26
Thank You Thank You Gracias Tesekkurler Obrigado Grazie Danke Merci
Hebrew Hindi Tesekkurler Traditional Chinese Thank You Thank You Russian Turkish Gracias English Spanish Arabic Obrigado Grazie Brazilian Portuguese Italian Japanese Some pronunciations (as best I can, for the ones I know): Chinese: xie-xie Russian: spa-si-ba Korean: kam-ya-ti-da Others welcome to be added to this chart over time. Thx to Curtis Neal/San Jose/IBM, for giving me the original version of this chart, which I’ve expanded a little. John Sing IBM Systems and Technology Group, San Jose, California, USA Februaryu 2009 Danke Thai Merci German French Simplified Tamil Chinese Korean
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.