Download presentation
Presentation is loading. Please wait.
Published byMarylou Bradford Modified over 9 years ago
1
Hydrostatic Level Systems at Fermilab and SURF J Volk V Shiltsev Fermilab A Chupyra M Kondaurov S Singatulin Budker Institute of Nuclear Physics D Fratta, A Meulemans, C Potier, H Wang University of Wisconsin Madison
2
Systems NameLocationSensor typeNumber of sensors separation MINOS-2MINOS hall Fermilab SAS-E1010 m LaFargeNorth Aurora Ill SAS530 m Array CSURF Lead South Dakota SAS-E630 m NMLNML Fermilab SAS4Varies MP7MP7 FermilabULSE320 m Stability testMP8 FermilabSAS12 MT ULSEMP8 FermilabULSE121 m Sept 13, 2012IWAA 20122
3
MINOS layout Sept 13, 2012IWAA 20123 MINOS Detector Nova Cavern under construction
4
MINOS-2 Sept 13, 2012IWAA 20124
5
Typical MINOS data August 2012 Sept 13, 2012IWAA 20125
6
Sept 13, 2012IWAA 20126
7
MINSO Data Feb 12 to Aug 31 Sept 13, 2012IWAA 20127
8
Array C layout Sept 13, 2012IWAA 20128
9
HLS at 2000 ft level on rock bolt shelf Rock bolt Sensor Air line Water line Sept 13, 2012IWAA 20129
10
Difference in two sensors 2000 ft level SURF Sept 13, 2012IWAA 201210
11
Difference in two sensors 60 meters apart SURF 2000 foot level Sept 13, 2012IWAA 201211
12
LaFarge Mine Sept 13, 2012IWAA 201212
13
LBNE beam line Sept 13, 2012IWAA 201213
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.