1
Concrete Over site 300mu DPM / 1200 gauge (Tape all joints with Polythene Tape) Floor finish 50mm Gvylon screed 250mu DPM -clear plastic (Tape joints with 50mm duck tape) Under floor heating Insulation / Celotex – (Tape joints with 100mm foil tape) Under floor heating Edge Strip Fix the edge insulation continuously around all internal and external wall edges – including soil stacks and pipes
2
Concrete Over site 300mu DPM Floor finish 40mm Gvylon screed 250mu DPM Under floor heating Insulation / Celotex Electric Under floor heating Edge Strip Fix the edge insulation continuously around all internal and external wall edges – including soil stacks and pipes
3
Concrete Over site 300mu DPM Floor finish min 30mm Gvylon screed Standard floor Edge Strip Fix the edge insulation continuously around all internal and external wall edges – including soil stacks and pipes
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.